On 21 Nov the order was the reverse of the first commit's: mesh-contracts'
old build was withdrawn first (21:50:16), so the stayers that awaited it
were placed not asked, and only then did the hand-offs take it away. A
mover that left is still a dependency of those stayers: their not-asked
steps held the pipeline's end as failures. At the hand-off the steps of
each stayer that ended not asked on a dependency that left, directly or
through a mover itself taken out, are taken out, so the placing that
follows places them again against the newest published package; a
dependency that truly did not build is named again at that placing. The
journal says which movers are placed again.
Builds: design 47 H H-A-361, H-A-53, H-A-223