Commit Graph
3 Commits
Author SHA1 Message Date
jschoubben d9d1e57e3a Delete the checker's hold, its own capacity and places, its node moves and its read of the controller's plans-building, so a check waits only in the build seats' streams (issue 1887 A5b, closes 1685; ADR 0525 §4, §7) 2026-10-23 16:09:34 +02:00
jschoubben 2bdb8d0e00 Ask the Go build module to run the candidate when a merge changes it, and say in the line which program judged (issue 1898 K3)
A change to mesh-build-go was judged by the installed module it replaces, so such pull
requests were merged by hand. ADR 0535 §1, §2, §4, §5.
2026-10-23 14:06:57 +02:00
jschoubben 7abe230701 Judge a pushed head as a try on the checker, through checker_try and checker_try_read (ADR 0501 §5)
mesh-controller's try asked build-agent, which leaves the checking at R4e. A try is now a key in the checker's state
tries: the checker judges the head merged onto its trunk as it judges a pull request's head, through the same
judge, places and holds, writes its end in the key and owes the forge nothing (no status, no preview, no verdict).
One try per head, at most four at once; hq and a repository whose trunk the gate does not name are refused with
"no level of <repo> is checked by the checker".
2026-10-22 18:03:28 +02:00