Pin the parse-only mesh-sdk in the assigner, indexer, checker, builder and grants part, so they read design 47's manifests (issue 774) #112

Merged
mesh-tools merged 3 commits from fix/774-new-words-first into main 2026-10-30 00:10:16 +00:00
Member

Delivery 1 of design 47's release (group fix/774-new-words-first with mesh-sdk, mesh-catalog, mesh-host, mesh-control). Pin-only: the five modules that parse manifests on the check and delivery path pin mesh-sdk 78c9ec8 (main + parse-only commit). No code change. Unit and integration suites green at main's code (assigner 77, indexer 99, checker 157, builder 95, grants 1).

Reviewed-by: rev-47@shanks at a2dd7a5c37

Delivery 1 of design 47's release (group fix/774-new-words-first with mesh-sdk, mesh-catalog, mesh-host, mesh-control). Pin-only: the five modules that parse manifests on the check and delivery path pin mesh-sdk 78c9ec8 (main + parse-only commit). No code change. Unit and integration suites green at main's code (assigner 77, indexer 99, checker 157, builder 95, grants 1). Reviewed-by: rev-47@shanks at a2dd7a5c37ef89b3228be65fa36836c3e4604011
mesh-tools added 3 commits 2026-10-29 23:43:45 +00:00
Author
Member

Delivery novox/mesh-delivery@a2dd7a5c37ef — merged since 2026-10-30T00:10:18Z

Source — source.main moved to novox/mesh-delivery@5588875c3f. Whether it reached the machines is mesh-delivery-view's, derived from source.main, the wants and the haves.

Group fix/774-new-words-first: novox/mesh-catalog@22ff0d1000, novox/mesh-controller@d96542cd25, novox/mesh-delivery@a2dd7a5c37, novox/mesh-host@2fd165f5af, novox/mesh-sdk@78c9ec8817

  • composed together: pass — the checker's verdict at the members' heads (68cb648a8c30)

Transitions

  • 2026-10-29 23:43 (new) → proposed (announced): novox/mesh-delivery#112's head announced
  • 2026-10-29 23:43 proposed → ready (accepted): a verdict names this commit and the trunk's head as its trunk commit, the gate passed or warned, and the repository's own check did not fail; or the check gates no merge (check-gates-merge false)
  • 2026-10-30 00:10 ready → merged (merged): on the trunk its modules follow: merged there

The commit's note under refs/notes/mesh-plan keeps every transition of this change up to its merge: git log --notes=mesh-plan.

<!-- mesh-delivery:view --> **Delivery** `novox/mesh-delivery@a2dd7a5c37ef` — **merged** since 2026-10-30T00:10:18Z **Source** — source.main moved to novox/mesh-delivery@5588875c3f21. Whether it reached the machines is `mesh-delivery-view`'s, derived from `source.main`, the wants and the haves. **Group** `fix/774-new-words-first`: novox/mesh-catalog@22ff0d1000f3, novox/mesh-controller@d96542cd2503, novox/mesh-delivery@a2dd7a5c37ef, novox/mesh-host@2fd165f5af8e, novox/mesh-sdk@78c9ec881771 - composed together: pass — the checker's verdict at the members' heads (68cb648a8c30) **Transitions** - 2026-10-29 23:43 (new) → proposed (announced): novox/mesh-delivery#112's head announced - 2026-10-29 23:43 proposed → ready (accepted): a verdict names this commit and the trunk's head as its trunk commit, the gate passed or warned, and the repository's own check did not fail; or the check gates no merge (check-gates-merge false) - 2026-10-30 00:10 ready → merged (merged): on the trunk its modules follow: merged there The commit's note under `refs/notes/mesh-plan` keeps every transition of this change up to its merge: `git log --notes=mesh-plan`.
mesh-tools merged commit 5588875c3f into main 2026-10-30 00:10:16 +00:00
mesh-tools deleted branch fix/774-new-words-first 2026-10-30 00:10:16 +00:00
Sign in to join this conversation.
No Reviewers
No labels
1 Participants
Notifications
Due Date
No due date set.
Dependencies

No dependencies set.

Reference: novox/mesh-delivery#112