Commit Graph
8 Commits
Author SHA1 Message Date
jochen fcfbf7e69e Name the account agents run as on a node, and say whether it can become root
On the control node every agent ran as the operator's account, which has
passwordless sudo, so an agent could become root without a person (hq ADR
0266). A node now names an agent account at the controller's terminal only;
the agent's module declares it never to become root, the node-engine judges
that, and the self-check (DA) raises agent-can-become-root while it does not
hold, so ADR 0259's router can rest on it.
2026-10-09 10:11:21 +02:00
jochen 8984c3437f Leave out a block its holder cannot render, and keep if-capability to known names on offered kinds (hq ADR 0255)
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
mesh/repo-check pass: its merge-check.sh passed
mesh/delivery superseded: a newer delivery to the same trunk took over its walk
A piece whose shows the holder's template does not know rendered as nothing and failed
the whole machine's declaration; it is now left out and named, for push, plan and the
merge gate. quote escapes DEL, which TOML refuses bare. An if-capability nothing
detects, or on a kind a holder depends on, would drop a piece silently, so both are
refused.
2026-10-08 15:20:59 +02:00
jochen 56b206fe04 Cite the hq issues by the numbers they were given: 285, 286, 287
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
mesh/repo-check pass: its merge-check.sh passed
mesh/delivery covered: a later merge that contains it was delivered: novox/mesh-controller@6faf701656fe (merged as c714d077 into main, walk plan-17914198…
(cherry picked from commit 8bf7026d97)
2026-10-08 01:42:22 +02:00
jochen a011743c69 Raise the mesh as it is in the gate, call a baseline that does not compose an error, and let a check run by hand as the seat runs it
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
mesh/repo-check pass: its merge-check.sh passed
mesh/delivery superseded: a newer head of the same pull request
The gate composed 0 of 4 machines with the change and without, and passed every change: the store it
raised held each module's bus credential but no account for it (issue 203's refusal), no outward links
(so no filter could be composed), and refused settings the mesh holds. Now the account is minted with
its credential, the facts carry each machine's outward links (a stand-in for an older snapshot), the
mesh's layers are kept as held, and a withheld path keeps a path's shape. A machine the mesh composes
that the gate cannot raise makes the verdict an error, never a pass; the verdict alone is on stdout.

A merge-check.sh that passed on an agent's machine failed on the build seat: a newer gofmt, siblings at
a feature branch, another user. `mesh-controller check-here` runs builder.Check with the ask the
controller would make, from facts that now name the toolchains and the refs cloned beside; a failed
script is said by what failed. (novox/hq issues 282, 283)
2026-10-07 01:33:18 +02:00
jochen 487aa040de Let a walk wait for its delivery's word, and serve the delivery's owner (hq ADR 0239)
mesh/merge-gate pass: every machine composes with the change as it did without (0 of 4 compose)
mesh/delivery delivered
mesh/delivery-group group feat/mesh-delivery delivered: every member is delivered
While the mesh-delivery seat has a holder on record, a merge that moves no
core module opens its walk and asks nothing until mesh-delivery or a person
says go; nothing of it is registered before its turn, so no other send
carries it. The controller keeps the planner, the gate, sending and the
walk, and gains the verbs the owner asks with: delivery-plan, -order,
-check (a group composed as one future state), deliver, delivery-stop,
delivery-walks; every walk kept is said as plan-moved.
2026-10-07 00:01:42 +02:00
jochen 58ebe590a5 Ask the planner what a pull request reaches; map a changed file onto modules in one place (hq ADR 0238)
touchedBy is now the only mapping of changed files onto modules — touched, added, and
read by no build — and reachOfMerge the planner's whole answer with the dependency walk.
The merge handler, the plan what-if, the merge gate's width and composition, and a pull
request's check all ask it, so planning and gating cannot disagree. The gate composes
the definitions of the modules a merge would rebuild or add, not every one in the tree,
and the check says the dependents a merge would build after them.
2026-10-06 22:34:57 +02:00
jochen b24bb030ec A changed file touches exactly the modules whose build reads it (hq issue 280, ADR 0237)
The builder reads a module's own directory (the repository for one built from its root)
and a repository its recipe packages, nothing else. A file in no module's directory was
read as shared code and rebuilt everything built from the repository: 103 modules for a
merge-check.sh added at the catalogue's root. It now touches nothing, in the merge
handler, the release planner and the pull request's check alike, and the gate says so.
2026-10-06 22:34:57 +02:00
jochen 9c714f00d6 Judge every pull request against the mesh that runs, before it merges (hq ADR 0237, to-be 45 §9)
Every check the mesh had ran after a merge, on a machine: a manifest the node-engine refused
(236), an identity a real machine's name made too long (263). merge-gate raises the mesh as the
facts snapshot says it is and the mesh with the change, each in a throwaway store through the
controller's own records, composes every machine twice and validates it with the node-engine's
validator, and fails what the change breaks, naming the machine's roles and the module - plus a
manifest the judging controller cannot read, a consumer left out of its grant, a module removed
while a machine runs it, a new module the node-engine would refuse; it warns on a wide rebuild.

The forge's new head of a pull request becomes a check the controller asks of the build seat:
the head and, beside it, the controller the mesh runs, the catalogue, the host and the lab; a
throwaway store and bus of the versions the mesh runs; the repository's merge-check.sh in the
mesh's Go toolchain with no container runtime socket; then mesh-lab's replays. The verdict is
said as checked, an error never a pass, and nothing is recorded or registered.
2026-10-06 21:11:26 +02:00