mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
mesh/repo-check fail: its merge-check.sh failed: FAIL github.com/novox/mesh-controller/cmd/mesh-controller 1800.059s
mesh/delivery-group group feat/health-the-field rejected: its order contradicts itself: novox/mesh-controller@468d509462fe, novox/mesh-host@96bf9415aae4
mesh/delivery superseded: a newer head of the same pull request
A module could say nothing about what ready means for what it runs, so a web application with its port open and its requests hanging passed everything for eleven hours (issue 145). A long-running resource now carries `health` — the image's own check adopted by name, http, tcp, exec, unit or a module's own tool, with its timing — refused near its author when it names a port or an address, an endpoint the module does not declare, a tool it does not serve, a tool check alone, or a timing outside the record's bounds. It is composed with the endpoint as the port this machine published it on, and sent only to a node-engine whose statement says it reads it: an older one would refuse the whole declaration. The engine is granted its own machine's instance of each health tool. `module check` warns of every long-running resource without `health`, counts them for the catalogue, and refuses them from 2026-11-18. A check's findings stay out of a condition's summary. The node-engine's validator is vendored at its Phase B commit, so what is composed is judged by the words the engine takes.