Register R335: a passed gate is not failed by the first machine's later reports (hq issue 335) #72

Merged
mesh-admin merged 1 commits from replays/335-a-passed-gate-is-kept into main 2026-10-08 19:54:35 +00:00
Contributor

hq issue 335: dunst's build passed its gate on the laptop and was marked failed at its gate, and put back, 28 minutes later, because the plan read the laptop's silence about another walk's send as the passed build never applied.

R335 is TestReplay335 in mesh-controller (#165), written with only what the controller had before the fix.

Proved with go run ./replays/cmd/prove R335: fails on 7f65e62 (main), passes on becd40b (the fix's head):

R335 (issue 335): PROVED — before its fix fails, on its fix passes

replays/merge-check.sh passes locally. Once mesh-controller#165 merges, Before is cleared and Fix points at the merged commit.

hq issue 335: dunst's build passed its gate on the laptop and was marked failed at its gate, and put back, 28 minutes later, because the plan read the laptop's silence about another walk's send as the passed build never applied. R335 is `TestReplay335` in mesh-controller (#165), written with only what the controller had before the fix. Proved with `go run ./replays/cmd/prove R335`: fails on 7f65e62 (main), passes on becd40b (the fix's head): R335 (issue 335): PROVED — before its fix fails, on its fix passes `replays/merge-check.sh` passes locally. Once mesh-controller#165 merges, `Before` is cleared and `Fix` points at the merged commit.
Author
Contributor

Delivery novox/mesh-lab@06fa70d081fc — delivered since 2026-10-08T19:54:56Z

Delivery plan — builds nothing: the change touches no module of the mesh's graph

Transitions

  • 2026-10-08 19:52 (new) → proposed (announced): novox/mesh-lab#72's head announced
  • 2026-10-08 19:52 proposed → checked (checked): the verdict names this commit
  • 2026-10-08 19:52 checked → ready (accepted): the gate passed or warned, and the repository's own check did not fail
  • 2026-10-08 19:54 ready → published (merged): on the trunk its modules follow: merged there, and its walk opened — or nothing for a walk to move
  • 2026-10-08 19:54 published → delivered (done): nothing for a walk to move

The commit's note under refs/notes/mesh-plan keeps every transition: git log --notes=mesh-plan.

<!-- mesh-delivery:view --> **Delivery** `novox/mesh-lab@06fa70d081fc` — **delivered** since 2026-10-08T19:54:56Z **Delivery plan** — builds nothing: the change touches no module of the mesh's graph **Transitions** - 2026-10-08 19:52 (new) → proposed (announced): novox/mesh-lab#72's head announced - 2026-10-08 19:52 proposed → checked (checked): the verdict names this commit - 2026-10-08 19:52 checked → ready (accepted): the gate passed or warned, and the repository's own check did not fail - 2026-10-08 19:54 ready → published (merged): on the trunk its modules follow: merged there, and its walk opened — or nothing for a walk to move - 2026-10-08 19:54 published → delivered (done): nothing for a walk to move The commit's note under `refs/notes/mesh-plan` keeps every transition: `git log --notes=mesh-plan`.
jschoubben added 1 commit 2026-10-08 19:52:21 +00:00
Register R335, so a passed gate failed by later reports fails before a core merge
mesh/merge-gate pass: the change touches no module of the mesh's graph
mesh/repo-check pass: its merge-check.sh passed, each part in its toolchain: merge-check.sh (typescript), replays/merge-check.sh (go)
mesh/delivery delivered
06fa70d081
hq issue 335: a build that passed its gate was failed and put back when the
first machine's later reports went quiet. Proved: fails on 8170fc5^1,
passes on 8170fc5.
jschoubben force-pushed replays/335-a-passed-gate-is-kept from 4928774650 to 06fa70d081 2026-10-08 19:52:21 +00:00 Compare
mesh-admin merged commit aaca73afb2 into main 2026-10-08 19:54:35 +00:00
mesh-admin deleted branch replays/335-a-passed-gate-is-kept 2026-10-08 19:54:35 +00:00
Sign in to join this conversation.
No Reviewers
No labels
2 Participants
Notifications
Due Date
No due date set.
Dependencies

No dependencies set.

Reference: novox/mesh-lab#72