Mark the runner's three duration settings read at its runtime

drain-bound, kept-call-pace-first and kept-call-pace-max are placed in no file: the process reads
them from MESH_CONFIG_<KEY>, so each is marked "runtime": true, which the manifest validator asks.

Builds: design 47 H2 §775, §813 (12), H-A-370
This commit is contained in:
2026-11-22 00:36:28 +01:00
parent ec3fe34afc
commit b8a30b2bc7
+3
View File
@@ -42,18 +42,21 @@
"type": "string",
"description": "how long the tool runner, once told to stop, finishes the calls in flight before it cuts them and stops its bundles, a Go duration such as 30s (design 47 H2 §813 (12), H-A-377).",
"trusted": false,
"runtime": true,
"default": "30s"
},
"kept-call-pace-first": {
"type": "string",
"description": "how long the tool runner's kept call waits after its first transport fault before it calls again, doubling to kept-call-pace-max, a Go duration such as 1s (design 47 H2 §775).",
"trusted": false,
"runtime": true,
"default": "1s"
},
"kept-call-pace-max": {
"type": "string",
"description": "the longest wait of the tool runner's kept call between two calls, a Go duration such as 30s (design 47 H2 §775).",
"trusted": false,
"runtime": true,
"default": "30s"
}
},