The runner seat's Mover gains unplaced (kept-revision-unread) and revision, the seat's form 3.
Builds: design 47 H2 §787, §780 (fate: the drop of kept-revisions before the decode goes)
A pipeline ending failed or cancelled keeps each mover whose own required
steps passed or never ran in the runner's state unfinished and names it in
pipeline-ended's unfinished; the branch's next kept catalog revision carries
it, or starts a pipeline for it alone. runner_unfinished reads the state,
runner_unfinished_drop drops one key, runner_unfinished_place asks the new
seat verb place-unfinished (contracts regenerated), both hand acts.
Builds: design 47 H2 §786, §820 (unfinished), H-A-398
Every step-ended goes through sayStepEnded, which writes "step ended <pipeline>
<mover> <step> <outcome> in <duration>"; the cancel verb now says each step it
ends. Resume at a start puts again only an open step's ask no holder took.
Builds: design 47 H2 §784, §777 (H-A-397)
The bound key ask.<seat>.<ask> is armed at the put, again at the holder's
ask-taken (heard now for mesh-builds and mesh-wants too) with what is left
since taken-at, again from now at each step-progress, and at a start for every
open ask whose key is gone; it is deleted at the step's end. Past it the step
ends could-not-run, naming an untaken ask's seat holder as taking none, and its
ask is dropped through the seat's drop. The silent seats' bound, the second put
under AgainID, the ask2. keys and the put again at a holder's running go; a put
refused by a full work queue is said and put again at the kept-call pace.
Builds: design 47 H2 §777, §778 (H-A-349 DQ-4, H-A-395)
taken (the record's start at its take-in), placed (the earliest step start),
ended, and per step kind the earliest start and latest end across movers, so
the gate reads where a pipeline's time went.
Builds: design 47 H2 §785
A put that met a transport fault is put again under the ask's own id at the
kept-call pace instead of failing the step at the first fault.
Builds: design 47 H2 §775
On 21 Nov the order was the reverse of the first commit's: mesh-contracts'
old build was withdrawn first (21:50:16), so the stayers that awaited it
were placed not asked, and only then did the hand-offs take it away. A
mover that left is still a dependency of those stayers: their not-asked
steps held the pipeline's end as failures. At the hand-off the steps of
each stayer that ended not asked on a dependency that left, directly or
through a mover itself taken out, are taken out, so the placing that
follows places them again against the newest published package; a
dependency that truly did not build is named again at that placing. The
journal says which movers are placed again.
Builds: design 47 H H-A-361, H-A-53, H-A-223
main.158 and main.163 ended failed seconds after newer pipelines took
movers away: the movers that stay still awaited the movers that left,
whose builds had ended superseded, so the next placing ended them "not
asked: its dependency did not build" and the end judgement counted
them as failures. A mover that left is no longer awaited (the stayer
builds against the newest published package, H-A-53), is never placed
in the older pipeline, and the hand-off places what stays at once and
says in the journal which movers stay.
Builds: design 47 H H-A-361, H-A-53, H-A-223
The seat generator gives every value, event and answer the wire field form
(left out while 1) and a tolerant decoder answering the form it read; each
contract carries its forms and a digest of its fields, and the compare fails
a definition whose fields changed while its form did not. Every delivery seat
is regenerated, and the readers take the form.
Builds: design 47 H2 §780; H-A-352
The runner's ended line was written only for a heard step-ended and its run's
readers; the unanswered-bound end, the end at placing, a supersede, a re-pin,
the approval's end, the start pass and the verbs said their ends silently. It
is now written in Hearer.say, the one place that says step-ended, and at the
starter's two sayers that call stepEvent directly (repin, sayNotAsked). The
builder's answered line sat on four of buildEntry's returns; the ask's answer
is now one line in BuildStep's finish, naming the pipeline, the movers, the
step and the outcome, the per-entry existing/built-now line kept beside it.
Builds: design 47 H H-A-320 (1), H-A-333
A working 36-mover pipeline was read as stalled twice: the runner wrote no
line when a step ended or was asked, and the builder none when it answered a
step ask. The runner now writes "<pipeline> <mover> <step> ended <outcome>
(<node>, <duration>)" at each step end it writes (the asking step, every
reader of its test run, and each reader EndRun ends), and "<pipeline> <mover>
<step> asked on <seat>" for each ask put (the re-ask paths keep their own
line). The builder writes "<module>@<fingerprint> build step answered
<outcome> for <pipeline> (existing build / built now)".
Builds: design 47 H H-A-320 (1)
The verb published answered no time, and after a release no digest,
while the seat form says both come when published. The builder now
keeps when it heard or confirmed each publish on the mark, and each
published digest on a kept release; marks and releases written before
answer without them. A number a take-over withdrew is not published.
The runner drops a pipeline's kept answers at its end.
Builds: design 47 H H-A-331, H-A-328
main.137 stood twenty minutes with nats and mesh-vault waiting on
mesh-grants packages published at 20:00, before the wait was written,
so no publish event came. The runner now asks the build seat's
published when it writes the wait and places the mover when the
package is published, saying so in the journal apart from an event.
Builds: design 47 H H-A-326 (1), H-A-326 (3), H-A-328
A step held on a package's publish counted as open, so a pipeline whose
only movers waited on publishes that had come before their wait was
never named by runner_health (main.137, twenty minutes).
Builds: design 47 H H-A-326 (2), H-A-311 (3)
runner_health, show, list and stands refused every pipeline record
carrying the runner's own kept-revisions ("unknown field
kept-revisions" on main.131 and main.137): the field is now dropped
before the seat's strict decode. A required step waiting (an approval,
a pin-held step) now counts as open, as the end's judgement holds it.
Builds: design 47 H H-A-311 (3), H-A-313, H-A-285, H-A-309, H-A-322
main.137 stood seventeen minutes with nothing open while runner_health
said healthy. The tools program says each such pipeline in its journal
once per key (H-A-313).
Builds: design 47 H H-A-311 (3), H-A-313
A late progress or end moved nothing, so movers waiting on what the
step's end gave stayed unplaced: main.137 placed nothing after its
lint's late progress at 20:17:55.
Builds: design 47 H H-A-311 (2), H-A-286, H-A-288
A placing whose compare-and-set was refused because the pipeline was
written meanwhile was dropped and never done again: main.137 stood
seventeen minutes with eleven steps placed until a restart.
Builds: design 47 H H-A-311 (1), H-A-288
main.117 judged its end at 17:45:19 and never wrote it: every mover's widens
was read inside the end's compare-and-set loop, 126 movers each cut on
grants-for, so each try took about eleven minutes and every write was refused
as changed until the restart, whose start pass judged no end.
The reads an end needs are made once, before the compare-and-set, shared by
every mover and every retry; the runner's start pass ends each running
pipeline with nothing open before the queue is placed; every end says its
outcome in the journal.
Builds: design 47 H H-A-288, H-A-289, H-A-223, H-A-243
Review round 1: a kept mover's ask ids still came from the pipeline's start
time, so a pin-held ask or a composition took the id of an ask the runner
had just dropped for the old fingerprint, and a restart never matched the
steps placed again; and a kept mover placed later read the branch's held
view, so a lagging view gave the new fingerprint the old pins. Every ask id
of a kept mover's steps (build, tests, validate, pin-held asks,
composition, rerun, restart) now mixes its kept revision into the id's
sum, and every placing of a kept mover (at once, later, at a restart, a
rerun) reads its entries at its kept revision by number, waiting while
that revision cannot be read. The test's starter gets a clock that moves.
Builds: design 47 H H-A-286 (amending H-A-284; with H-A-283, H-A-285)
A module importing packages its own pipeline releases was re-pinned at
each publish; each re-pin revision of the same source took it out of the
running pipeline, and each newer build withdrew the older reservation, so
nothing ever published. A revision of the same source now moves no mover
out of the open pipeline of that source: the pipeline keeps it at its new
fingerprint, ends every step of it superseded (said at the old
fingerprint, its asks dropped, its runs left) and places them again from
the re-pin revision's entry under new asks, the build first, still naming
the pipeline's revision. The revision the mover is kept at rides in the
record's kept-revisions, beside the movers, where the pin check reads its
entry. A revision whose every mover is kept starts no pipeline; one of a
new source moves movers as before.
Builds: design 47 H H-A-283, H-A-284, H-A-285 (with H-A-223, H-A-244, ADR 0682)
A say that failed after the version was written was lost: the redelivery found
the version held and said nothing. A failed, superseded or cancelled end writes
no want, so it is not said again.
Builds: design 47 H H-A-270 (2), H-A-277 (2), (3)
The seat mesh-wants' holder skips a passed mover with no version yet; the
version-released arrives late, so the end it took named none and no want was
written. Saying the same pipeline-ended again, naming the version, lets the
holder take the mover it skipped.
Builds: design 47 H H-A-270 (2)
Review round 1. A pipeline that ended (failed, cancelled) with a mover
still waiting left the finding for ever. It is now judged at every
pipeline's end and in Waiting: cleared when the registration is held, or
when no running pipeline still has an unplaced mover of the module.
Builds: design 47 H H-A-262, H-A-265
A mover with no registration had its wait said only in the journal. The
runner now raises the finding registration-missing (scope module, id the
module) through its finding writer as it places a pipeline whose mover has
no registration, and clears it when the module's registration arrives or
the registrations held name it.
Builds: design 47 H H-A-262, G A-327, ADR 0666 §2
The start read the second bound with a get, which says not found both
for a key never armed and for one the holder's ask-taken deleted, so
every later start asked an answered step once more. The first read
keeps each key's last entry; a first bound's expiry is taken only when
its second bound left no entry at all, and with both passed only the
second is taken, ending the step without asking it again.
Builds: design 47 H H-A-238 (5)
The bounds were watched for updates only, so an expiry marker written
while the runner was down was never heard and that ask had no bound.
At the start each ask key's last entry is read; an expiry marker is
taken then. A running heard before the seat-holders view is read is
heard again after a delay instead of at once.
Builds: design 47 H H-A-238 (5), H-A-243 (1)
The rerun put only the named mover's validate under the new ask; the
others stayed failed under the old one, so the pipeline failed again
and a second rerun made a second validate ask, breaking the pipeline's
one validate ask. The compositions its failed validate ended not asked
now wait again, asked once validate passes as at the placing.
Builds: design 47 H H-A-51, H-A-236
The pipeline's one validate ask names no mover, but its end names the
mover whose body the holder took; the runner compared that mover with
the first step carrying the ask and dropped a passed validate, so the
pipeline held its slot (main.88).
Builds: design 47 H H-A-236, H-A-252
Only a newer pipeline that waited took movers out of older waiting ones;
one placed at once left them, so main.84 was placed nine hours later
with a mover a newer revision had moved and built a stale fingerprint.
Builds: design 47 H H-A-223, H-A-244 (1)
mesh-builds and mesh-wants say nothing before a step's end, so asking
them again at the short bound would double a running build. Their ask
has one bound, ask-silent-bound, and is put again when the node-engine
says the holder running, since the holder takes asks on a plain
subscription and loses those put while it is down. An ask asked again
on a build seat carries a second id derived in the accepted form.
Builds: design 47 H H-A-235, H-A-238, H-A-241, H-A-243
An ask whose holder lost it (the seat mesh-wants' holder restarted) held
its pipeline's turn for nine hours. Every ask but a test run's now arms
a key of the state bounds before it is put; its expiry asks once more,
said in the journal, and the second ends the step could not run with
the finding call-unanswered, so the pipeline ends and its turn frees.
Builds: design 47 H H-A-235, H-A-238 (1)-(5)
The rerun verb looked a step's ask up by the mover's id, but the validate
ask is one per pipeline and names no mover, so every validate rerun, and
a composition rerun, was refused "placed no ask now".
Builds: design 47 H H-A-236
A moved mover's steps ended superseded, but their asks kept running on the
build nodes. Each such step holding its own ask on a node-build seat, one
reading no shared run, now has the seat's drop asked with the newer
pipeline's why, through the drop the runner already bounds and keeps. The
seat mesh-builds serves no drop, so a build ask there runs to its end,
which the runner ignores: the step is no longer open.
Builds: design 47 H H-A-223
No test failed when Start stopped calling the supersede of running
pipelines, the path the live runner takes. Two rows now start a newer
pipeline through Start, a take-in's and a release revision's, with the
supersede wired to a hearer over the same store, and hold that the older
running pipeline's moved mover left it. The supersede lists only the keys
of the newer pipeline's branch instead of every pipeline's.
Builds: design 47 H H-A-223
A release re-pinned node-tools while main.54 still built it at its old
fingerprint; the build failed and failed the pipeline for its other 119
movers, because supersession took movers out of waiting pipelines only.
Every start of a newer revision's pipeline now also walks the older running
pipelines of its branch: each mover whose fingerprint it moved leaves, its
open steps ending superseded with a why naming the newer pipeline, a step
reading a test run leaving it as a cancel's does, and the mover kept in the
pipeline's superseded. The end judgement counts a left mover's steps as
neither holding nor failed, so the pipeline ends by its other movers alone;
one every mover left ends superseded. A run on request's pipeline is never
touched.
Builds: design 47 H H-A-223, H-A-163, H-A-213
The runner crashed at every start on a live bus with "concurrent map
writes" in MoverStore.Get: the waiting pipelines of each branch are placed
from goroutines of their own, and the store's last reads and inline marks
were written under each pipeline's own lock alone. The store's mutex now
guards the lock table, the last reads and the inline marks; behaviour is
unchanged. The run test starts the runner over six kept pipelines in the
old form, one of 437 steps, so the start path runs under the race detector.
Builds: design 47 H H-A-187, H §774
A pipeline is keyed by its catalog revision's number, so the seat's key form is
<branch>.<revision> (the generated PipelinesByBranchRevisionKey and its siblings; the
fixtures follow), and pipeline-started, pipeline-ended, wait-held and wait-ended are
said on <branch>.<revision>, carrying the same number as the key; every reader takes
the body. The client's SourceSubject is RevisionSubject. The published key form, under
which pipelines were kept before, stays.
Builds: design 47 H H-A-213 (4), H-A-219, H-A-221
One source now has several catalog revisions, so the publishing pipeline is found by
the branch and revision the package-published names. A publish naming no revision,
from a reservation made before the field, goes to its source's lowest-numbered
revision, the take-in's. The seat mesh-builds' package-published gains its optional
revision here too, identical to the builder branch's, so this branch compiles alone.
Builds: design 47 H H-A-218, H-A-220
The queue's and the test runs' integration tests took several sources in at one
catalog revision, which now are one key. Each take-in has its own revision; the
test runs' test also checks that a test ask names revision and source. A replaced
reader of another pipeline's run stays the unit tests' (one revision is one pipeline).
Builds: design 47 H H-A-213 (4), H-A-219
A re-pin on a module's release, a take-in again and a recompute that moves a
fingerprint each keep a catalog revision of their own. The runner hears a trunk
catalog-revision of those kinds, reads that revision by its number through the catalog
seat's revision verb, and starts one pipeline keyed <branch>.<revision> with the
revision's movers. A package-published no longer starts per-artifact pipelines: it
only places the movers waiting for it. A branch's newest pipeline for a mover is the
one of the highest revision number.
Builds: design 47 H H-A-212, H-A-213 (2) and (4), H-A-217
One source now has several catalog revisions, so a pipeline keyed by its source could
not tell them apart. A pipeline is keyed <branch>.<revision>; one of a source (a
publish's, a version-released's) is found by the source it names, never by its key, so
pipelines kept under their source are read as they are. The Go, Node and image step
asks name the catalog revision in revision and the gate's source in a new optional
source (the build-step part of the seats node-build-go, node-build-node and
node-build-image, seatgen regenerated).
Builds: design 47 H H-A-211, H-A-213 (4), H-A-219
The runner built the asks of the steps that waited for their pins from the
branch's newest catalog half, so a newer revision that moved the module
changed what a passed build's tests fetched. The entry is now read at the
pipeline's own revision through the runner's revision reader, which keeps
what it read; a revision that cannot be read, or whose entry is of another
fingerprint than the mover's, ends the held steps could not run, naming
why.
Builds: design 47 H H-A-205, H-A-207, H-A-203