node-tools without the controller's paging and handover reads (issue 1126 group B) #55

Merged
mesh-tools merged 4 commits from feat/1126-removal into main 2026-11-02 13:41:44 +00:00
Member

Issue 1126 (remove the controller), delivery group feat/1126-removal: mesh-sdk, mesh-delivery, mesh-catalog, mesh-host, mesh-tools, mesh-networking. Decision: ADR 0590 (the controller ends by its unassignment; each sensitive vault verb judges its own caller). Also folds in mesh-catalog #593's commits and the fixes of issues 1748, 1926, 1930.

Tests: offline untagged suites of every module against mesh-sdk abf5eac, go vet -tags integration, the bus removal integration test; see the review record.

Reviewed-by: review-1126@shanks at e475d9f849

https://claude.ai/code/session_01NcbgfJ9Gum47zkFKWRaovL

Issue 1126 (remove the controller), delivery group feat/1126-removal: mesh-sdk, mesh-delivery, mesh-catalog, mesh-host, mesh-tools, mesh-networking. Decision: ADR 0590 (the controller ends by its unassignment; each sensitive vault verb judges its own caller). Also folds in mesh-catalog #593's commits and the fixes of issues 1748, 1926, 1930. Tests: offline untagged suites of every module against mesh-sdk abf5eac, go vet -tags integration, the bus removal integration test; see the review record. Reviewed-by: review-1126@shanks at e475d9f849ca30a8201715b5dae03dad1cfd726b https://claude.ai/code/session_01NcbgfJ9Gum47zkFKWRaovL
mesh-tools added 4 commits 2026-11-02 11:31:23 +00:00
Claude-Session: https://claude.ai/code/session_01NcbgfJ9Gum47zkFKWRaovL
Every member builds against mesh-sdk 729a86b, the head of feat/1126-removal, so the group is checked as one contract.

Claude-Session: https://claude.ai/code/session_01NcbgfJ9Gum47zkFKWRaovL
Every member builds against mesh-sdk f569924, the head of feat/1126-removal, so the group is checked as one contract.

Claude-Session: https://claude.ai/code/session_01NcbgfJ9Gum47zkFKWRaovL
Pin mesh-sdk to the group head of issue 1126
mesh/delivery merged: source.main moved to novox/mesh-tools@d7d908cf67ae
mesh/delivery-group group feat/1126-removal merged: every member is merged
mesh/check checking e475d9f849ca on 49f9269376e3 | novox/mesh-tools#55 in group feat/1126-removal
e475d9f849
Every member builds against mesh-sdk abf5eac, the head of feat/1126-removal, so the group is checked as one contract.

Claude-Session: https://claude.ai/code/session_01NcbgfJ9Gum47zkFKWRaovL
Author
Member

Delivery novox/mesh-tools@e475d9f849ca — merged since 2026-11-02T13:41:47Z

Source — source.main moved to novox/mesh-tools@d7d908cf67. Whether it reached the machines is mesh-delivery-view's, derived from source.main, the wants and the haves.

Group feat/1126-removal: novox/mesh-catalog@fa6dc3a48b, novox/mesh-delivery@e2cb398186, novox/mesh-host@049c3b8c11, novox/mesh-sdk@abf5eace77, novox/mesh-tools@e475d9f849

  • composed together: pass — the checker's verdict at the members' heads (f929346c4b40)

Transitions

  • 2026-11-02 11:31 (new) → proposed (announced): novox/mesh-tools#55's head announced
  • 2026-11-02 11:31 proposed → ready (accepted): a verdict names this commit and the trunk's head as its trunk commit, the gate passed or warned, and the repository's own check did not fail; or the check gates no merge (check-gates-merge false)
  • 2026-11-02 13:41 ready → merged (merged): on the trunk its modules follow: merged there

The commit's note under refs/notes/mesh-plan keeps every transition of this change up to its merge: git log --notes=mesh-plan.

<!-- mesh-delivery:view --> **Delivery** `novox/mesh-tools@e475d9f849ca` — **merged** since 2026-11-02T13:41:47Z **Source** — source.main moved to novox/mesh-tools@d7d908cf67ae. Whether it reached the machines is `mesh-delivery-view`'s, derived from `source.main`, the wants and the haves. **Group** `feat/1126-removal`: novox/mesh-catalog@fa6dc3a48b0c, novox/mesh-delivery@e2cb3981866e, novox/mesh-host@049c3b8c11c9, novox/mesh-sdk@abf5eace7791, novox/mesh-tools@e475d9f849ca - composed together: pass — the checker's verdict at the members' heads (f929346c4b40) **Transitions** - 2026-11-02 11:31 (new) → proposed (announced): novox/mesh-tools#55's head announced - 2026-11-02 11:31 proposed → ready (accepted): a verdict names this commit and the trunk's head as its trunk commit, the gate passed or warned, and the repository's own check did not fail; or the check gates no merge (check-gates-merge false) - 2026-11-02 13:41 ready → merged (merged): on the trunk its modules follow: merged there The commit's note under `refs/notes/mesh-plan` keeps every transition of this change up to its merge: `git log --notes=mesh-plan`.
Author
Member

mesh-delivery: the operator's Approve of this pull request's merge into main is ended: a head it covers moved on: the heads it covers are no longer the group's heads. Nothing is merged on it. The operator is asked again once the checks pass at the new head.

mesh-delivery: the operator's Approve of this pull request's merge into main is ended: a head it covers moved on: the heads it covers are no longer the group's heads. Nothing is merged on it. The operator is asked again once the checks pass at the new head.
Author
Member

mesh-delivery: the operator's Approve of this pull request's merge into main is ended: a head it covers moved on: the heads it covers are no longer the group's heads. Nothing is merged on it. The operator is asked again once the checks pass at the new head.

mesh-delivery: the operator's Approve of this pull request's merge into main is ended: a head it covers moved on: the heads it covers are no longer the group's heads. Nothing is merged on it. The operator is asked again once the checks pass at the new head.
Author
Member

mesh-delivery: the operator's Approve of this pull request's merge into main is ended: a head it covers moved on: the heads it covers are no longer the group's heads. Nothing is merged on it. The operator is asked again once the checks pass at the new head.

mesh-delivery: the operator's Approve of this pull request's merge into main is ended: a head it covers moved on: the heads it covers are no longer the group's heads. Nothing is merged on it. The operator is asked again once the checks pass at the new head.
mesh-tools merged commit d7d908cf67 into main 2026-11-02 13:41:44 +00:00
mesh-tools deleted branch feat/1126-removal 2026-11-02 13:41:45 +00:00
Sign in to join this conversation.
No Reviewers
1 Participants
Notifications
Due Date
No due date set.
Dependencies

No dependencies set.

Reference: novox/mesh-tools#55