merge-check.sh (TypeScript toolchain): production dependencies from the lock file, the server parsed; the server is not started (fixed port), and there are no tests. Tested emulated: passes.
`merge-check.sh` (TypeScript toolchain): production dependencies from the lock file, the server parsed; the server is not started (fixed port), and there are no tests. Tested emulated: passes.
The repository's layer of the mesh's merge check (mesh/repo-check): the image's install
from the lock file and the server parsed; what cannot run is said.
Deliveryjschoubben/txt-game@e1c3ed224e90 — delivered since 2026-10-06T23:05:28Z
Machines
txt-game on ace: passed — healthy 3 times over 4m25s
txt-game on the rest running it: sent
Transitions
2026-10-06 23:05 (new) → proposed (announced): jschoubben/txt-game#6 merged; its head was not heard by this owner, so it is made from the forge's word
2026-10-06 23:05 proposed → held (merged-unchecked): merged without a passing check — a verdict known with it is taken first: only a person decides that it goes on
2026-10-06 23:05 held → delivering (go): its walk started on a word that was not this owner's: the controller's own path, which waits for nobody, or a person's plans go
2026-10-06 23:05 delivering → delivered (done): its walk is done: every machine of its deploy plan passed, or was left as its policy says
The commit's note under refs/notes/mesh-plan keeps every transition: git log --notes=mesh-plan.
<!-- mesh-delivery:view -->
**Delivery** `jschoubben/txt-game@e1c3ed224e90` — **delivered** since 2026-10-06T23:05:28Z
**Machines**
- txt-game on ace: passed — healthy 3 times over 4m25s
- txt-game on the rest running it: sent
**Transitions**
- 2026-10-06 23:05 (new) → proposed (announced): jschoubben/txt-game#6 merged; its head was not heard by this owner, so it is made from the forge's word
- 2026-10-06 23:05 proposed → held (merged-unchecked): merged without a passing check — a verdict known with it is taken first: only a person decides that it goes on
- 2026-10-06 23:05 held → delivering (go): its walk started on a word that was not this owner's: the controller's own path, which waits for nobody, or a person's `plans go`
- 2026-10-06 23:05 delivering → delivered (done): its walk is done: every machine of its deploy plan passed, or was left as its policy says
The commit's note under `refs/notes/mesh-plan` keeps every transition: `git log --notes=mesh-plan`.
Blocking a user prevents them from interacting with repositories, such as opening or commenting on pull requests or issues. Learn more about blocking a user.
merge-check.sh(TypeScript toolchain): production dependencies from the lock file, the server parsed; the server is not started (fixed port), and there are no tests. Tested emulated: passes.Delivery
jschoubben/txt-game@e1c3ed224e90— delivered since 2026-10-06T23:05:28ZMachines
Transitions
plans goThe commit's note under
refs/notes/mesh-plankeeps every transition:git log --notes=mesh-plan.