D13b: the composition's warnings, and so the check's line, name the changed modules built with the Go build module the change alters and those standing on a changed base. D9: builder and verdict rows. D15: the assigner's integration test gets a source revision changing a provider, its new consumer and a build module.
Claude-Session: https://claude.ai/code/session_01JG73KG7AfSdh6FP8VrBqCn
The indexer's recompute and merge failed on listing a graph bucket not yet on the bus, and a package published from inside a module's directory had no publisher, so the dependents of a build module missed what imports its packages (review findings 3 and 4 of L3).
Claude-Session: https://claude.ai/code/session_01JG73KG7AfSdh6FP8VrBqCn
dropRemoved hands the module over from the other trunk, read from the forge at the head the source names, so no wait in memory is needed. indexer_take_in with a repository takes in a head with no module.json as a merge that leaves none, and answers by name for a head with modules.
The forge bridge wrote no merged message for such a merge, so taken.<repo> never moved
and the view held 'the indexer has not yet taken in <head>' (hq #490-#492). The bridge
now writes it with no trees; the indexer drops every module of the repository on it,
after the same order check as any merged message. The view needed no change: with the
taken key moving it reaches the merge, which its new row proves.
Needs mesh-sdk fix/1126-no-module-reach (a merged message may carry no trees).
The invoke was left out (mesh-delivery #142) only while the indexer built before the verb ran; the new indexer and the
node-engine's compose-candidate run on every machine since 22:57, so a check composes on the machines again instead of
passing with a warning (ADR 0593 §7, §9).
Claude-Session: https://claude.ai/code/session_01NcbgfJ9Gum47zkFKWRaovL
The check of 2026-11-02 22:35 on a loaded shanks failed two buildrun tests on wall-clock bounds of 60 ms, the
second failure of this kind tonight (the first: mesh-sdk's busretry tests, f02f142).
Quick fix: give the two buildrun asker tests bounds of seconds.
Thorough fix (chosen, because the kind recurs across every module of the repository): every test that raced a
wall clock now waits on an event, steps a clock it is given, or has a bound only a failing test reaches.
- buildrun asker tests: the steps' own times stand for the clock (bound an hour, starts and phases written in the
past), no goroutine paces phases with sleeps.
- builder: the decline bound reads Builder.Now; the decline test steps it; the stream-wait test waits for five
check reads instead of 100 ms.
- checker: the lost-ask try bounds an untaken ask at 200 ms only where that is what ends it; the program says when a
merge turn changes, and the integration test waits on that line instead of 300 ms.
- teller: the bed makes the teller's own ends bucket (a 10 s stall at start the tests raced by 0.5 s), waits for its
warrant subscription instead of 500 ms pauses, and the package-level now is restored with t.Cleanup.
- watchman: the recount, run in its own goroutine, is waited for instead of 10 ms.
- polls of 2-5 s become 10 s (unit) and 20 s (integration).
Under a throttled cgroup (half a core shared with two busy loops) beside the node-engine's suite, the buildrun
tests failed 5 of 20 runs before and passed 30 of 30 after; no test added.
Claude-Session: https://claude.ai/code/session_01NcbgfJ9Gum47zkFKWRaovL
The running indexer, built before the verb existed, refuses a manifest invoking it, and one refused manifest holds the
grants part's whole list: no new grant is written, so the new indexer never moves (issue 1126, 2026-11-02). Quick fix,
chosen because the thorough one (the grants part keeps only the refused module's grants) cannot be delivered while the
list is held; a follow-up adds the invoke back. Until then a check's compose-candidate call is refused on the bus and the
node is named silent: the check passes with that warning (engines.go, ADR 0593 §9).
Claude-Session: https://claude.ai/code/session_01NcbgfJ9Gum47zkFKWRaovL