Pins mesh-sdk eff81f1 (reviewed in the mesh-sdk member); vet, vet integration and the whole suite pass.
Group fix/held-module-and-assigner-contract (mesh-sdk, mesh-host, mesh-delivery, mesh-catalog), issue 774. The lead merges once mesh/check and mesh/delivery-group are green (operator, 2026-10-30 20:41); mesh-sdk first.
Reviewed-by: rev-sweep@shanks at 62cfb45789
Pins mesh-sdk eff81f1 (reviewed in the mesh-sdk member); vet, vet integration and the whole suite pass.
Group fix/held-module-and-assigner-contract (mesh-sdk, mesh-host, mesh-delivery, mesh-catalog), issue 774. The lead merges once mesh/check and mesh/delivery-group are green (operator, 2026-10-30 20:41); mesh-sdk first.
Reviewed-by: rev-sweep@shanks at 62cfb45789c108a850c0c5fdc09bf76abc46e990
Deliverynovox/mesh-host@62cfb45789c1 — merged since 2026-10-30T21:17:41Z
Source — source.main moved to novox/mesh-host@1e833feb39. Whether it reached the machines is mesh-delivery-view's, derived from source.main, the wants and the haves.
composed together: pass — the checker's verdict at the members' heads (e5a2974f3e1e)
Transitions
2026-10-30 20:31 (new) → proposed (announced): novox/mesh-host#183's head announced
2026-10-30 20:31 proposed → ready (accepted): a verdict names this commit and the trunk's head as its trunk commit, the gate passed or warned, and the repository's own check did not fail; or the check gates no merge (check-gates-merge false)
2026-10-30 21:17 ready → merged (merged): on the trunk its modules follow: merged there
The commit's note under refs/notes/mesh-plan keeps every transition of this change up to its merge: git log --notes=mesh-plan.
<!-- mesh-delivery:view -->
**Delivery** `novox/mesh-host@62cfb45789c1` — **merged** since 2026-10-30T21:17:41Z
**Source** — source.main moved to novox/mesh-host@1e833feb3940. Whether it reached the machines is `mesh-delivery-view`'s, derived from `source.main`, the wants and the haves.
**Group** `fix/held-module-and-assigner-contract`: novox/mesh-catalog@b5475cfa5c3d, novox/mesh-delivery@8fe6442c4754, novox/mesh-host@62cfb45789c1, novox/mesh-sdk@eff81f1220e2
- composed together: pass — the checker's verdict at the members' heads (e5a2974f3e1e)
**Transitions**
- 2026-10-30 20:31 (new) → proposed (announced): novox/mesh-host#183's head announced
- 2026-10-30 20:31 proposed → ready (accepted): a verdict names this commit and the trunk's head as its trunk commit, the gate passed or warned, and the repository's own check did not fail; or the check gates no merge (check-gates-merge false)
- 2026-10-30 21:17 ready → merged (merged): on the trunk its modules follow: merged there
The commit's note under `refs/notes/mesh-plan` keeps every transition of this change up to its merge: `git log --notes=mesh-plan`.
mesh-delivery: the operator's Approve of this pull request's merge into main is ended: a head it covers moved on: the heads it covers are no longer the group's heads. Nothing is merged on it. The operator is asked again once the checks pass at the new head.
mesh-delivery: the operator's Approve of this pull request's merge into main is ended: a head it covers moved on: the heads it covers are no longer the group's heads. Nothing is merged on it. The operator is asked again once the checks pass at the new head.
mesh-delivery: the operator's Approve of this pull request's merge into main is ended: a head it covers moved on: the heads it covers are no longer the group's heads. Nothing is merged on it. The operator is asked again once the checks pass at the new head.
mesh-delivery: the operator's Approve of this pull request's merge into main is ended: a head it covers moved on: the heads it covers are no longer the group's heads. Nothing is merged on it. The operator is asked again once the checks pass at the new head.
Blocking a user prevents them from interacting with repositories, such as opening or commenting on pull requests or issues. Learn more about blocking a user.
Pins mesh-sdk eff81f1 (reviewed in the mesh-sdk member); vet, vet integration and the whole suite pass.
Group fix/held-module-and-assigner-contract (mesh-sdk, mesh-host, mesh-delivery, mesh-catalog), issue 774. The lead merges once mesh/check and mesh/delivery-group are green (operator, 2026-10-30 20:41); mesh-sdk first.
Reviewed-by: rev-sweep@shanks at
62cfb45789Delivery
novox/mesh-host@62cfb45789c1— merged since 2026-10-30T21:17:41ZSource — source.main moved to novox/mesh-host@1e833feb39. Whether it reached the machines is
mesh-delivery-view's, derived fromsource.main, the wants and the haves.Group
fix/held-module-and-assigner-contract: novox/mesh-catalog@b5475cfa5c, novox/mesh-delivery@8fe6442c47, novox/mesh-host@62cfb45789, novox/mesh-sdk@eff81f1220Transitions
The commit's note under
refs/notes/mesh-plankeeps every transition of this change up to its merge:git log --notes=mesh-plan.mesh-delivery: the operator's Approve of this pull request's merge into main is ended: a head it covers moved on: the heads it covers are no longer the group's heads. Nothing is merged on it. The operator is asked again once the checks pass at the new head.
mesh-delivery: the operator's Approve of this pull request's merge into main is ended: a head it covers moved on: the heads it covers are no longer the group's heads. Nothing is merged on it. The operator is asked again once the checks pass at the new head.