Record a merge through the merge gate (issue 1966, bootstrap) #4

Merged
mesh-tools merged 1 commits from fix/1966-gate-record into main 2026-11-07 20:19:56 +00:00
Member

An empty commit merged through the merge gate, so the new indexer reads mesh-connectivity-contracts' seat definitions on its merge (its seat list is empty, and the hand read hangs on mesh-hand-acts). The operator's bootstrap by hand, 2026-11-07. No file changes.

Reviewed-by: lead-47@shanks at 45d143192b (empty commit, no diff)

An empty commit merged through the merge gate, so the new indexer reads mesh-connectivity-contracts' seat definitions on its merge (its seat list is empty, and the hand read hangs on mesh-hand-acts). The operator's bootstrap by hand, 2026-11-07. No file changes. Reviewed-by: lead-47@shanks at 45d143192b3667f6414299a6e58db13d83775122 (empty commit, no diff)
mesh-tools added 1 commit 2026-11-07 20:14:22 +00:00
Record a merge through the merge gate so the new indexer reads this repository's seat definitions on its merge (issue 1966, the operator's bootstrap)
mesh/delivery merged: source.main moved to novox/mesh-networking@f0ec726e7ffc
mesh/delivery-group group fix/1966-gate-record merged: every member is merged
mesh/check checking 45d143192b36 on f0ec726e7ffc
45d143192b
Author
Member

Delivery novox/mesh-networking@45d143192b36 — merged since 2026-11-07T20:19:59Z

Source — source.main moved to novox/mesh-networking@f0ec726e7f. Whether it reached the machines is mesh-delivery-view's, derived from source.main, the wants and the haves.

Group fix/1966-gate-record: novox/mesh-contracts@1aa5dee992, novox/mesh-networking@45d143192b

  • composed together: pass — the checker's verdict at the members' heads (c1fb3b78bb25)

Transitions

  • 2026-11-07 20:14 (new) → proposed (announced): novox/mesh-networking#4's head announced
  • 2026-11-07 20:14 proposed → ready (accepted): a verdict names this commit and the trunk's head as its trunk commit, the gate passed or warned, and the repository's own check did not fail; or the check gates no merge (check-gates-merge false)
  • 2026-11-07 20:19 ready → merged (merged): on the trunk its modules follow: merged there

The commit's note under refs/notes/mesh-plan keeps every transition of this change up to its merge: git log --notes=mesh-plan.

<!-- mesh-delivery:view --> **Delivery** `novox/mesh-networking@45d143192b36` — **merged** since 2026-11-07T20:19:59Z **Source** — source.main moved to novox/mesh-networking@f0ec726e7ffc. Whether it reached the machines is `mesh-delivery-view`'s, derived from `source.main`, the wants and the haves. **Group** `fix/1966-gate-record`: novox/mesh-contracts@1aa5dee99226, novox/mesh-networking@45d143192b36 - composed together: pass — the checker's verdict at the members' heads (c1fb3b78bb25) **Transitions** - 2026-11-07 20:14 (new) → proposed (announced): novox/mesh-networking#4's head announced - 2026-11-07 20:14 proposed → ready (accepted): a verdict names this commit and the trunk's head as its trunk commit, the gate passed or warned, and the repository's own check did not fail; or the check gates no merge (check-gates-merge false) - 2026-11-07 20:19 ready → merged (merged): on the trunk its modules follow: merged there The commit's note under `refs/notes/mesh-plan` keeps every transition of this change up to its merge: `git log --notes=mesh-plan`.
mesh-tools merged commit f0ec726e7f into main 2026-11-07 20:19:56 +00:00
mesh-tools deleted branch fix/1966-gate-record 2026-11-07 20:19:57 +00:00
Sign in to join this conversation.
No Reviewers
No labels
1 Participants
Notifications
Due Date
No due date set.
Dependencies

No dependencies set.

Reference: novox/mesh-networking#4