N1 assigned the module and stopped, and the mesh wrote a names file with no names
in it. That is correct behaviour, not a bug: a node with no address on the
network has no name, because a name resolving to nothing is worse than no name —
a connection to an address that does not answer hangs, where a name that does not
resolve fails at once and says so.
The missing act is placement. Assigning installs the module that answers how
machines reach each other; placing says where this machine is on the resulting
network. The four-machine test did both and this one did neither, which is how
the distinction stayed invisible.
Claude-Session: https://claude.ai/code/session_01D6qtiYU3P9jk3pnAXyAFyx
Two claims were bundled in one step: that the control plane can describe the mesh
correctly, and that the catalogue holds a complete record of what was built. The
first passes; the second is novox/hq issue 050. Bundled, one open fault stopped
three later steps from ever being attempted, which is exactly the information the
run existed to produce.
The catalogue is now measured against what the control plane ordered rather than
against a list written in the test — a catalogue cannot know what it was never
told, so it has to be compared with something that does.