Replay issues 292 and 298 as tests the commit before each fix fails (hq ADR 0237) #129

Merged
mesh-admin merged 1 commits from replays/292-298 into main 2026-10-07 23:41:44 +00:00
Contributor

Two replays for hq issues 292 and 298, so both can resolve with replay: (ADR 0237).

  • R292 cmd/mesh-controller/replay292_test.go: the two drills of 2026-10-07, recorded through hand-act record --cause drill, want no healer from S15. It is in its own file because replays_test.go holds replays of later commits that do not build at #109's parent.
  • R298 internal/catalogue/replays_test.go: the delivery seat's holder holds the seat both before and after it serves checks, so neither repository has to merge first.

Both tests use only what the code had before each fix. mesh-lab's prover says PROVED for both: R292 fails on 582f4a0 and passes on 863ebd4 (#109); R298 fails on e550c95 and passes on f6aea4b (#117).

Registered in novox/mesh-lab (branch replays/292-298). That register points at this branch's commit 80f9d26 as Home, so it needs this PR merged with a merge commit, not a squash.

Two replays for hq issues 292 and 298, so both can resolve with `replay:` (ADR 0237). - **R292** `cmd/mesh-controller/replay292_test.go`: the two drills of 2026-10-07, recorded through `hand-act record --cause drill`, want no healer from S15. It is in its own file because `replays_test.go` holds replays of later commits that do not build at #109's parent. - **R298** `internal/catalogue/replays_test.go`: the delivery seat's holder holds the seat both before and after it serves `checks`, so neither repository has to merge first. Both tests use only what the code had before each fix. mesh-lab's prover says PROVED for both: R292 fails on 582f4a0 and passes on 863ebd4 (#109); R298 fails on e550c95 and passes on f6aea4b (#117). Registered in novox/mesh-lab (branch replays/292-298). That register points at this branch's commit 80f9d26 as Home, so it needs this PR merged with a merge commit, not a squash.
mesh-admin added 1 commit 2026-10-07 23:27:56 +00:00
Replay issues 292 and 298 as tests the commit before each fix fails (hq ADR 0237)
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
mesh/repo-check pass: its merge-check.sh passed
mesh/delivery delivered
mesh/delivery-group group replays/292-298 merged: every member is merged
80f9d26e6d
R292: two drills recorded through hand-act record want no healer.
R298: the delivery seat's holder holds it before and after it serves checks,
so neither repository has to merge first.
Author
Contributor

Delivery novox/mesh-controller@80f9d26e6d4c — delivered since 2026-10-08T00:02:49Z

Delivery plan — builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step

  • tier 0: mesh-controller
  • tier 1: build-agent
  • tier 2: route-proxy
  • ace: receives build-agent, route-proxy
  • g14: receives build-agent
  • novox: receives mesh-controller, build-agent, route-proxy
  • shanks: receives build-agent
  • build-agent keeps data (ADR 0233): what it holds is backed up before it moves
  • route-proxy provides route: its consumers are sent again after it
  • route-proxy keeps data (ADR 0233): what it holds is backed up before it moves

Group replays/292-298, in order: novox/mesh-controller@80f9d26e6d → novox/mesh-lab@d0b0c7b02a

  • composed together: pass — every machine composes with the change as it did without (4 of 4 compose)

Machines

  • mesh-controller on novox: passed — healthy 3 times over 3m40s
  • mesh-controller on the rest running it: sent
  • build-agent on ace: passed — healthy 3 times over 2m20s
  • build-agent on the rest running it: sent
  • route-proxy on ace: passed — healthy 3 times over 3m15s
  • route-proxy on the rest running it: sent

Transitions

  • 2026-10-07 23:28 (new) → proposed (announced): novox/mesh-controller#129's head announced
  • 2026-10-07 23:38 proposed → checked (checked): the verdict names this commit
  • 2026-10-07 23:38 checked → ready (accepted): the gate passed or warned, and the repository's own check did not fail
  • 2026-10-07 23:42 ready → published (merged): on the trunk its modules follow: merged there, and its walk opened — or nothing for a walk to move
  • 2026-10-07 23:42 published → delivering (go): its walk started: let go by this owner in its group's order, by a person, or on the controller's own path
  • 2026-10-08 00:02 delivering → delivered (done): its walk is done: every machine of its deploy plan passed, or was left as its policy says

The commit's note under refs/notes/mesh-plan keeps every transition: git log --notes=mesh-plan.

<!-- mesh-delivery:view --> **Delivery** `novox/mesh-controller@80f9d26e6d4c` — **delivered** since 2026-10-08T00:02:49Z **Delivery plan** — builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step - tier 0: mesh-controller - tier 1: build-agent - tier 2: route-proxy - ace: receives build-agent, route-proxy - g14: receives build-agent - novox: receives mesh-controller, build-agent, route-proxy - shanks: receives build-agent - build-agent keeps data (ADR 0233): what it holds is backed up before it moves - route-proxy provides route: its consumers are sent again after it - route-proxy keeps data (ADR 0233): what it holds is backed up before it moves **Group** `replays/292-298`, in order: novox/mesh-controller@80f9d26e6d4c → novox/mesh-lab@d0b0c7b02aad - composed together: pass — every machine composes with the change as it did without (4 of 4 compose) **Machines** - mesh-controller on novox: passed — healthy 3 times over 3m40s - mesh-controller on the rest running it: sent - build-agent on ace: passed — healthy 3 times over 2m20s - build-agent on the rest running it: sent - route-proxy on ace: passed — healthy 3 times over 3m15s - route-proxy on the rest running it: sent **Transitions** - 2026-10-07 23:28 (new) → proposed (announced): novox/mesh-controller#129's head announced - 2026-10-07 23:38 proposed → checked (checked): the verdict names this commit - 2026-10-07 23:38 checked → ready (accepted): the gate passed or warned, and the repository's own check did not fail - 2026-10-07 23:42 ready → published (merged): on the trunk its modules follow: merged there, and its walk opened — or nothing for a walk to move - 2026-10-07 23:42 published → delivering (go): its walk started: let go by this owner in its group's order, by a person, or on the controller's own path - 2026-10-08 00:02 delivering → delivered (done): its walk is done: every machine of its deploy plan passed, or was left as its policy says The commit's note under `refs/notes/mesh-plan` keeps every transition: `git log --notes=mesh-plan`.
Author
Contributor

Merge check at 80f9d26e

  • mesh/merge-gate: PASS — every machine composes with the change as it did without (4 of 4 compose) (modules: build-agent, mesh-controller, route-proxy)
  • mesh/repo-check: PASS — its merge-check.sh passed

Delivery plan — builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step

  • tier 0: mesh-controller
  • tier 1: build-agent
  • tier 2: route-proxy
  • ace: receives build-agent, route-proxy
  • g14: receives build-agent
  • novox: receives mesh-controller, build-agent, route-proxy
  • shanks: receives build-agent
  • build-agent keeps data (ADR 0233): what it holds is backed up before it moves
  • route-proxy provides route: its consumers are sent again after it
  • route-proxy keeps data (ADR 0233): what it holds is backed up before it moves

Run by the build seat on shanks as build-1791415682759737809 (builds --log build-1791415682759737809).

--- the gate: build-agent, mesh-controller, route-proxy
mesh-controller: ok, 46 tool(s); WARNING: controller stay(s) up and say(s) not how it is ready — judged by liveness alone, refused from 2026-11-18 (ADR 0240 rule 8)
long-running resources without health: 1
1 manifest(s) checked. Judged against the seats this binary carries; a claim on one of the mesh's own seats is judged fully at registration, and a seat declared by a module not given here reads as unknown. Identities judged on a 6-character machine name, against the bounds of the providers given here
judging 0 module(s) changed against 4 machine(s), as the snapshot of 2026-10-07T22:47:27Z says they run
composing every machine as the mesh is
the bus's user list leaves out 5 user(s) the mesh has minted no credential for: controller, node.f35, node.idt, node.ygcyr, node.yvbpsm. Each is a user that cannot connect until one is issued
the bus's user list leaves out 5 user(s) the mesh has minted no credential for: controller, node.f35, node.idt, node.ygcyr, node.yvbpsm. Each is a user that cannot connect until one is issued
composing every machine with the change
the bus's user list leaves out 5 user(s) the mesh has minted no credential for: controller, node.f35, node.idt, node.ygcyr, node.yvbpsm. Each is a user that cannot connect until one is issued
the bus's user list leaves out 5 user(s) the mesh has minted no credential for: controller, node.f35, node.idt, node.ygcyr, node.yvbpsm. Each is a user that cannot connect until one is issued
merge gate: PASS — every machine composes with the change as it did without (4 of 4 compose)
judged by controller development build against the facts of 2026-10-07T22:47:27Z

machines:
  - a machine (f35): composes
  - holds mesh-dns-resolver (idt): composes
  - holds git, holds mesh-artifact-store, holds mesh-broker, holds mesh-catalog, holds mesh-delivery, holds mesh-dns-resolver, holds mesh-store, holds mesh-vault, holds npm-package-registry, the control node, the hub (ygcyr): composes
  - a machine (yvbpsm): composes

a merge would rebuild 3 module(s) in 3 tier(s): build-agent, mesh-controller, route-proxy
--- its merge-check.sh (go toolchain)
ok  	github.com/novox/mesh-controller/cmd/mesh-builder	1.034s
ok  	github.com/novox/mesh-controller/cmd/mesh-controller	476.873s
ok  	github.com/novox/mesh-controller/examples/objectstore-provisioner	1.034s
ok  	github.com/novox/mesh-controller/examples/postgres-provisioner	1.042s
ok  	github.com/novox/mesh-controller/examples/redis-provisioner	1.035s
ok  	github.com/novox/mesh-controller/examples/route-proxy	1.238s
ok  	github.com/novox/mesh-controller/internal/artifacts	1.067s
ok  	github.com/novox/mesh-controller/internal/broker	2.538s
ok  	github.com/novox/mesh-controller/internal/builder	1.357s
ok  	github.com/novox/mesh-controller/internal/catalogue	4.502s
ok  	github.com/novox/mesh-controller/internal/conditions	2.021s
ok  	github.com/novox/mesh-controller/internal/envfile	1.041s
ok  	github.com/novox/mesh-controller/internal/facts	1.059s
ok  	github.com/novox/mesh-controller/internal/identity	44.337s
ok  	github.com/novox/mesh-controller/internal/inventory	286.604s
ok  	github.com/novox/mesh-controller/internal/lease	17.701s
ok  	github.com/novox/mesh-controller/internal/licences	41.015s
ok  	github.com/novox/mesh-controller/internal/licences/adapters	1.051s
ok  	github.com/novox/mesh-controller/internal/link	84.392s
ok  	github.com/novox/mesh-controller/internal/lint	1.955s
ok  	github.com/novox/mesh-controller/internal/outward	1.069s
ok  	github.com/novox/mesh-controller/internal/overlay	1.068s
ok  	github.com/novox/mesh-controller/internal/secrets	1.511s
ok  	github.com/novox/mesh-controller/internal/store	9.773s
ok  	github.com/novox/mesh-controller/internal/testbus	1.217s
ok  	github.com/novox/mesh-controller/internal/token	1.013s
**Merge check** at `80f9d26e` - `mesh/merge-gate`: **PASS** — every machine composes with the change as it did without (4 of 4 compose) (modules: build-agent, mesh-controller, route-proxy) - `mesh/repo-check`: **PASS** — its merge-check.sh passed **Delivery plan** — builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step - tier 0: mesh-controller - tier 1: build-agent - tier 2: route-proxy - ace: receives build-agent, route-proxy - g14: receives build-agent - novox: receives mesh-controller, build-agent, route-proxy - shanks: receives build-agent - build-agent keeps data (ADR 0233): what it holds is backed up before it moves - route-proxy provides route: its consumers are sent again after it - route-proxy keeps data (ADR 0233): what it holds is backed up before it moves Run by the build seat on shanks as `build-1791415682759737809` (`builds --log build-1791415682759737809`). ``` --- the gate: build-agent, mesh-controller, route-proxy mesh-controller: ok, 46 tool(s); WARNING: controller stay(s) up and say(s) not how it is ready — judged by liveness alone, refused from 2026-11-18 (ADR 0240 rule 8) long-running resources without health: 1 1 manifest(s) checked. Judged against the seats this binary carries; a claim on one of the mesh's own seats is judged fully at registration, and a seat declared by a module not given here reads as unknown. Identities judged on a 6-character machine name, against the bounds of the providers given here judging 0 module(s) changed against 4 machine(s), as the snapshot of 2026-10-07T22:47:27Z says they run composing every machine as the mesh is the bus's user list leaves out 5 user(s) the mesh has minted no credential for: controller, node.f35, node.idt, node.ygcyr, node.yvbpsm. Each is a user that cannot connect until one is issued the bus's user list leaves out 5 user(s) the mesh has minted no credential for: controller, node.f35, node.idt, node.ygcyr, node.yvbpsm. Each is a user that cannot connect until one is issued composing every machine with the change the bus's user list leaves out 5 user(s) the mesh has minted no credential for: controller, node.f35, node.idt, node.ygcyr, node.yvbpsm. Each is a user that cannot connect until one is issued the bus's user list leaves out 5 user(s) the mesh has minted no credential for: controller, node.f35, node.idt, node.ygcyr, node.yvbpsm. Each is a user that cannot connect until one is issued merge gate: PASS — every machine composes with the change as it did without (4 of 4 compose) judged by controller development build against the facts of 2026-10-07T22:47:27Z machines: - a machine (f35): composes - holds mesh-dns-resolver (idt): composes - holds git, holds mesh-artifact-store, holds mesh-broker, holds mesh-catalog, holds mesh-delivery, holds mesh-dns-resolver, holds mesh-store, holds mesh-vault, holds npm-package-registry, the control node, the hub (ygcyr): composes - a machine (yvbpsm): composes a merge would rebuild 3 module(s) in 3 tier(s): build-agent, mesh-controller, route-proxy --- its merge-check.sh (go toolchain) ok github.com/novox/mesh-controller/cmd/mesh-builder 1.034s ok github.com/novox/mesh-controller/cmd/mesh-controller 476.873s ok github.com/novox/mesh-controller/examples/objectstore-provisioner 1.034s ok github.com/novox/mesh-controller/examples/postgres-provisioner 1.042s ok github.com/novox/mesh-controller/examples/redis-provisioner 1.035s ok github.com/novox/mesh-controller/examples/route-proxy 1.238s ok github.com/novox/mesh-controller/internal/artifacts 1.067s ok github.com/novox/mesh-controller/internal/broker 2.538s ok github.com/novox/mesh-controller/internal/builder 1.357s ok github.com/novox/mesh-controller/internal/catalogue 4.502s ok github.com/novox/mesh-controller/internal/conditions 2.021s ok github.com/novox/mesh-controller/internal/envfile 1.041s ok github.com/novox/mesh-controller/internal/facts 1.059s ok github.com/novox/mesh-controller/internal/identity 44.337s ok github.com/novox/mesh-controller/internal/inventory 286.604s ok github.com/novox/mesh-controller/internal/lease 17.701s ok github.com/novox/mesh-controller/internal/licences 41.015s ok github.com/novox/mesh-controller/internal/licences/adapters 1.051s ok github.com/novox/mesh-controller/internal/link 84.392s ok github.com/novox/mesh-controller/internal/lint 1.955s ok github.com/novox/mesh-controller/internal/outward 1.069s ok github.com/novox/mesh-controller/internal/overlay 1.068s ok github.com/novox/mesh-controller/internal/secrets 1.511s ok github.com/novox/mesh-controller/internal/store 9.773s ok github.com/novox/mesh-controller/internal/testbus 1.217s ok github.com/novox/mesh-controller/internal/token 1.013s ```
mesh-admin merged commit 6ea457df74 into main 2026-10-07 23:41:44 +00:00
mesh-admin deleted branch replays/292-298 2026-10-07 23:41:44 +00:00
This repo is archived. You cannot comment on pull requests.
No Reviewers
1 Participants
Due Date
No due date set.
Dependencies

No dependencies set.

Reference: novox/mesh-controller#129