jschoubben e25fdf776f Make the store-tests step fail on a malformed line, a failed go test and a shortened list
mesh/merge-gate pass: the change touches no module of the mesh's graph
mesh/repo-check pass: THE CHANGE ALTERS ITS OWN CHECK (merge-check.sh): main's version judged it; the change's judges the pull requests after it merges; it…
mesh/delivery delivered
The step let tests escape it: a one-field line ran nothing, go test's exit
status was ignored, a pull request could drop entries main lists, and a
result written mid-line by go test -v read as NOT RUN, hiding a FAIL
(novox/hq issue 515).
2026-10-12 00:28:32 +02:00
jschoubben 731143f5b9 Fail the repo check when a listed store test did not run against the store (hq issue 459)
mesh/merge-gate pass: builds build-agent → ace, g14, novox, shanks; no bus step; every machine composes with the change as it did without (4 of 4 compose)
mesh/repo-check pass: THE CHANGE ALTERS ITS OWN CHECK (merge-check.sh): main's version judged it; the change's judges the pull requests after it merges; it…
mesh/delivery covered after its stop: a later merge that contains it was delivered: novox/mesh-controller@e2801773c300 (merged as ece37596 into main, wal…
A test that needs the store skips without one, and a skip passes unseen, so a
change's store tests could pass the check without ever running. Tests named in
testdata/store-tests must each run and pass, said by name.
2026-10-11 20:22:56 +02:00
jochen 14127d4878 Let the module graph decide what a pull request's check runs, in two layers (hq ADR 0237)
Every pull request the forge announces is mapped onto the mesh's module graph by the
merge handler's rule (issue 278): touching a module — or adding one — runs the gate
(mesh/merge-gate), its judge chosen by the graph (the controller judges itself, the
node-engine by its validator); a repository of the mesh that touches none runs only its
own merge-check.sh (mesh/repo-check), a warning when it has none. Nothing is left pending:
a repository outside the mesh touching nothing is told so as a pass.

The gate moves out of the per-repository scripts into the build seat, so a script is the
repository's own tests and declares its toolchain (go or typescript). The controller's
manifest names every verb of its seat again (ADR 0132), held by a test.
2026-10-06 22:34:56 +02:00
jochen 9c714f00d6 Judge every pull request against the mesh that runs, before it merges (hq ADR 0237, to-be 45 §9)
Every check the mesh had ran after a merge, on a machine: a manifest the node-engine refused
(236), an identity a real machine's name made too long (263). merge-gate raises the mesh as the
facts snapshot says it is and the mesh with the change, each in a throwaway store through the
controller's own records, composes every machine twice and validates it with the node-engine's
validator, and fails what the change breaks, naming the machine's roles and the module - plus a
manifest the judging controller cannot read, a consumer left out of its grant, a module removed
while a machine runs it, a new module the node-engine would refuse; it warns on a wide rebuild.

The forge's new head of a pull request becomes a check the controller asks of the build seat:
the head and, beside it, the controller the mesh runs, the catalogue, the host and the lab; a
throwaway store and bus of the versions the mesh runs; the repository's merge-check.sh in the
mesh's Go toolchain with no container runtime socket; then mesh-lab's replays. The verdict is
said as checked, an error never a pass, and nothing is recorded or registered.