Files
mesh-controller/cmd/mesh-controller
jochen 4354d9d7c7
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
mesh/repo-check fail: its merge-check.sh failed: --- FAIL: TestReplay336 (1.12s)
mesh/delivery superseded: a newer head of the same pull request
Name the bus upgrade as the mesh call a person makes, and say a same-source rebuild needs no step (review of #173)
The condition and the plan named the verb in command-line form; the operator reaches it through the mesh
MCP server, so it is written as that call. A rebuild of the same source moves nothing (issue 280), which
the plan cannot know before the build, so its line says so.
2026-10-09 02:54:23 +02:00
..