novox/hq issue 289. A controller that is being replaced now refuses a call it cannot serve with {"error": …, "retry": "handing-over"}, and the controller after it answers the same call (mesh-controller PR on the same branch name).
bus.Conn.Ask is used by the console, callTool and a module's AskAs. On that mark it waits HandoverPause (3s, which covers the supervisor's restart) and asks once more. An unmarked refusal is final, as before. A second handover refusal is reported ("asked twice … both times refused as a handover") and is not asked a third time.
Test: TestAHandoverRefusalIsAskedOnceMore covers all three cases on a bus of its own (meshtest.URL).
mesh-controller check-here: merge-gate PASS (4 of 4 compose), repo-check PASS. internal/console and internal/runtime are skipped there, as always (they need node and @novox/mesh-sdk). The change is in internal/bus, which is tested.
novox/hq issue 289. A controller that is being replaced now refuses a call it cannot serve with `{"error": …, "retry": "handing-over"}`, and the controller after it answers the same call (mesh-controller PR on the same branch name).
`bus.Conn.Ask` is used by the console, `callTool` and a module's `AskAs`. On that mark it waits `HandoverPause` (3s, which covers the supervisor's restart) and asks once more. An unmarked refusal is final, as before. A second handover refusal is reported ("asked twice … both times refused as a handover") and is not asked a third time.
Test: `TestAHandoverRefusalIsAskedOnceMore` covers all three cases on a bus of its own (meshtest.URL).
`mesh-controller check-here`: merge-gate PASS (4 of 4 compose), repo-check PASS. internal/console and internal/runtime are skipped there, as always (they need node and @novox/mesh-sdk). The change is in internal/bus, which is tested.
mesh/merge-gate pass: builds mesh-tools, node-tools → ace, g14, novox, shanks; no bus step; every machine composes with the change as it did without (4 of …
node-tools on ace: passed — healthy 3 times over 2m17s
node-tools on the rest running it: sent
Transitions
2026-10-07 00:27 (new) → proposed (announced): novox/mesh-tools#20's head announced
2026-10-07 00:30 proposed → checked (checked): the verdict names this commit
2026-10-07 00:30 checked → ready (accepted): the gate passed or warned, and the repository's own check did not fail
2026-10-07 00:40 ready → published (merged): on the trunk its modules follow: merged there, and its walk opened — or nothing for a walk to move
2026-10-07 00:40 published → delivering (go): its walk started: let go by this owner in its group's order, by a person, or on the controller's own path
2026-10-07 00:44 delivering → delivered (done): its walk is done: every machine of its deploy plan passed, or was left as its policy says
The commit's note under refs/notes/mesh-plan keeps every transition: git log --notes=mesh-plan.
<!-- mesh-delivery:view -->
**Delivery** `novox/mesh-tools@2f045e042f25` — **delivered** since 2026-10-07T00:44:03Z
**Delivery plan** — builds mesh-tools, node-tools → ace, g14, novox, shanks; no bus step
- tier 0: mesh-tools, node-tools
- ace: receives node-tools
- g14: receives node-tools
- novox: receives node-tools
- shanks: receives node-tools
- node-tools provides mcp-endpoint: its consumers are sent again after it
**Group** `fix/a-verb-survives-the-handover`, in order:
- novox/mesh-controller@9409bcec4b38 before novox/mesh-host@4b23bed3251b: built by
- novox/mesh-controller@9409bcec4b38 before novox/mesh-tools@2f045e042f25: built by
- novox/mesh-host@4b23bed3251b before novox/mesh-controller@9409bcec4b38: engine before controller
**Machines**
- mesh-tools on every machine running it: sent
- node-tools on ace: passed — healthy 3 times over 2m17s
- node-tools on the rest running it: sent
**Transitions**
- 2026-10-07 00:27 (new) → proposed (announced): novox/mesh-tools#20's head announced
- 2026-10-07 00:30 proposed → checked (checked): the verdict names this commit
- 2026-10-07 00:30 checked → ready (accepted): the gate passed or warned, and the repository's own check did not fail
- 2026-10-07 00:40 ready → published (merged): on the trunk its modules follow: merged there, and its walk opened — or nothing for a walk to move
- 2026-10-07 00:40 published → delivering (go): its walk started: let go by this owner in its group's order, by a person, or on the controller's own path
- 2026-10-07 00:44 delivering → delivered (done): its walk is done: every machine of its deploy plan passed, or was left as its policy says
The commit's note under `refs/notes/mesh-plan` keeps every transition: `git log --notes=mesh-plan`.
mesh/merge-gate: PASS — every machine composes with the change as it did without (4 of 4 compose) (modules: mesh-tools, node-tools)
mesh/repo-check: PASS — its merge-check.sh passed
Change plan — builds mesh-tools, node-tools → ace, g14, novox, shanks; no bus step
tier 0: mesh-tools, node-tools
ace: receives node-tools
g14: receives node-tools
novox: receives node-tools
shanks: receives node-tools
node-tools provides mcp-endpoint: its consumers are sent again after it
Run by the build seat on shanks as build-1791332873846410259 (builds --log build-1791332873846410259).
--- the gate: mesh-tools, node-tools
mesh-tools: ok
node-tools: ok, invokes every tool
2 manifest(s) checked. Judged against the seats this binary carries; a claim on one of the mesh's own seats is judged fully at registration, and a seat declared by a module not given here reads as unknown. Identities judged on a 6-character machine name, against the bounds of the providers given here
judging 0 module(s) changed against 4 machine(s), as the snapshot of 2026-10-07T00:21:01Z says they run
composing every machine as the mesh is
the bus's user list leaves out 5 user(s) the mesh has minted no credential for: controller, node.f35, node.idt, node.ygcyr, node.yvbpsm. Each is a user that cannot connect until one is issued
the bus's user list leaves out 5 user(s) the mesh has minted no credential for: controller, node.f35, node.idt, node.ygcyr, node.yvbpsm. Each is a user that cannot connect until one is issued
composing every machine with the change
the bus's user list leaves out 5 user(s) the mesh has minted no credential for: controller, node.f35, node.idt, node.ygcyr, node.yvbpsm. Each is a user that cannot connect until one is issued
the bus's user list leaves out 5 user(s) the mesh has minted no credential for: controller, node.f35, node.idt, node.ygcyr, node.yvbpsm. Each is a user that cannot connect until one is issued
merge gate: PASS — every machine composes with the change as it did without (4 of 4 compose)
judged by controller development build against the facts of 2026-10-07T00:21:01Z
machines:
- a machine (f35): composes
- holds mesh-dns-resolver (idt): composes
- holds git, holds mesh-artifact-store, holds mesh-broker, holds mesh-catalog, holds mesh-dns-resolver, holds mesh-store, holds mesh-vault, holds npm-package-registry, the control node, the hub (ygcyr): composes
- a machine (yvbpsm): composes
a merge would rebuild 2 module(s) in 1 tier(s): mesh-tools, node-tools
--- its merge-check.sh (go toolchain)
NOT TESTED HERE: internal/runtime and internal/console launch bundles that need node and @novox/mesh-sdk
? github.com/novox/mesh-tools/node-tools/cmd/node-tools [no test files]
ok github.com/novox/mesh-tools/node-tools/internal/alive 1.190s
ok github.com/novox/mesh-tools/node-tools/internal/announce 4.368s
ok github.com/novox/mesh-tools/node-tools/internal/bus 1.367s
ok github.com/novox/mesh-tools/node-tools/internal/launch 1.045s
ok github.com/novox/mesh-tools/node-tools/internal/meshtest 1.129s
? github.com/novox/mesh-tools/node-tools/internal/wire [no test files]
NOT TESTED HERE: node-tools/src (TypeScript) needs @novox/mesh-sdk from the package registry
**Merge check** at `2f045e04`
- `mesh/merge-gate`: **PASS** — every machine composes with the change as it did without (4 of 4 compose) (modules: mesh-tools, node-tools)
- `mesh/repo-check`: **PASS** — its merge-check.sh passed
**Change plan** — builds mesh-tools, node-tools → ace, g14, novox, shanks; no bus step
- tier 0: mesh-tools, node-tools
- ace: receives node-tools
- g14: receives node-tools
- novox: receives node-tools
- shanks: receives node-tools
- node-tools provides mcp-endpoint: its consumers are sent again after it
Run by the build seat on shanks as `build-1791332873846410259` (`builds --log build-1791332873846410259`).
```
--- the gate: mesh-tools, node-tools
mesh-tools: ok
node-tools: ok, invokes every tool
2 manifest(s) checked. Judged against the seats this binary carries; a claim on one of the mesh's own seats is judged fully at registration, and a seat declared by a module not given here reads as unknown. Identities judged on a 6-character machine name, against the bounds of the providers given here
judging 0 module(s) changed against 4 machine(s), as the snapshot of 2026-10-07T00:21:01Z says they run
composing every machine as the mesh is
the bus's user list leaves out 5 user(s) the mesh has minted no credential for: controller, node.f35, node.idt, node.ygcyr, node.yvbpsm. Each is a user that cannot connect until one is issued
the bus's user list leaves out 5 user(s) the mesh has minted no credential for: controller, node.f35, node.idt, node.ygcyr, node.yvbpsm. Each is a user that cannot connect until one is issued
composing every machine with the change
the bus's user list leaves out 5 user(s) the mesh has minted no credential for: controller, node.f35, node.idt, node.ygcyr, node.yvbpsm. Each is a user that cannot connect until one is issued
the bus's user list leaves out 5 user(s) the mesh has minted no credential for: controller, node.f35, node.idt, node.ygcyr, node.yvbpsm. Each is a user that cannot connect until one is issued
merge gate: PASS — every machine composes with the change as it did without (4 of 4 compose)
judged by controller development build against the facts of 2026-10-07T00:21:01Z
machines:
- a machine (f35): composes
- holds mesh-dns-resolver (idt): composes
- holds git, holds mesh-artifact-store, holds mesh-broker, holds mesh-catalog, holds mesh-dns-resolver, holds mesh-store, holds mesh-vault, holds npm-package-registry, the control node, the hub (ygcyr): composes
- a machine (yvbpsm): composes
a merge would rebuild 2 module(s) in 1 tier(s): mesh-tools, node-tools
--- its merge-check.sh (go toolchain)
NOT TESTED HERE: internal/runtime and internal/console launch bundles that need node and @novox/mesh-sdk
? github.com/novox/mesh-tools/node-tools/cmd/node-tools [no test files]
ok github.com/novox/mesh-tools/node-tools/internal/alive 1.190s
ok github.com/novox/mesh-tools/node-tools/internal/announce 4.368s
ok github.com/novox/mesh-tools/node-tools/internal/bus 1.367s
ok github.com/novox/mesh-tools/node-tools/internal/launch 1.045s
ok github.com/novox/mesh-tools/node-tools/internal/meshtest 1.129s
? github.com/novox/mesh-tools/node-tools/internal/wire [no test files]
NOT TESTED HERE: node-tools/src (TypeScript) needs @novox/mesh-sdk from the package registry
```
Blocking a user prevents them from interacting with repositories, such as opening or commenting on pull requests or issues. Learn more about blocking a user.
novox/hq issue 289. A controller that is being replaced now refuses a call it cannot serve with
{"error": …, "retry": "handing-over"}, and the controller after it answers the same call (mesh-controller PR on the same branch name).bus.Conn.Askis used by the console,callTooland a module'sAskAs. On that mark it waitsHandoverPause(3s, which covers the supervisor's restart) and asks once more. An unmarked refusal is final, as before. A second handover refusal is reported ("asked twice … both times refused as a handover") and is not asked a third time.Test:
TestAHandoverRefusalIsAskedOnceMorecovers all three cases on a bus of its own (meshtest.URL).mesh-controller check-here: merge-gate PASS (4 of 4 compose), repo-check PASS. internal/console and internal/runtime are skipped there, as always (they need node and @novox/mesh-sdk). The change is in internal/bus, which is tested.Delivery
novox/mesh-tools@2f045e042f25— delivered since 2026-10-07T00:44:03ZDelivery plan — builds mesh-tools, node-tools → ace, g14, novox, shanks; no bus step
Group
fix/a-verb-survives-the-handover, in order:Machines
Transitions
The commit's note under
refs/notes/mesh-plankeeps every transition:git log --notes=mesh-plan.Merge check at
2f045e04mesh/merge-gate: PASS — every machine composes with the change as it did without (4 of 4 compose) (modules: mesh-tools, node-tools)mesh/repo-check: PASS — its merge-check.sh passedChange plan — builds mesh-tools, node-tools → ace, g14, novox, shanks; no bus step
Run by the build seat on shanks as
build-1791332873846410259(builds --log build-1791332873846410259).