F1: an owed act failing on a part away stays owed, and a record's acts are performed again

An owed act met by the forge away (401 while the store was replaced) ended
could not be performed and nothing performed it again. Each act is now a kept
call at the module's pace (kept-call-pace-first, kept-call-pace-max) until
owed-away-bound (60 minutes), then ends could not be performed naming every
try. Before each try the bridge reads the pull request through the seat git's
pull: one closed unmerged ends owed.ended not-needed, never performed. The
gate's owed event gains record (the delivery record's source revision), kept
with the act in performed, and bridge_owed_again by record and why performs
again every act of that record that ended could not be performed, written in
the hand-act log first.

Builds: design 47 H2 §807, §775, §819, H-A-432
This commit is contained in:
2026-11-22 01:46:49 +01:00
parent b76b9c58f4
commit 13d960a120
20 changed files with 463 additions and 64 deletions
@@ -30,6 +30,7 @@
"seat:git.status",
"seat:git.comment",
"seat:git.view",
"seat:git.pull",
"seat:git.note",
"seat:mesh-hand-acts.hand-act",
"seat:git.tags",
@@ -47,6 +48,27 @@
}
],
"config": {
"owed-away-bound": {
"type": "string",
"description": "How long the bridge calls an owed act again through transport faults and the seat git's away before it says owed.ended could not be performed, naming its tries, a Go duration (design 47 H2 §807).",
"trusted": false,
"runtime": true,
"default": "60m"
},
"kept-call-pace-first": {
"type": "string",
"description": "the first wait before a kept call met by a transport fault is made again, doubled per call up to kept-call-pace-max, a Go duration (design 47 H2 §775).",
"trusted": false,
"runtime": true,
"default": "1s"
},
"kept-call-pace-max": {
"type": "string",
"description": "the most a kept call's wait between calls grows to, a Go duration (design 47 H2 §775).",
"trusted": false,
"runtime": true,
"default": "30s"
},
"prune-mark": {
"type": "number",
"description": "The fill of the bridge's state performed, in percent of its cap, past which the bridge prunes it at its own write, oldest acts first (design 47 H2 §812): below the bus module's raise mark of 75 %.",