Register R314: an answer larger than one message of the bus is paged, not lost (hq issue 314) #66

Merged
mesh-admin merged 1 commits from replays/314-a-large-answer into main 2026-10-08 11:09:58 +00:00
Contributor

Registers R314 for hq issue 314: InRepository, mesh-controller ./internal/link, TestReplay314, file internal/link/replay314_test.go, Fix 4b43115 (novox/mesh-controller #138; its first parent is the controller's main).

go run ./replays/cmd/prove R314: R314 (issue 314): PROVED — before its fix fails, on its fix passes. Before the fix: an answer of about 3145728 bytes did not arrive: replay-314 did not answer conditions within 5s.

sh merge-check.sh: passes (typecheck, unit suite, replays register tests).

Merge after novox/mesh-controller #138, so Fix names a commit on its main. #138 is one commit, merged as it stands.

Registers R314 for hq issue 314: InRepository, mesh-controller `./internal/link`, `TestReplay314`, file `internal/link/replay314_test.go`, Fix `4b43115` (novox/mesh-controller #138; its first parent is the controller's main). `go run ./replays/cmd/prove R314`: `R314 (issue 314): PROVED — before its fix fails, on its fix passes`. Before the fix: `an answer of about 3145728 bytes did not arrive: replay-314 did not answer conditions within 5s`. `sh merge-check.sh`: passes (typecheck, unit suite, replays register tests). Merge after novox/mesh-controller #138, so `Fix` names a commit on its main. #138 is one commit, merged as it stands.
Author
Contributor

Delivery novox/mesh-lab@d452a47be012 — delivered since 2026-10-08T11:10:12Z

Delivery plan — builds nothing: the change touches no module of the mesh's graph

Transitions

  • 2026-10-08 11:08 (new) → proposed (announced): novox/mesh-lab#66's head announced
  • 2026-10-08 11:09 proposed → checked (checked): the verdict names this commit
  • 2026-10-08 11:09 checked → ready (accepted): the gate passed or warned, and the repository's own check did not fail
  • 2026-10-08 11:10 ready → published (merged): on the trunk its modules follow: merged there, and its walk opened — or nothing for a walk to move
  • 2026-10-08 11:10 published → delivered (done): nothing for a walk to move

The commit's note under refs/notes/mesh-plan keeps every transition: git log --notes=mesh-plan.

<!-- mesh-delivery:view --> **Delivery** `novox/mesh-lab@d452a47be012` — **delivered** since 2026-10-08T11:10:12Z **Delivery plan** — builds nothing: the change touches no module of the mesh's graph **Transitions** - 2026-10-08 11:08 (new) → proposed (announced): novox/mesh-lab#66's head announced - 2026-10-08 11:09 proposed → checked (checked): the verdict names this commit - 2026-10-08 11:09 checked → ready (accepted): the gate passed or warned, and the repository's own check did not fail - 2026-10-08 11:10 ready → published (merged): on the trunk its modules follow: merged there, and its walk opened — or nothing for a walk to move - 2026-10-08 11:10 published → delivered (done): nothing for a walk to move The commit's note under `refs/notes/mesh-plan` keeps every transition: `git log --notes=mesh-plan`.
jschoubben force-pushed replays/314-a-large-answer from 7f67fea9c2 to 28dda61977 2026-10-08 10:24:25 +00:00 Compare
jschoubben added 1 commit 2026-10-08 11:08:01 +00:00
Register R314: an answer larger than one message of the bus is paged, not lost (hq issue 314)
mesh/merge-gate pass: the change touches no module of the mesh's graph
mesh/repo-check pass: its merge-check.sh passed, each part in its toolchain: merge-check.sh (typescript), replays/merge-check.sh (go)
mesh/delivery delivered
d452a47be0
Proved by the prover: fails on the controller's main before the fix (the caller
times out), passes on mesh-controller 175b28e.
jschoubben force-pushed replays/314-a-large-answer from 28dda61977 to d452a47be0 2026-10-08 11:08:01 +00:00 Compare
mesh-admin merged commit 596f0b4532 into main 2026-10-08 11:09:58 +00:00
mesh-admin deleted branch replays/314-a-large-answer 2026-10-08 11:09:58 +00:00
Sign in to join this conversation.
No Reviewers
No labels
2 Participants
Notifications
Due Date
No due date set.
Dependencies

No dependencies set.

Reference: novox/mesh-lab#66