Commit Graph
1 Commits
Author SHA1 Message Date
jschoubben d0d56782a0 Split describing the mesh from the catalogue holding it
Two claims were bundled in one step: that the control plane can describe the mesh
correctly, and that the catalogue holds a complete record of what was built. The
first passes; the second is novox/hq issue 050. Bundled, one open fault stopped
three later steps from ever being attempted, which is exactly the information the
run existed to produce.

The catalogue is now measured against what the control plane ordered rather than
against a list written in the test — a catalogue cannot know what it was never
told, so it has to be compared with something that does.

Claude-Session: https://claude.ai/code/session_01D6qtiYU3P9jk3pnAXyAFyx
2026-09-14 22:17:06 +02:00