Issue 1886 (critical): R4e's delivery plan cannot finish, because the controller takes modules only from referenced builder keys and only R4e's own, not yet delivered, build modules write references. ADR 0522 §1: each builder instance keeps a key under its node name in its state instances, written only once mesh-build-go, mesh-build-node and mesh-build-image have each answered a step with a reference, and deleted when it stops; the controller watches it (the other member of this group, mesh-controller, same branch).
Tests: TestManifestDeclarations, TestTheBuilderTellsWhichBuildModuleAnsweredAReference, TestTheBuilderSaysItWritesReferencesOnceEveryBuildModuleAnsweredOne (seen failing first); unit suite and vet (with and without the integration tag) green. No try could run: mesh-controller.try is served by R4e's checker, which is stuck in the same plan (issue 1886); the integration test runs at the merge check.
Issue 1886 (critical): R4e's delivery plan cannot finish, because the controller takes modules only from referenced builder keys and only R4e's own, not yet delivered, build modules write references. ADR 0522 §1: each builder instance keeps a key under its node name in its state `instances`, written only once mesh-build-go, mesh-build-node and mesh-build-image have each answered a step with a reference, and deleted when it stops; the controller watches it (the other member of this group, mesh-controller, same branch).
Tests: TestManifestDeclarations, TestTheBuilderTellsWhichBuildModuleAnsweredAReference, TestTheBuilderSaysItWritesReferencesOnceEveryBuildModuleAnsweredOne (seen failing first); unit suite and vet (with and without the integration tag) green. No try could run: mesh-controller.try is served by R4e's checker, which is stuck in the same plan (issue 1886); the integration test runs at the merge check.
Reviewed-by: review-1886@shanks at 9fad90ee890a2097a6dd49bc28d4e08af56c5a90
The controller delivers from the builder's keys only while a running builder
says its done keys name references; a builder from before R4e says nothing,
so R4e's own delivery is asked of build-agent instead of waiting for ever.
The say is put once started and taken away when stopped.
mesh/merge-gate head 9fad90ee890a merged into trunk b714eab995a5 — pass: builds mesh-delivery-builder → novox; no bus step; the change touches no module of…
The references come from the build modules' own pushes, so a new builder beside
an old build module writes none; saying it at start would send the controller
to keys that fail not stored.
mesh-delivery-builder on every machine running it: sent
Transitions
2026-10-22 23:07 (new) → proposed (announced): novox/mesh-delivery#23's head announced
2026-10-22 23:38 proposed → checked (checked): a verdict names this commit and the trunk's head as its trunk commit
2026-10-22 23:38 checked → ready (accepted): the gate passed or warned, and the repository's own check did not fail
2026-10-23 00:28 ready → published (merged): on the trunk its modules follow: merged there, and its walk opened — or nothing for a walk to move
2026-10-23 00:28 published → delivering (go): its walk started: let go by this owner in its group's order, by a person, or on the controller's own path — not a failed walk that carried a later commit for it, after which it waits for a walk of its own commit
2026-10-23 00:35 delivering → delivered (done): its walk is done, carrying its own commit: every machine of its deploy plan passed, or was left as its policy says
The commit's note under refs/notes/mesh-plan keeps every transition: git log --notes=mesh-plan.
<!-- mesh-delivery:view -->
**Delivery** `novox/mesh-delivery@9fad90ee890a` — **delivered** since 2026-10-23T00:35:30Z
**Delivery plan** — builds mesh-delivery-builder → novox; no bus step
- tier 0: mesh-delivery-builder
- novox: receives mesh-delivery-builder
**Group** `fix/1886-builder-says-references`: novox/mesh-controller@bbadbb2af021, novox/mesh-delivery@9fad90ee890a
**Machines**
- mesh-delivery-builder on every machine running it: sent
**Transitions**
- 2026-10-22 23:07 (new) → proposed (announced): novox/mesh-delivery#23's head announced
- 2026-10-22 23:38 proposed → checked (checked): a verdict names this commit and the trunk's head as its trunk commit
- 2026-10-22 23:38 checked → ready (accepted): the gate passed or warned, and the repository's own check did not fail
- 2026-10-23 00:28 ready → published (merged): on the trunk its modules follow: merged there, and its walk opened — or nothing for a walk to move
- 2026-10-23 00:28 published → delivering (go): its walk started: let go by this owner in its group's order, by a person, or on the controller's own path — not a failed walk that carried a later commit for it, after which it waits for a walk of its own commit
- 2026-10-23 00:35 delivering → delivered (done): its walk is done, carrying its own commit: every machine of its deploy plan passed, or was left as its policy says
The commit's note under `refs/notes/mesh-plan` keeps every transition: `git log --notes=mesh-plan`.
Merge check at 9fad90ee
Judged: head 9fad90ee890a merged into trunk b714eab995a5; read beside it: mesh-catalog 89e15c7bcda6, mesh-controller 289bbf68e4f9, mesh-controller-main 289bbf68e4f9, mesh-host 48c3e3834c69, mesh-tools e0fadc43d9dd
mesh/merge-gate: PASS — the change touches no module of the mesh's graph
mesh/repo-check: PASS — its merge-check.sh passed
Delivery plan — builds mesh-delivery-builder → novox; no bus step
tier 0: mesh-delivery-builder
novox: receives mesh-delivery-builder
Run by the build seat on ace as build-1792710441350896188 (builds --log build-1792710441350896188).
--- its merge-check.sh (go toolchain)
== ./modules/mesh-delivery-builder: go vet and the unit tests
ok mesh-delivery-builder 0.003s
ok mesh-delivery-builder/cmd/mesh-delivery-builder 0.004s
ok mesh-delivery-builder/internal/build 0.016s
== ./modules/mesh-delivery-builder: the integration tests (-tags integration)
ok mesh-delivery-builder 0.004s
ok mesh-delivery-builder/cmd/mesh-delivery-builder 3.297s
ok mesh-delivery-builder/internal/build 0.013s
== ./modules/mesh-delivery-checker: go vet and the unit tests
ok mesh-delivery-checker 0.004s
ok mesh-delivery-checker/cmd/mesh-delivery-checker 0.008s
ok mesh-delivery-checker/cmd/mesh-delivery-checker-tools (cached)
ok mesh-delivery-checker/internal/check 0.046s
== ./modules/mesh-delivery-checker: the integration tests (-tags integration)
ok mesh-delivery-checker 0.005s
ok mesh-delivery-checker/cmd/mesh-delivery-checker 7.100s
ok mesh-delivery-checker/cmd/mesh-delivery-checker-tools (cached)
ok mesh-delivery-checker/internal/check 0.047s
== ./modules/mesh-delivery-forge-bridge: go vet and the unit tests
ok mesh-delivery-forge-bridge 0.003s
ok mesh-delivery-forge-bridge/cmd/mesh-delivery-forge-bridge (cached)
ok mesh-delivery-forge-bridge/internal/bridge 0.198s
== ./modules/mesh-delivery-forge-bridge: the integration tests (-tags integration)
ok mesh-delivery-forge-bridge 0.004s
ok mesh-delivery-forge-bridge/cmd/mesh-delivery-forge-bridge 5.630s
ok mesh-delivery-forge-bridge/internal/bridge 0.197s
== ./modules/mesh-delivery-indexer: go vet and the unit tests
ok mesh-delivery-indexer 0.003s
ok mesh-delivery-indexer/cmd/mesh-delivery-indexer (cached)
ok mesh-delivery-indexer/internal/index 0.064s
== ./modules/mesh-delivery-indexer: the integration tests (-tags integration)
ok mesh-delivery-indexer 0.003s
ok mesh-delivery-indexer/cmd/mesh-delivery-indexer 1.022s
ok mesh-delivery-indexer/internal/index 0.057s
== ./modules/mesh-delivery-teller: go vet and the unit tests
ok mesh-delivery-teller 0.003s
ok mesh-delivery-teller/cmd/mesh-delivery-teller (cached)
== ./modules/mesh-delivery-teller: the integration tests (-tags integration)
ok mesh-delivery-teller 0.002s
ok mesh-delivery-teller/cmd/mesh-delivery-teller (cached)
== ./modules/mesh-delivery-view: go vet and the unit tests
ok mesh-delivery-view 0.003s
ok mesh-delivery-view/cmd/mesh-delivery-cli (cached)
ok mesh-delivery-view/cmd/mesh-delivery-view (cached)
ok mesh-delivery-view/cmd/mesh-delivery-view-tools (cached)
ok mesh-delivery-view/internal/view (cached)
== ./modules/mesh-delivery-view: the integration tests (-tags integration)
ok mesh-delivery-view 0.003s
ok mesh-delivery-view/cmd/mesh-delivery-cli (cached)
ok mesh-delivery-view/cmd/mesh-delivery-view (cached)
ok mesh-delivery-view/cmd/mesh-delivery-view-tools (cached)
ok mesh-delivery-view/internal/view (cached)
== ./modules/mesh-delivery-watchman: go vet and the unit tests
ok mesh-delivery-watchman 0.002s
ok mesh-delivery-watchman/cmd/mesh-delivery-watchman (cached)
ok mesh-delivery-watchman/internal/watch (cached)
== ./modules/mesh-delivery-watchman: the integration tests (-tags integration)
ok mesh-delivery-watchman 0.003s
ok mesh-delivery-watchman/cmd/mesh-delivery-watchman (cached)
ok mesh-delivery-watchman/internal/watch (cached)
**Merge check** at `9fad90ee`
Judged: head `9fad90ee890a` merged into trunk `b714eab995a5`; read beside it: mesh-catalog `89e15c7bcda6`, mesh-controller `289bbf68e4f9`, mesh-controller-main `289bbf68e4f9`, mesh-host `48c3e3834c69`, mesh-tools `e0fadc43d9dd`
- `mesh/merge-gate`: **PASS** — the change touches no module of the mesh's graph
- `mesh/repo-check`: **PASS** — its merge-check.sh passed
**Delivery plan** — builds mesh-delivery-builder → novox; no bus step
- tier 0: mesh-delivery-builder
- novox: receives mesh-delivery-builder
Run by the build seat on ace as `build-1792710441350896188` (`builds --log build-1792710441350896188`).
```
--- its merge-check.sh (go toolchain)
== ./modules/mesh-delivery-builder: go vet and the unit tests
ok mesh-delivery-builder 0.003s
ok mesh-delivery-builder/cmd/mesh-delivery-builder 0.004s
ok mesh-delivery-builder/internal/build 0.016s
== ./modules/mesh-delivery-builder: the integration tests (-tags integration)
ok mesh-delivery-builder 0.004s
ok mesh-delivery-builder/cmd/mesh-delivery-builder 3.297s
ok mesh-delivery-builder/internal/build 0.013s
== ./modules/mesh-delivery-checker: go vet and the unit tests
ok mesh-delivery-checker 0.004s
ok mesh-delivery-checker/cmd/mesh-delivery-checker 0.008s
ok mesh-delivery-checker/cmd/mesh-delivery-checker-tools (cached)
ok mesh-delivery-checker/internal/check 0.046s
== ./modules/mesh-delivery-checker: the integration tests (-tags integration)
ok mesh-delivery-checker 0.005s
ok mesh-delivery-checker/cmd/mesh-delivery-checker 7.100s
ok mesh-delivery-checker/cmd/mesh-delivery-checker-tools (cached)
ok mesh-delivery-checker/internal/check 0.047s
== ./modules/mesh-delivery-forge-bridge: go vet and the unit tests
ok mesh-delivery-forge-bridge 0.003s
ok mesh-delivery-forge-bridge/cmd/mesh-delivery-forge-bridge (cached)
ok mesh-delivery-forge-bridge/internal/bridge 0.198s
== ./modules/mesh-delivery-forge-bridge: the integration tests (-tags integration)
ok mesh-delivery-forge-bridge 0.004s
ok mesh-delivery-forge-bridge/cmd/mesh-delivery-forge-bridge 5.630s
ok mesh-delivery-forge-bridge/internal/bridge 0.197s
== ./modules/mesh-delivery-indexer: go vet and the unit tests
ok mesh-delivery-indexer 0.003s
ok mesh-delivery-indexer/cmd/mesh-delivery-indexer (cached)
ok mesh-delivery-indexer/internal/index 0.064s
== ./modules/mesh-delivery-indexer: the integration tests (-tags integration)
ok mesh-delivery-indexer 0.003s
ok mesh-delivery-indexer/cmd/mesh-delivery-indexer 1.022s
ok mesh-delivery-indexer/internal/index 0.057s
== ./modules/mesh-delivery-teller: go vet and the unit tests
ok mesh-delivery-teller 0.003s
ok mesh-delivery-teller/cmd/mesh-delivery-teller (cached)
== ./modules/mesh-delivery-teller: the integration tests (-tags integration)
ok mesh-delivery-teller 0.002s
ok mesh-delivery-teller/cmd/mesh-delivery-teller (cached)
== ./modules/mesh-delivery-view: go vet and the unit tests
ok mesh-delivery-view 0.003s
ok mesh-delivery-view/cmd/mesh-delivery-cli (cached)
ok mesh-delivery-view/cmd/mesh-delivery-view (cached)
ok mesh-delivery-view/cmd/mesh-delivery-view-tools (cached)
ok mesh-delivery-view/internal/view (cached)
== ./modules/mesh-delivery-view: the integration tests (-tags integration)
ok mesh-delivery-view 0.003s
ok mesh-delivery-view/cmd/mesh-delivery-cli (cached)
ok mesh-delivery-view/cmd/mesh-delivery-view (cached)
ok mesh-delivery-view/cmd/mesh-delivery-view-tools (cached)
ok mesh-delivery-view/internal/view (cached)
== ./modules/mesh-delivery-watchman: go vet and the unit tests
ok mesh-delivery-watchman 0.002s
ok mesh-delivery-watchman/cmd/mesh-delivery-watchman (cached)
ok mesh-delivery-watchman/internal/watch (cached)
== ./modules/mesh-delivery-watchman: the integration tests (-tags integration)
ok mesh-delivery-watchman 0.003s
ok mesh-delivery-watchman/cmd/mesh-delivery-watchman (cached)
ok mesh-delivery-watchman/internal/watch (cached)
```
Blocking a user prevents them from interacting with repositories, such as opening or commenting on pull requests or issues. Learn more about blocking a user.
Issue 1886 (critical): R4e's delivery plan cannot finish, because the controller takes modules only from referenced builder keys and only R4e's own, not yet delivered, build modules write references. ADR 0522 §1: each builder instance keeps a key under its node name in its state
instances, written only once mesh-build-go, mesh-build-node and mesh-build-image have each answered a step with a reference, and deleted when it stops; the controller watches it (the other member of this group, mesh-controller, same branch).Tests: TestManifestDeclarations, TestTheBuilderTellsWhichBuildModuleAnsweredAReference, TestTheBuilderSaysItWritesReferencesOnceEveryBuildModuleAnsweredOne (seen failing first); unit suite and vet (with and without the integration tag) green. No try could run: mesh-controller.try is served by R4e's checker, which is stuck in the same plan (issue 1886); the integration test runs at the merge check.
Reviewed-by: review-1886@shanks at
9fad90ee89Delivery
novox/mesh-delivery@9fad90ee890a— delivered since 2026-10-23T00:35:30ZDelivery plan — builds mesh-delivery-builder → novox; no bus step
Group
fix/1886-builder-says-references: novox/mesh-controller@bbadbb2af0, novox/mesh-delivery@9fad90ee89Machines
Transitions
The commit's note under
refs/notes/mesh-plankeeps every transition:git log --notes=mesh-plan.Merge check at
9fad90eeJudged: head
9fad90ee890amerged into trunkb714eab995a5; read beside it: mesh-catalog89e15c7bcda6, mesh-controller289bbf68e4f9, mesh-controller-main289bbf68e4f9, mesh-host48c3e3834c69, mesh-toolse0fadc43d9ddmesh/merge-gate: PASS — the change touches no module of the mesh's graphmesh/repo-check: PASS — its merge-check.sh passedDelivery plan — builds mesh-delivery-builder → novox; no bus step
Run by the build seat on ace as
build-1792710441350896188(builds --log build-1792710441350896188).