mesh/delivery superseded: a newer head of the same pull request
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
mesh/repo-check fail: its merge-check.sh failed: --- FAIL: TestAnUnreadableStoreClearsNothing (0.01s)
The review of hq issue 339 found the PEM exception too wide (any module, any key, any label, anything base64), \v, \f, NEL and the Unicode separators still let a value end a line in some readers, and the spool, /opt, the container runtimes' data and an account's .ssh still placeable. Lines are now taken only in step-ca's root setting, as certificates encoding/pem decodes and x509 parses; every line end is refused; and those paths are the machine's own. The test certificate is a real one, made for the tests with its key thrown away.