Files
mesh-controller/cmd
jochen 05fa3705b6
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
mesh/repo-check pass: its merge-check.sh passed
mesh/delivery superseded: a newer head of the same pull request
Read a module whole while a plan has overtaken its build source, and plan every view alike (hq ADR 0267, review)
A failed build, or a plan closed before reaching a module, left the
closure its last good build said, and a fix-forward to a newly imported
package would have moved nothing. A missed merge moving only a module
that packages the repository was never caught up, and an older merge
read as history for it through a look that was not its own. The gate,
a pull request's check, the what-if and a delivery's order now read the
same view the merge handler does.
2026-10-10 03:16:37 +02:00
..