R330 replays hq issue 330: a consumer that never acknowledges an event gives it up, and the event is kept on the bus with its consumer, stream, subject, deliveries and when it was given up. A test in the controller (internal/link/replay330_test.go, mesh-controller#159).
Proved with go run ./replays/cmd/prove R330: PROVED, fails before its fix (a5f53ef), passes on it (75e567a). Fix is the pull request's head; Before is the main it is cut from, to be cleared once it merges.
Not touched: test/integration/events.test.ts still asserts the AMQP broker's dead-letter exchange, from before the bus moved to NATS; it does not run against today's bus.
merge-check.sh: passed locally.
Delivery group: fix/330-a-message-given-up-on-is-kept with mesh-controller, mesh-tools and hq.
R330 replays hq issue 330: a consumer that never acknowledges an event gives it up, and the event is kept on the bus with its consumer, stream, subject, deliveries and when it was given up. A test in the controller (`internal/link/replay330_test.go`, mesh-controller#159).
Proved with `go run ./replays/cmd/prove R330`: PROVED, fails before its fix (a5f53ef), passes on it (75e567a). Fix is the pull request's head; Before is the main it is cut from, to be cleared once it merges.
Not touched: `test/integration/events.test.ts` still asserts the AMQP broker's dead-letter exchange, from before the bus moved to NATS; it does not run against today's bus.
merge-check.sh: passed locally.
Delivery group: `fix/330-a-message-given-up-on-is-kept` with mesh-controller, mesh-tools and hq.
Deliverynovox/mesh-lab@f91164863bf6 — delivered since 2026-10-08T19:27:25Z
Delivery plan — builds nothing: the change touches no module of the mesh's graph
Transitions
2026-10-08 19:15 (new) → proposed (announced): novox/mesh-lab#70's head announced
2026-10-08 19:16 proposed → checked (checked): the verdict names this commit
2026-10-08 19:16 checked → ready (accepted): the gate passed or warned, and the repository's own check did not fail
2026-10-08 19:27 ready → published (merged): on the trunk its modules follow: merged there, and its walk opened — or nothing for a walk to move
2026-10-08 19:27 published → delivered (done): nothing for a walk to move
The commit's note under refs/notes/mesh-plan keeps every transition: git log --notes=mesh-plan.
<!-- mesh-delivery:view -->
**Delivery** `novox/mesh-lab@f91164863bf6` — **delivered** since 2026-10-08T19:27:25Z
**Delivery plan** — builds nothing: the change touches no module of the mesh's graph
**Transitions**
- 2026-10-08 19:15 (new) → proposed (announced): novox/mesh-lab#70's head announced
- 2026-10-08 19:16 proposed → checked (checked): the verdict names this commit
- 2026-10-08 19:16 checked → ready (accepted): the gate passed or warned, and the repository's own check did not fail
- 2026-10-08 19:27 ready → published (merged): on the trunk its modules follow: merged there, and its walk opened — or nothing for a walk to move
- 2026-10-08 19:27 published → delivered (done): nothing for a walk to move
The commit's note under `refs/notes/mesh-plan` keeps every transition: `git log --notes=mesh-plan`.
Blocking a user prevents them from interacting with repositories, such as opening or commenting on pull requests or issues. Learn more about blocking a user.
R330 replays hq issue 330: a consumer that never acknowledges an event gives it up, and the event is kept on the bus with its consumer, stream, subject, deliveries and when it was given up. A test in the controller (
internal/link/replay330_test.go, mesh-controller#159).Proved with
go run ./replays/cmd/prove R330: PROVED, fails before its fix (a5f53ef), passes on it (75e567a). Fix is the pull request's head; Before is the main it is cut from, to be cleared once it merges.Not touched:
test/integration/events.test.tsstill asserts the AMQP broker's dead-letter exchange, from before the bus moved to NATS; it does not run against today's bus.merge-check.sh: passed locally.
Delivery group:
fix/330-a-message-given-up-on-is-keptwith mesh-controller, mesh-tools and hq.Delivery
novox/mesh-lab@f91164863bf6— delivered since 2026-10-08T19:27:25ZDelivery plan — builds nothing: the change touches no module of the mesh's graph
Transitions
The commit's note under
refs/notes/mesh-plankeeps every transition:git log --notes=mesh-plan.18fb698de7to54db7c3458