The node-engine held 1,707 top-level unit tests against the budget of 500
a module. Each unit test file with two or more tests now runs them as
subtests of one test named for the file, each named as its function was,
in the same order: every check is kept, and the check counts 383. Files
with a TestMain, a re-run of a test by its name, or the integration tag
are left. Four files of this branch's earlier commits are formatted.
Builds: design 47 H2 §819; H-A-349 DQ-14
The controller ended by its unassignment (issue 1126, ADR 0590), so no build is judged by the lease: the lease
witness, its contract and the direct get the witness asked it with are removed, and its tests now prove each rollback
path on the node tools' PING.
Claude-Session: https://claude.ai/code/session_01NcbgfJ9Gum47zkFKWRaovL
The launcher trusted a counter only a by-hand reconcile ever cleared and a
known-good nothing in the daemon wrote, so no machine could roll its host back;
the controller and the node tools were replaced in place with nothing kept.
- The launcher runs a delivered host that is not known-good on trial: one that
crashes, stops for nothing, or does not report within ten minutes goes back
to known-good, once per version, recorded in rolled-back. The host proves
itself when the mesh takes a report under its own build, says every standing
verdict on its reports, never stands aside for a rolled-back version, and
restarts its service once when its launcher was replaced on disk.
- The engine keeps the controller's and the node tools' previous build beside
the new one and judges the new one: the lease taken by the controller it
started (read-only direct get of mesh-controller_lease/holder), or this
machine's runtime answering $SRV.PING.node-tools.<node>, within sixty seconds
of time it could ask. Not healthy: the previous restored, once, said. Proved:
the previous deleted. A build declared not-reversible is never rolled back.
- Retire never removes a version newer than the running one.