mesh/check checking c47afd8f4b88 on 3dd94f714d6e | novox/mesh-delivery#78 in group fix/capacity-follows-cpu-share
A build module's capacity.<node> now carries its node's build window (the operator, 2026-10-26: g14
builds only from 18:00 to 06:00); the seat shows it, outside it says it takes nothing new, and a
value the module cannot read shows as any hour with the value and why. The checker's and the view's
SDK pin moves to mesh-sdk d00dac1.
The checker wrote a try's asks only at its end, so a 31-minute try could not be told queued from
running (issue 1890). The try's record now names each ask as it is put, then the node that took
it, its state and the phase its step says, written on the step key's own changes. build_usage
names a running try's asks and takes a build module's capacity.<node> (configured bounded by its
node's build CPU, issue 1806's follow-up) when it is current with mesh-config.
mesh/check failed: ace: novox/mesh-catalog#505 does not merge into the trunk: files in conflict: .gitignore | 2493aa65299e on df8b9ac3b1b5 | unit 1245…
One commit for the branch feat/1126-nodes-compose of mesh-delivery: its 16 commits squashed so its history does not carry the 17.8 MB compiled mesh-delivery-assigner a commit added by mistake and a later one removed (issue 1577). The tree equals the former head ff6c038d. The operator allowed this rewrite of the feature branch on 2026-10-26.
A capacity this tool cannot read is unknown to it, not 0: the seat says eligible_known false and the node not known.
A key mesh-config holds without a readable value is what the puller reads as 0, and was dropped silently.
Since mesh-sdk #90 a build module ends a left-running key as failed at the moment it notices; counted as finished,
such a step put hours into the medians and the time at capacity. The view takes mesh-sdk's step bound and restart
reason from the SDK it now pins.
The operator's question (how much are the build nodes used, is ace eligible) took six calls over four tools.
build_usage reads it from the bus's states: seats held (have), capacity (mesh-config resolved), pauses, the
build modules' steps by kind with left-running keys, the last hour and day with total and median time and time
at capacity, the running tries, and the backlog the view program reads from the seats' streams. A try now names
the asks it put, and the checker announces its tries readable, so the view tells a try's asks from a check's.
mesh/check pass 41f25d3129fd on 73be3df28cd4 | unit 21 run, 579 kept | integration 21 run, 655 kept | composition passed on shanks
On 2026-10-25 node_haves and assigner_wants timed out at 30 s four times, even narrowed to one node and one module,
while assigner_want answered at once. Each listed every key of its bucket and then read every value one after the
other, filtering only afterwards; every value is a round trip from the tool through the runtime to the bus, which
opens the bucket and gets the key, so a few hundred keys outlasted the call. Now a node and a module read that one
key directly, a node or a module alone filters the keys before any value is read, and the values are read sixteen
at a time, at most 1000 a call, the answer saying when it was cut. indexer_modules, indexer_candidates and
builder_builds read their values the same parallel way. The kind: a read tool that reads a whole bucket key by key;
every list tool of the view is covered.
mesh/check pass 4628ba26b41a on 73be3df28cd4 | unit 167 run, 443 kept | integration 177 run, 509 kept | composition passed on 3 machines
The open helpers were copied into seven parts; code shared between
modules lives in mesh-sdk, so they are mesh-sdk process's now and the
parts are pinned at fix/1945-optional-buckets (e0d1de04), moved to its
main once it merges, one delivery group with mesh-sdk.
The operator, 2026-10-25: only if a module has a new version in commit x is a new value written naming commit x. A merge
wrote every module of the repository at the new commit, fingerprint unchanged (about 186 keys per mesh-catalog merge), and
the controller's take-in took each in again: twice tonight it flooded. Now a merge that gives a module the value it holds
but for the commit writes nothing, and the value keeps the commit its fingerprint first appeared at. The kind: a write
that differs only in where it was computed. The other instance, a source revision re-stamping Src on every module at its
repository's head after any merge anywhere, now stamps Src once. The trunk head stays the gate's source.main.
A hold answered keep on the phone could not be changed: its ask ended with the
answer, nothing listed it, and a kept hold is never lifted by itself. The view
lists every hold with its node, cause and answer (mesh-delivery-cli holds) and
answers the standing hold ask with hold-release or hold-keep through its one
write; the teller takes a later view answer that changes a hold's option into
the answer of that asking, never an older one.
mesh/delivery-group group fix/r6-node-composition held: a member is held: novox/mesh-sdk@10b6e202320f (merged without a passing check: only a person decides wh…