Commit Graph
4 Commits
Author SHA1 Message Date
jschoubben 0c01c81c3f E8: run each file's unit tests as subtests of one test
The node-engine held 1,707 top-level unit tests against the budget of 500
a module. Each unit test file with two or more tests now runs them as
subtests of one test named for the file, each named as its function was,
in the same order: every check is kept, and the check counts 383. Files
with a TestMain, a re-run of a test by its name, or the integration tag
are left. Four files of this branch's earlier commits are formatted.

Builds: design 47 H2 §819; H-A-349 DQ-14
2026-11-22 00:30:05 +01:00
mesh-tools 52600ec7bd Take the node-engine's parser from mesh-sdk: remaining imports (issue 1392)
mesh/merge-gate head 52600ec7bd61 merged into trunk cdcba9ca7375 — pass: builds mesh-host → ace, g14, novox, shanks; no bus step; every machine composes wi…
mesh/repo-check head 52600ec7bd61 merged into trunk cdcba9ca7375 — pass: its merge-check.sh passed
mesh/delivery delivered
2026-10-20 11:17:14 +00:00
jochen 9545121ec9 Clear an old pass on a wait, and say a change of waits (review of #78)
mesh/merge-gate pass: builds mesh-host → ace, g14, novox, shanks; no bus step; every machine composes with the change as it did without (4 of 4 compose)
mesh/repo-check pass: its merge-check.sh passed
mesh/delivery delivered
A resource that passed, then waited, then failed once after its grace was
still stated healthy from the old pass; and a change of what it waits for
alone raised no change event, so the controller could miss it.
2026-10-10 21:14:14 +02:00
jochen 3abb07f1e2 State a tool check that waits for the operator as waiting (issue 386, ADR 0283)
mesh/delivery superseded: a newer head of the same pull request
mesh/merge-gate pass: builds mesh-host → ace, g14, novox, shanks; no bus step; every machine composes with the change as it did without (4 of 4 compose)
mesh/repo-check pass: its merge-check.sh passed
A module whose only fault was a secret the operator had not given yet was
stated unhealthy, failed its first-node gate and was put back. The engine
now reads the tool's answer through mesh-sdk go/health and states such a
resource waiting, with what it waits for, on one look; a malformed wait
stays unhealthy.
2026-10-10 21:11:02 +02:00