Bridge for G's take-in: the pre-G package directories again, unused #215

Merged
mesh-tools merged 1 commits from fix/47-G-bridge into main 2026-11-13 13:40:33 +00:00
Member

Group fix/47-G-bridge, with mesh-catalog's bridge. Design 47 milestone G, issue 1966.

G is merged and taken in, but the running pre-G indexer publishes a repository's packages only while every package directory it published before is in the tree. G moved contracts/go and sdk to modules/, so mesh-delivery's packages, G's renamed paths among them, are never published (indexer journal, 2026-11-13: "its packages are not published: the directory contracts/go/clients/containerimageregistryclient is not in novox/mesh-delivery at 93e222a8"). Nothing that imports the new paths can build, G's indexer included.

This puts back contracts/go and sdk exactly as at e70754ef (pre-G), without sdk/module.json so no second module is registered, and without the old seat definitions. Nothing imports them. They go once G's indexer runs.

Checked by lead-47: no G module references the old paths, and the restored trees are byte-for-byte those of e70754ef. The review round is bent, said to the operator: this is pre-G trees restored unchanged.

Reviewed-by: lead-47@shanks at 541eaa20

https://claude.ai/code/session_01NcbgfGKaxw984XyAPfLm4h

Group fix/47-G-bridge, with mesh-catalog's bridge. Design 47 milestone G, issue 1966. G is merged and taken in, but the running pre-G indexer publishes a repository's packages only while every package directory it published before is in the tree. G moved `contracts/go` and `sdk` to `modules/`, so mesh-delivery's packages, G's renamed paths among them, are never published (indexer journal, 2026-11-13: "its packages are not published: the directory contracts/go/clients/containerimageregistryclient is not in novox/mesh-delivery at 93e222a8"). Nothing that imports the new paths can build, G's indexer included. This puts back `contracts/go` and `sdk` exactly as at e70754ef (pre-G), without `sdk/module.json` so no second module is registered, and without the old seat definitions. Nothing imports them. They go once G's indexer runs. Checked by lead-47: no G module references the old paths, and the restored trees are byte-for-byte those of e70754ef. The review round is bent, said to the operator: this is pre-G trees restored unchanged. Reviewed-by: lead-47@shanks at 541eaa20 https://claude.ai/code/session_01NcbgfGKaxw984XyAPfLm4h
mesh-tools added 1 commit 2026-11-13 13:35:10 +00:00
Bridge for G's take-in: the pre-G package directories contracts/go and sdk again, unused
mesh/delivery merged: source.main moved to novox/mesh-delivery@21eaa55b277a
mesh/delivery-group group fix/47-G-bridge merged: every member is merged
mesh/check checking 541eaa20fec4 on 21eaa55b277a
541eaa20fe
The running pre-G indexer publishes a repository's packages only when every package directory it published last is
still in the tree; G moved contracts/go and sdk to modules/, so mesh-delivery's packages, G's renamed paths among them,
are never published and nothing importing them builds (2026-11-13, indexer journal 'its packages are not published').
These are the trees of e70754ef, unchanged, without sdk/module.json (no second module). Nothing imports them; they go
once G's indexer runs and publishes without them.

Claude-Session: https://claude.ai/code/session_01NcbgfGKaxw984XyAPfLm4h
Author
Member

Delivery novox/mesh-delivery@541eaa20fec4 — merged since 2026-11-13T13:40:37Z

Source — source.main moved to novox/mesh-delivery@21eaa55b27. Whether it reached the machines is mesh-delivery-view's, derived from source.main, the wants and the haves.

Group fix/47-G-bridge: novox/mesh-catalog@a4bc3d95ed, novox/mesh-delivery@541eaa20fe

Transitions

  • 2026-11-13 13:35 (new) → proposed (announced): novox/mesh-delivery#215's head announced
  • 2026-11-13 13:35 proposed → ready (accepted): a verdict names this commit and the trunk's head as its trunk commit, the gate passed or warned, and the repository's own check did not fail; or the check gates no merge (check-gates-merge false)
  • 2026-11-13 13:40 ready → merged (merged): on the trunk its modules follow: merged there

The commit's note under refs/notes/mesh-plan keeps every transition of this change up to its merge: git log --notes=mesh-plan.

<!-- mesh-delivery:view --> **Delivery** `novox/mesh-delivery@541eaa20fec4` — **merged** since 2026-11-13T13:40:37Z **Source** — source.main moved to novox/mesh-delivery@21eaa55b277a. Whether it reached the machines is `mesh-delivery-view`'s, derived from `source.main`, the wants and the haves. **Group** `fix/47-G-bridge`: novox/mesh-catalog@a4bc3d95edef, novox/mesh-delivery@541eaa20fec4 **Transitions** - 2026-11-13 13:35 (new) → proposed (announced): novox/mesh-delivery#215's head announced - 2026-11-13 13:35 proposed → ready (accepted): a verdict names this commit and the trunk's head as its trunk commit, the gate passed or warned, and the repository's own check did not fail; or the check gates no merge (check-gates-merge false) - 2026-11-13 13:40 ready → merged (merged): on the trunk its modules follow: merged there The commit's note under `refs/notes/mesh-plan` keeps every transition of this change up to its merge: `git log --notes=mesh-plan`.
mesh-tools merged commit 21eaa55b27 into main 2026-11-13 13:40:33 +00:00
mesh-tools deleted branch fix/47-G-bridge 2026-11-13 13:40:34 +00:00
Sign in to join this conversation.
No Reviewers
No labels
1 Participants
Notifications
Due Date
No due date set.
Dependencies

No dependencies set.

Reference: novox/mesh-delivery#215