mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
mesh/repo-check pass: its merge-check.sh passed
mesh/delivery-group group fix/327-a-verb-reads-on-the-serving-connection delivering: 1 of 4 delivered
mesh/delivery superseded: a newer head of the same pull request
Read verbs now run in the serving process, where a panic would end every call; refused logins are nobody's reconnect loop (review of hq issue 327).