Pin mesh-sdk main, whose seats promise own and settle, so the catalogue passes the module check again (issue 1126) #476

Merged
mesh-tools merged 1 commits from fix/1126-controller-pins-sdk-main into main 2026-10-26 22:08:19 +00:00
Member

Issue 1126 (note 16), blocking: mesh-controller main 2c638234 pins mesh-sdk e78e881 (#103's head), which lacks the delivery seat's settle (mesh-sdk #102). mesh-catalog main claims settle for mesh-delivery-gate since the delivery-records merge, so main's TestModuleCheckPassesTheCatalogue fails: "mesh-delivery-gate claims mesh-delivery and says it serves settle, which that seat's protocol does not promise". #475 merged after its check had failed on exactly this.

Pin-only: go.mod, go.sum (regenerated), testdata/beside/CAPTURED now name mesh-sdk main f178323 (both own and settle); conformance/ is unchanged between the two.

Piece of the research "The controller, NATS-native" it moves: none; it repairs the catalogue check.

The kind, met twice tonight (issue 1126 note 16): the controller judges claims against its own pinned sdk's seats, so a merge adding a seat verb breaks this main until a repin. The thorough fix is queued there for the operator's word.

Tests: the failing test passes against mesh-catalog main f0f7b673 beside it; full unit suite, go vet -tags integration, go mod verify pass.

Reviewed-by: review-vaultseat@shanks at 253bbcea2d

Issue 1126 (note 16), blocking: mesh-controller main 2c638234 pins mesh-sdk e78e881 (#103's head), which lacks the delivery seat's `settle` (mesh-sdk #102). mesh-catalog main claims settle for mesh-delivery-gate since the delivery-records merge, so main's TestModuleCheckPassesTheCatalogue fails: "mesh-delivery-gate claims mesh-delivery and says it serves settle, which that seat's protocol does not promise". #475 merged after its check had failed on exactly this. Pin-only: go.mod, go.sum (regenerated), testdata/beside/CAPTURED now name mesh-sdk main f178323 (both own and settle); conformance/ is unchanged between the two. Piece of the research "The controller, NATS-native" it moves: none; it repairs the catalogue check. The kind, met twice tonight (issue 1126 note 16): the controller judges claims against its own pinned sdk's seats, so a merge adding a seat verb breaks this main until a repin. The thorough fix is queued there for the operator's word. Tests: the failing test passes against mesh-catalog main f0f7b673 beside it; full unit suite, `go vet -tags integration`, `go mod verify` pass. Reviewed-by: review-vaultseat@shanks at 253bbcea2da8d500a1484a32d72f2b5ad8a31f2e
mesh-tools added 1 commit 2026-10-26 22:05:21 +00:00
Pin mesh-sdk main f178323, whose delivery seat promises settle beside the vault's own, so the catalogue check passes against mesh-catalog main f0f7b673 (issue 1126)
mesh/delivery merged: source.main moved to novox/mesh-controller@b611f7375a47
mesh/check checking 253bbcea2da8 on b611f7375a47
253bbcea2d
Moves no piece of research 'The controller, NATS-native': a repin of the seat catalogue, no controller code changed.
Author
Member

Delivery novox/mesh-controller@253bbcea2da8 — merged since 2026-10-26T22:08:20Z

Source — source.main moved to novox/mesh-controller@b611f7375a. Whether it reached the machines is mesh-delivery-view's, derived from source.main, the wants and the haves.

Transitions

  • 2026-10-26 22:05 (new) → proposed (announced): novox/mesh-controller#476's head announced
  • 2026-10-26 22:05 proposed → ready (accepted): a verdict names this commit and the trunk's head as its trunk commit, the gate passed or warned, and the repository's own check did not fail; or the check gates no merge (check-gates-merge false)
  • 2026-10-26 22:08 ready → merged (merged): on the trunk its modules follow: merged there

The commit's note under refs/notes/mesh-plan keeps every transition of this change up to its merge: git log --notes=mesh-plan.

<!-- mesh-delivery:view --> **Delivery** `novox/mesh-controller@253bbcea2da8` — **merged** since 2026-10-26T22:08:20Z **Source** — source.main moved to novox/mesh-controller@b611f7375a47. Whether it reached the machines is `mesh-delivery-view`'s, derived from `source.main`, the wants and the haves. **Transitions** - 2026-10-26 22:05 (new) → proposed (announced): novox/mesh-controller#476's head announced - 2026-10-26 22:05 proposed → ready (accepted): a verdict names this commit and the trunk's head as its trunk commit, the gate passed or warned, and the repository's own check did not fail; or the check gates no merge (check-gates-merge false) - 2026-10-26 22:08 ready → merged (merged): on the trunk its modules follow: merged there The commit's note under `refs/notes/mesh-plan` keeps every transition of this change up to its merge: `git log --notes=mesh-plan`.
mesh-tools merged commit b611f7375a into main 2026-10-26 22:08:19 +00:00
mesh-tools deleted branch fix/1126-controller-pins-sdk-main 2026-10-26 22:08:20 +00:00
Sign in to join this conversation.
No Reviewers
1 Participants
Notifications
Due Date
No due date set.
Dependencies

No dependencies set.

Reference: novox/mesh-controller#476