Design 47 H: section 10, finding 138
This commit is contained in:
@@ -654,3 +654,4 @@ Added by the lead at 21:30 CET, from the run of 19:50 to 21:30; a row met again
|
||||
| Proof 1 (its second run) is shown: the wallpaper file on the desktop and the build node carries the merged line, read at 12:26. The chain: merged at 11:07:56, taken in at 11:10:47, placed at 11:48:00, passed at 11:49:06, the want written at 11:54:21, the node-engines applied it within a minute, the provisioner's plan named the new files archive at about 12:23 once a current provisioner ran, and the file was written by 12:26. No hand act touched the module's own path; the hand acts were on the delivery system's parts (the assigner on the build node, the cancel of the held pipeline, the provisioner). The time from merge to running was 78 minutes, 37 of them in the queue and 30 waiting on a stale provisioner, so ADR 0282's five minutes is not met (rows 111, 127, 128 and 133); the runbook. | H1 (the proof); H2 (the bound) |
|
||||
| Proof 2 began: the SDK's one-line change and the tool runner's were merged in one call at 12:26:59 (the seat git's merge verb with two members), the gate moved main's source to one revision for both repositories, and the indexer took both in together at 12:27:18 as one pipeline of 126 movers, the SDK and the tool runner among them (the SDK's release re-pins every importer); the pipeline waits fifth in the queue (rows 127 and 135). The acceptance: the tool runner runs on every machine at the new SDK version with no hand act; the gate, the indexer (`mesh-delivery-indexer`) and the pipeline runner (`mesh-delivery-pipeline`). Owed: a tool that reads one pipeline's movers, with the lighter read per step (row 124's kind). | H1 |
|
||||
| The change of the holder of the seat mesh-wants for row 131 was built, reviewed in two rounds and merged at 12:41 as its own pipeline; the first round found wants written at the start before any revision is kept, and the full-store verdict moved out of the pass, both settled by H-A-261 (no want before a revision is kept; the full-store verdict is the pass's own); the holder of the seat mesh-wants (`mesh-delivery-assigner`). The reviewer's notes stay owed: the bus wrappers' race on one handle, met twice (a handle per goroutine, or a guard in the SDK), and a failed first keeping holding the wants until the next event. Also seen: with the pipeline runner's change live, the waiting pipelines collapsed as designed at 12:38 (three left the queue, their movers moved by the newest), so proof 2's pipeline stands next after the one running (rows 130, 131 and 136). | H1 (the change); H2 (the notes) |
|
||||
| The pipeline ahead of proof 2 (774 steps) made no step the pipeline runner said from 12:42: four contracts modules added to their repository after the registrations' seed of 2026-11-14 were never registered (the seed writes only when no registration is held, and nothing registers a module that enters the module graph later), so their steps waited on a registration nobody had asked, with no bound and no finding (rows 112 and 136); the indexer (`mesh-delivery-indexer`) and the pipeline runner (`mesh-delivery-pipeline`). The build seats were in fact working the other movers while the usage view said none, because it judges a build module by the node-engine's held phase rather than its running asks. The recovery: the four were registered by the register verb, each an Approve on the operator's channel. Settled by H-A-262 (the indexer registers a module the moment it enters a watched trunk's module graph, with no ask, saying registration-changed; the runner raises the finding registration-missing while a mover waits on one), in build in the indexer and the runner. Owed: the usage view judges a build module by its running asks. | H1 (the fix); H2 (the view) |
|
||||
|
||||
Reference in New Issue
Block a user