Main reverted G's half merge (#189, reverted by 8afc3eb in #191) and then took the reader release's S1-S5, which
copied G's code. G's form holds where they differ (process_bus.go, seats.go, state.go and their tests); the
release's kept names stay so main's callers keep building: SeatViewPrefix beside SeatReadPrefix, and QueueInvoke's
empty strings on not-ok (with its test TestQueueInvoke). The tree differs from G's head f30dee54 only by those and
the release's two tests (objects cap option, seat states and stream kinds).
Builds: design 47 G (the milestone's sdk part, as at f30dee54)
Claude-Session: https://claude.ai/code/session_01NcbgfGKaxw984XyAPfLm4h
mesh/check being carried to 8afc3ebdf371 on 93e0a7b50d90 | from 27da949140c6
The group feat/47-G-join11 merged 3 of 17 members on 2026-11-13; G's mesh-sdk alone on main breaks 25 trunk
modules. The operator chose to put the order right: a reader release first, then G whole. This restores main
to 8fbba810 exactly.
Claude-Session: https://claude.ai/code/session_01NcbgfGKaxw984XyAPfLm4h
seatdef.Resolve, which the seat generator and every reader of a definition go
through, makes each marked verb by-caller and adds the event gated-ended
(gated-ended.<caller>.<call>, kept last per subject one day) and the verb
approvals (class read); the seat files stay as written. approvals is the
gate's verb, so CanHold asks no holder to name it.
Builds: design 47 G §677, §697; lead answers A-264, A-265, A-266
Claude-Session: https://claude.ai/code/session_01NcbgfGKaxw984XyAPfLm4h
catalogue.Verb gains NeedsApproval, copied by SeatsFromDefinitions from the
definition's verb, so the manifest validator and every reader of the seat
list read a verb's mark from one place. Compiled only, never read from a
manifest's own verb.
Builds: design 46 7-approval-mark §2, §4; lead answer A-177
Claude-Session: https://claude.ai/code/session_01NcbgfGKaxw984XyAPfLm4h
catalogue's compiled set is read from git.novox.be/novox/mesh-contracts/go/seats; the hand-written seat literal and its
verb builders go. The bar's block keeps its checks as code beside the data. A case of the seat set's test holds the
generated set equal, entry for entry, to the list compiled at 5a38a12 (testdata), but for the whole seats' additions
and the vault's two verbs; the three new registry seats are the only new entries. A holder of mesh-broker now serves its
eight verbs.
SDK-12: the vault's seat no longer promises accept and move-asks, which no holder served and nothing called; retire is
optional (design 32). The intake and move rows join one table; the move's own test goes with the two verbs.
Requires mesh-contracts (no version on the forge yet: a go.work, uncommitted, uses the sibling worktree until the
group pins it).
Claude-Session: https://claude.ai/code/session_01JG73KJNrH5EgFXMKKYSrig
The controller ended by its unassignment (ADR 0590), so its seat, the grants seat's lease write and
hand-back and placement's take-over from it serve nothing. The dependence check becomes strict
(clause 5): a read of the lease, a claim, a require or the module itself is refused like any other
declaration. held and artifacts-gone are the artifact sweep seat's (ADR 0571 §2). Issue 1126 B1, B2.
Claude-Session: https://claude.ai/code/session_01NcbgfJ9Gum47zkFKWRaovL
Lead's decision on milestone point 7 (a progressive insight of ADR 0587 §3): mesh-enrolment builds the joining
node's first tunnel at issue and passes it to the vault's enrolment-token as `tunnel`, an object of hub_key,
hub_endpoint and address, each required; the vault puts it in the token (delivery.TokenTunnel). Tested as a row of
TestTheVaultsSeatPromisesItsIntakeVerbs; no new test function (1438 unit tests).
(issue 774, review round 1)
Claude-Session: https://claude.ai/code/session_01NcbgfJ9Gum47zkFKWRaovL
mesh/check failed: the composition: the composer of the mesh-sdk mesh-controller at bdb8193456e17c9df59215c7f3e69a83a2e5a262 pins did not run: failed …
main's mesh-compose is the composer command (ADR 0482 clause 4) and keeps its name, which composer.Package and the
build steps name; feat/r6's hand path tool, which composes one module for one node and signs it with the operator's key
(ADR 0539 clause 10), moves to cmd/mesh-hand-compose.
With no delivery plan nothing starts, stops, retries or reads one; each removed verb stays a row with no input so a
caller is told its replacement, optional on the delivery seat so the gate of before and of release 6 both hold it
(ADR 0539 clauses 15, 17 and 18).
mesh/delivery covered after its stop: a later walk that contains it was delivered: plan-1792875397682979170 (novox/mesh-sdk at 312878be into main, done, …
mesh/check pass 34f210e5eba1 on e1f393bbb12e | unit 202 run, 3523 kept | integration 2223 run, 2682 kept, 7 skipped | over bound: unit, integration (s…
The store's nightly collector deletes every bare blob no manifest names, and a done key the controller never took in holds
nothing: node-tools, mesh-host and the forge bridge kept done keys naming blobs that answer 404. held lets the builder ask
before it reuses a key; artifacts-gone is said when a take-in finds a gone blob. delivery/held.go is the shared contract.
build, rebuild, forget-checks and delivery-plan stay listed, refused by name; replay
is a dry run only; delivery-check asks nothing; try is the checker's.