Release sdk1 of issue 1126 (the controller's removal), delivery group feat/sdk1: mesh-sdk, mesh-catalog, mesh-delivery, mesh-host (the node-engine), mesh-tools, mesh-networking and the controller's repository. Decision: ADR 0593 (mesh-sdk keeps only what every module shares; the node-engine alone composes; the indexer alone computes a fingerprint, over the content of the mesh packages a module imports), with ADR 0591 (a failed check names every failure) and the mesh-sdk part of ADR 0592 (object buckets, history streams). Every member pins mesh-sdk 1c7356c. This repository is archived after the delivery.
Tests: gofmt, go vet with and without the integration tag, and the unit and integration suites of every Go module in every member pass locally with GOWORK=off against the pins (mesh-catalog 4051 unit / 91 integration; mesh-delivery 805 / 71; mesh-host 1765 / 6). Delivered ahead of it: mesh-catalog #597 (a relative replace resolves in the build module's temporary modfile).
Bent rules, said (rules-are-weighed): the node-engine's unit tests rise from 1232 to 1765 because about 530 moved in with the composition rules from mesh-sdk, whose count falls from 1425 to 607, so the mesh-wide count falls. Modules that import a sibling package of their own repository rebuild once more after the release, at their repository's first merge, when the version line first takes the sibling's content (a one-time breach of ADR 0593 §4). The TypeScript package's move (subtask SDK9) stays out on purpose: the running indexer would lose fingerprints.
Release sdk1 of issue 1126 (the controller's removal), delivery group feat/sdk1: mesh-sdk, mesh-catalog, mesh-delivery, mesh-host (the node-engine), mesh-tools, mesh-networking and the controller's repository. Decision: ADR 0593 (mesh-sdk keeps only what every module shares; the node-engine alone composes; the indexer alone computes a fingerprint, over the content of the mesh packages a module imports), with ADR 0591 (a failed check names every failure) and the mesh-sdk part of ADR 0592 (object buckets, history streams). Every member pins mesh-sdk 1c7356c. This repository is archived after the delivery.
Tests: gofmt, go vet with and without the integration tag, and the unit and integration suites of every Go module in every member pass locally with GOWORK=off against the pins (mesh-catalog 4051 unit / 91 integration; mesh-delivery 805 / 71; mesh-host 1765 / 6). Delivered ahead of it: mesh-catalog #597 (a relative replace resolves in the build module's temporary modfile).
Bent rules, said (rules-are-weighed): the node-engine's unit tests rise from 1232 to 1765 because about 530 moved in with the composition rules from mesh-sdk, whose count falls from 1425 to 607, so the mesh-wide count falls. Modules that import a sibling package of their own repository rebuild once more after the release, at their repository's first merge, when the version line first takes the sibling's content (a one-time breach of ADR 0593 §4). The TypeScript package's move (subtask SDK9) stays out on purpose: the running indexer would lose fingerprints.
Reviewed-by: review-1126@shanks at 5970367173948a4de9893854200f107ff06f9dba
https://claude.ai/code/session_01NcbgfJ9Gum47zkFKWRaovL
The group's check composed route-proxy twice, here and in mesh-networking; the move is one delivery group
(issue 1126), so it leaves here in the same group. The tests that read its directory go with it.
Claude-Session: https://claude.ai/code/session_01NcbgfJ9Gum47zkFKWRaovL
Nothing runs the controller (unassigned, out of the catalog) and the group's check builds every member; the repository is archived after the delivery. Issue 1126.
Claude-Session: https://claude.ai/code/session_01NcbgfJ9Gum47zkFKWRaovL
Deliverynovox/mesh-controller@597036717394 — merged since 2026-11-02T20:42:13Z
Source — source.main moved to novox/mesh-controller@56e89d62f1. Whether it reached the machines is mesh-delivery-view's, derived from source.main, the wants and the haves.
composed together: fail — the checker's verdict at the members' heads (10899da235da): the composition
Transitions
2026-11-02 18:58 (new) → proposed (announced): novox/mesh-controller#491's head announced
2026-11-02 18:58 proposed → ready (accepted): a verdict names this commit and the trunk's head as its trunk commit, the gate passed or warned, and the repository's own check did not fail; or the check gates no merge (check-gates-merge false)
2026-11-02 20:42 ready → merged (merged): on the trunk its modules follow: merged there
The commit's note under refs/notes/mesh-plan keeps every transition of this change up to its merge: git log --notes=mesh-plan.
<!-- mesh-delivery:view -->
**Delivery** `novox/mesh-controller@597036717394` — **merged** since 2026-11-02T20:42:13Z
**Source** — source.main moved to novox/mesh-controller@56e89d62f1cb. Whether it reached the machines is `mesh-delivery-view`'s, derived from `source.main`, the wants and the haves.
**Group** `feat/sdk1`: novox/mesh-catalog@d221c633799a, novox/mesh-controller@597036717394, novox/mesh-delivery@2b5a7fe831c1, novox/mesh-host@ae4b86e33300, novox/mesh-networking@f18ec031c463, novox/mesh-sdk@f02f142af128, novox/mesh-tools@24c0ec0d324a
- composed together: fail — the checker's verdict at the members' heads (10899da235da): the composition
**Transitions**
- 2026-11-02 18:58 (new) → proposed (announced): novox/mesh-controller#491's head announced
- 2026-11-02 18:58 proposed → ready (accepted): a verdict names this commit and the trunk's head as its trunk commit, the gate passed or warned, and the repository's own check did not fail; or the check gates no merge (check-gates-merge false)
- 2026-11-02 20:42 ready → merged (merged): on the trunk its modules follow: merged there
The commit's note under `refs/notes/mesh-plan` keeps every transition of this change up to its merge: `git log --notes=mesh-plan`.
mesh-delivery: the operator's Approve of this pull request's merge into main is ended: a head it covers moved on: the heads it covers are no longer the group's heads. Nothing is merged on it. The operator is asked again once the checks pass at the new head.
mesh-delivery: the operator's Approve of this pull request's merge into main is ended: a head it covers moved on: the heads it covers are no longer the group's heads. Nothing is merged on it. The operator is asked again once the checks pass at the new head.
mesh-delivery: the operator's Approve of this pull request's merge into main is ended: a head it covers moved on: the heads it covers are no longer the group's heads. Nothing is merged on it. The operator is asked again once the checks pass at the new head.
mesh-delivery: the operator's Approve of this pull request's merge into main is ended: a head it covers moved on: the heads it covers are no longer the group's heads. Nothing is merged on it. The operator is asked again once the checks pass at the new head.
mesh-delivery: the operator's Approve of this pull request's merge into main is ended: its head 3b3b096be8cd is no longer the pull request's head, or the pull request closed. Nothing is merged on it. The operator is asked again once the checks pass at the new head.
mesh-delivery: the operator's Approve of this pull request's merge into main is ended: its head 3b3b096be8cd is no longer the pull request's head, or the pull request closed. Nothing is merged on it. The operator is asked again once the checks pass at the new head.
Blocking a user prevents them from interacting with repositories, such as opening or commenting on pull requests or issues. Learn more about blocking a user.
Release sdk1 of issue 1126 (the controller's removal), delivery group feat/sdk1: mesh-sdk, mesh-catalog, mesh-delivery, mesh-host (the node-engine), mesh-tools, mesh-networking and the controller's repository. Decision: ADR 0593 (mesh-sdk keeps only what every module shares; the node-engine alone composes; the indexer alone computes a fingerprint, over the content of the mesh packages a module imports), with ADR 0591 (a failed check names every failure) and the mesh-sdk part of ADR 0592 (object buckets, history streams). Every member pins mesh-sdk 1c7356c. This repository is archived after the delivery.
Tests: gofmt, go vet with and without the integration tag, and the unit and integration suites of every Go module in every member pass locally with GOWORK=off against the pins (mesh-catalog 4051 unit / 91 integration; mesh-delivery 805 / 71; mesh-host 1765 / 6). Delivered ahead of it: mesh-catalog #597 (a relative replace resolves in the build module's temporary modfile).
Bent rules, said (rules-are-weighed): the node-engine's unit tests rise from 1232 to 1765 because about 530 moved in with the composition rules from mesh-sdk, whose count falls from 1425 to 607, so the mesh-wide count falls. Modules that import a sibling package of their own repository rebuild once more after the release, at their repository's first merge, when the version line first takes the sibling's content (a one-time breach of ADR 0593 §4). The TypeScript package's move (subtask SDK9) stays out on purpose: the running indexer would lose fingerprints.
Reviewed-by: review-1126@shanks at
5970367173https://claude.ai/code/session_01NcbgfJ9Gum47zkFKWRaovL
Delivery
novox/mesh-controller@597036717394— merged since 2026-11-02T20:42:13ZSource — source.main moved to novox/mesh-controller@56e89d62f1. Whether it reached the machines is
mesh-delivery-view's, derived fromsource.main, the wants and the haves.Group
feat/sdk1: novox/mesh-catalog@d221c63379, novox/mesh-controller@5970367173, novox/mesh-delivery@2b5a7fe831, novox/mesh-host@ae4b86e333, novox/mesh-networking@f18ec031c4, novox/mesh-sdk@f02f142af1, novox/mesh-tools@24c0ec0d32Transitions
The commit's note under
refs/notes/mesh-plankeeps every transition of this change up to its merge:git log --notes=mesh-plan.mesh-delivery: the operator's Approve of this pull request's merge into main is ended: a head it covers moved on: the heads it covers are no longer the group's heads. Nothing is merged on it. The operator is asked again once the checks pass at the new head.
mesh-delivery: the operator's Approve of this pull request's merge into main is ended: a head it covers moved on: the heads it covers are no longer the group's heads. Nothing is merged on it. The operator is asked again once the checks pass at the new head.
mesh-delivery: the operator's Approve of this pull request's merge into main is ended: its head 3b3b096be8cd is no longer the pull request's head, or the pull request closed. Nothing is merged on it. The operator is asked again once the checks pass at the new head.