Take in main up to 2cf1c64e24 (issue 1024)
mesh/merge-gate head 499407c66936 merged into trunk 2cf1c64e24f5 beside mesh-catalog#349@7104df6f — pass: the change touches no module of the mesh's graph
mesh/repo-check head 499407c66936 merged into trunk 2cf1c64e24f5 beside mesh-catalog#349@7104df6f — pass: its merge-check.sh passed
mesh/delivery delivered
mesh/delivery-group group feat/owned-paths delivered: every member is delivered
mesh/merge-gate head 499407c66936 merged into trunk 2cf1c64e24f5 beside mesh-catalog#349@7104df6f — pass: the change touches no module of the mesh's graph
mesh/repo-check head 499407c66936 merged into trunk 2cf1c64e24f5 beside mesh-catalog#349@7104df6f — pass: its merge-check.sh passed
mesh/delivery delivered
mesh/delivery-group group feat/owned-paths delivered: every member is delivered
hq main moved after this change's check; it touches neither design 29 nor anything this change edits. The branch's tree is the reviewed design 29 change merged with main.
This commit is contained in:
@@ -121,7 +121,10 @@ never into the running one, unless it blocks the running one.
|
||||
1. **Bring every feature branch up to the current trunk** (fetch by name, then merge), so the reviewed tree is
|
||||
the tree that is pushed.
|
||||
2. **One reviewer reads every repository's local commits** together, against the context files and the
|
||||
decisions. Its report is per repository: each finding as file:line, the failure it causes, and the fix.
|
||||
decisions. **It is one agent, kept for the whole release** like the fixing agents: the lead continues it by
|
||||
its id for every later round, for the extra cycle after a failed check (phase 3) and for the ready mark, so it
|
||||
reads the decisions, the issues, the context files and the commits once (issue 1042). A fresh reviewer per
|
||||
round or per mark pays for all of that again. Its report is per repository: each finding as file:line, the failure it causes, and the fix.
|
||||
It says which round it is in ("round 1 of at most 3").
|
||||
3. **The report goes to the same fixing agents** that wrote the code, continued by their ids, so they fix
|
||||
with the context they already hold. Each answers the reviewer: what it changed, per finding, or why not.
|
||||
@@ -142,7 +145,7 @@ never into the running one, unless it blocks the running one.
|
||||
reviewer first confirms that commit's tree equals the reviewed one.
|
||||
2. **The forge's merge checks run the integration tests once** (`mesh/merge-gate`, `mesh/repo-check`). No
|
||||
second review: phase 2 reviewed this tree.
|
||||
3. **A check that fails** goes back to the reviewer with the failure, for **one more cycle** of phase 2 with
|
||||
3. **A check that fails** goes back to the same reviewer, continued by its id, with the failure, for **one more cycle** of phase 2 with
|
||||
the same fixing agents; then push once again. **The failure is read from the check's whole log**, never
|
||||
reasoned from its summary: `mesh-delivery.show` names the check's build id, and `mesh-controller.builds` with
|
||||
`log` set to that id prints everything the builder said. A check's summary picks only some failing lines;
|
||||
@@ -153,7 +156,9 @@ never into the running one, unless it blocks the running one.
|
||||
carries an integration test that starts the module whole, its process against the real bus and store, and
|
||||
shows the milestone's acceptance sentence; the forge's checks run it (ADR 0391 §1, §6). Unit tests alone are not
|
||||
that proof; the mesh has no end-to-end tests yet, and the lab is not used (the operator, 2026-10-16).
|
||||
5. **The reviewer marks each pull request ready as soon as the acceptance is shown** with
|
||||
5. **The reviewer marks each pull request ready as soon as the acceptance is shown.** It does not wait for the
|
||||
checks itself: a watcher waits for them and wakes the lead, who continues the reviewer by its id to mark
|
||||
(issue 1042). It marks with
|
||||
`mesh-delivery.mark-ready` (the delivery of the head it approved, who reviewed it and why), which writes the
|
||||
label `mesh/ready` and then `ready at <full sha>`, the order the forge counts (issue 913); mesh-delivery merges it when its checks pass
|
||||
and the operator approved the merge into main on Telegram, the channel that proves who answered today (ADR 0364,
|
||||
@@ -182,7 +187,7 @@ survive.
|
||||
| The lead (phase 0 decisions, the context files, following and reporting) | larger | judgement |
|
||||
| Read-only questions about the code for the context files | smaller | reading, answered with file:line |
|
||||
| Fixing agents (phase 1, and the fixing in phases 2 and 3) | smaller | building to a written context |
|
||||
| The reviewer (phase 2, and the extra cycle in phase 3) | larger | judgement, once per round |
|
||||
| The reviewer (phase 2, the extra cycle in phase 3 and the ready mark; one agent, continued by its id) | larger | judgement, once per round |
|
||||
| Decision records | larger | judgement |
|
||||
|
||||
Every agent the mesh runs draws on one weekly allowance shared by every session, and the larger model
|
||||
@@ -272,8 +277,10 @@ moments, the same hour, an hq change going through [playbook 08](08-small-fixes.
|
||||
|
||||
- **The first milestone starts:** the design's `status: in-progress` ([playbook 04](04-build-handoff.md) step 7),
|
||||
if it is not already.
|
||||
- **A milestone's delivery plan is done:** its issues are resolved (phase 4), and the design's milestone entry says
|
||||
it is delivered, with the date.
|
||||
- **A milestone's delivery plan is done:** its issues are resolved (phase 4), with `fixed-by` naming its pull
|
||||
requests. The design's milestone entry is not changed: it names the milestone's issues, and whether they are
|
||||
delivered, when and by what is read from the issue tracker when it is asked, never copied into the design
|
||||
(issue 1038; AGENTS.md: cross-cutting views are generated when they are read).
|
||||
- **The building pauses with work left** (another design takes its turn, a hand-over, the session's end): the
|
||||
design stays `in-progress`, and each issue left gets a note with `issue-tracker.note` saying what it waits
|
||||
for and what comes after it ("built after design N is delivered, before design M"). The first issue of
|
||||
@@ -300,8 +307,9 @@ issues in `fixing` that nobody works on reads to the operator as stuck work.
|
||||
- A design whose milestone issues are partly resolved says `in-progress`, and one whose issues are all
|
||||
resolved and delivered says `implemented`: read its Milestones section against `issue-tracker.get` for each
|
||||
issue. A design that says `designed` with a resolved milestone issue is a state not written back.
|
||||
- A milestone whose issues are all resolved and delivered has the date in its entry in the design's Milestones
|
||||
section; an entry without it is a delivery not written back.
|
||||
- A design's Milestones section names each milestone's issues and nothing of their state: a "delivered", a date
|
||||
or a pull request in an entry is a copy of the tracker's state (issue 1038), read with
|
||||
`grep -n 'delivered' <design>` over its Milestones section.
|
||||
- Every open issue of a design that says `in-progress` and has no agent on it shows, in `issue-tracker.get`, a
|
||||
note saying what it waits for; one without such a note is a pause not written back.
|
||||
- The milestone issues in `fixing` (`issue-tracker.list`) belong to one design at most: milestone issues
|
||||
@@ -312,6 +320,8 @@ issues in `fixing` that nobody works on reads to the operator as stuck work.
|
||||
review rules; `issue-tracker.list` with `flag: abandoned` lists issues left in `fixing` with nobody on them.
|
||||
- A pull request reviewed and green but not marked ready for more than 15 minutes is a lead that did not
|
||||
mark it.
|
||||
- Every ready mark of a release names one reviewer (`mesh-delivery.show`, `ready.by`), and the lead's save point
|
||||
names one reviewer id per release; a second reviewer within one release is a reviewer not kept (issue 1042).
|
||||
- A milestone that adds or changes a module marked ready with no integration test that starts the module whole is
|
||||
the failure of phase 3's fourth step.
|
||||
- A bed run from `.work/<slug>/mesh-lab` that fails naming a `.work/<slug>/<repo>/…` path it cannot find is a
|
||||
|
||||
@@ -547,9 +547,9 @@ when the previous one's delivery is done.
|
||||
|
||||
| # | Outcome | Acceptance tests | Repositories | Issues |
|
||||
|---|---|---|---|---|
|
||||
| 1 | A merge during a running delivery is never dropped and needs no person's release; the merge window lives on the bus; a rollout that shares nothing with an open one runs beside it | 8, 9, 11 | mesh-controller | 973 (with the rest of 525); delivered 2026-10-17 (mesh-controller #366, #367) |
|
||||
| 2 | A ready mark is acted on within seconds, and each pull request has at most one waiting check | 5, 6, 7 | mesh-controller, mesh-catalog (mesh-delivery, gitea) | 974, 975, 976; delivered 2026-10-17 in one plan (mesh-controller #368, mesh-catalog #345) |
|
||||
| II | phase II: build-agent and route-proxy live whole in mesh-controller, in two releases under ADR 0420 (accepted 2026-10-17): release 1 has the controller accept a reviewed move and mesh-delivery announce each merge with its Approve; release 2 is the move | — | mesh-controller, mesh-catalog (mesh-delivery, build-agent, route-proxy) | release 1: 1025, delivered 2026-10-17 (mesh-controller #369, mesh-catalog #348); release 2: 1019 |
|
||||
| 1 | A merge during a running delivery is never dropped and needs no person's release; the merge window lives on the bus; a rollout that shares nothing with an open one runs beside it | 8, 9, 11 | mesh-controller | 973 (with the rest of 525) |
|
||||
| 2 | A ready mark is acted on within seconds, and each pull request has at most one waiting check | 5, 6, 7 | mesh-controller, mesh-catalog (mesh-delivery, gitea) | 974, 975, 976 |
|
||||
| II | phase II: build-agent and route-proxy live whole in mesh-controller, in two releases under ADR 0420 (accepted 2026-10-17): release 1 has the controller accept a reviewed move and mesh-delivery announce each merge with its Approve; release 2 is the move | — | mesh-controller, mesh-catalog (mesh-delivery, build-agent, route-proxy) | release 1: 1025; release 2: 1019 |
|
||||
| 3 | A feature with a new seat verb across the controller and the catalogue is one group, one batch, one delivery plan and one Approve: no order lines, no ready mark, each module built and sent once | 1, 6 | mesh-controller, mesh-catalog (mesh-delivery, gitea) | 977, 978, 1022; 605 (1021 closed as its duplicate) is resolved by this build (ADR 0419 §7) |
|
||||
| 4 | A delivery backs up the data it moves first, and a failed backup holds it and is said | 3 | mesh-controller, mesh-catalog (mesh-delivery, the backup seat's holder) | 980 |
|
||||
| 5 | One read of a module on a node names the commit, build and rollout that put it there | 10, 12 | mesh-controller, mesh-catalog (mesh-config, nats) | 981 |
|
||||
|
||||
@@ -339,14 +339,14 @@ retire the word (F4 left it off the *Not:* line for them), design 49 lists the C
|
||||
|
||||
## Milestones
|
||||
|
||||
Written back on 2026-10-17 (playbook 07, "The design's state is written back"): the packages above were built
|
||||
as one delivery, not milestone by milestone, so the milestones are what was delivered and what is left.
|
||||
The packages above were built as one delivery, not milestone by milestone; the milestones group them by what
|
||||
each makes true. Whether a milestone's issues are delivered is read from the issue tracker (playbook 07).
|
||||
|
||||
| # | Outcome | Packages | Issues | State |
|
||||
|---|---|---|---|---|
|
||||
| 1 | Config, provisioning, secrets, bindings, collections and runtime asks run the new way; the old forms are still accepted | every package but T6, B3, R1, R2 | 647, 650 to 679 but 659, 681, 684, 685 | merged into main and delivered on 2026-10-16; issues resolved |
|
||||
| 2 | The media catalogue and the applications carry their file text as templates | T6 | 659 | resolved; delivered on 2026-10-16 |
|
||||
| 3 | The other providers answer their consumers; the old forms are refused; the record says what runs | B3, R1, R2 | 680, 682, 683 | open: built after design 47's milestones are delivered and before design 58 starts (the operator, 2026-10-17; one design is built at a time, playbook 07) |
|
||||
| # | Outcome | Packages | Issues |
|
||||
|---|---|---|---|
|
||||
| 1 | Config, provisioning, secrets, bindings, collections and runtime asks run the new way; the old forms are still accepted | every package but T6, B3, R1, R2 | 647, 650 to 679 but 659, 681, 684, 685 |
|
||||
| 2 | The media catalogue and the applications carry their file text as templates | T6 | 659 |
|
||||
| 3 | The other providers answer their consumers; the old forms are refused; the record says what runs | B3, R1, R2 | 680, 682, 683 |
|
||||
|
||||
## What is deliberately not here
|
||||
|
||||
|
||||
Reference in New Issue
Block a user