Design 47: release 1-2 cut by the orders its prepare step found, with its new decisions and issues (issue 1130)
This commit is contained in:
@@ -4,6 +4,7 @@ status: in-progress
|
||||
code: [mesh-controller, mesh-catalog modules/mesh-delivery, mesh-delivery, mesh-host, mesh-sdk]
|
||||
updated: 2026-10-18
|
||||
decisions:
|
||||
- "ADR 0431"
|
||||
- "ADR 0429"
|
||||
- "ADR 0428"
|
||||
- "ADR 0426"
|
||||
@@ -619,13 +620,13 @@ release reports the controller's code lines against research 063's baseline (acc
|
||||
| 5 | One read of a module on a node names the commit, build and rollout that put it there | 10, 12 | mesh-controller, mesh-catalog (mesh-config, nats) | 981 |
|
||||
| 5b | Decided: building and delivering leave the controller for parts that watch and write keys in the repository `mesh-delivery`, landing in six releases (ADR 0429); the forge module makes that repository from its config, protected before any team reaches it (ADR 0428) | — (ADR 0429 names them: 13 to 20) | hq, mesh-catalog (gitea) | 1117, 1124, 1128 |
|
||||
| 6 | Folded into release 4 by ADR 0429 §10: installed toolchains, builders fetching over SSH with their own key, and an SDK change shipping with its users are built in the builder's new home, so the builder is changed once | (2, 4: proved by release 4) | — | 979, 971 (moved to release 4) |
|
||||
| R1–2 | The operator sees every module on every node, with its fingerprint, phase and health, in `mesh-delivery-cli` and its web view, and a part that stops moving is raised as a condition within two minutes without a timer | 13, 14 | mesh-delivery (view, watchman), the node-engine (`mesh-host`: have keys; its alive message deleted), mesh-sdk (key layouts), mesh-controller (its silence timers deleted), mesh-catalog (zsh's `nox-delivery`) | 1131 (key layouts), 1132 (have keys), 1136 (credentials), 1134 (the view), 1135 (the watchman), 1137 (the alias) |
|
||||
| R1–2 | The operator sees every module on every node, with its fingerprint, phase and health, in `mesh-delivery-cli` and its web view, and a part that stops moving is raised as a condition within two minutes without a timer | 13, 14 | mesh-delivery (view, watchman), the node-engine (`mesh-host`: have keys; its alive message deleted), mesh-sdk (key layouts), mesh-controller (its silence timers deleted), mesh-catalog (zsh's `nox-delivery`) | cut A: 1131 (key layouts); cut B, one group of the node-engine and mesh-controller: 1132 (have keys), 1142 (the node-engine's check, its tests half), 1136 (the have bucket and its grants), 1145 (a module and a build per resource), 1146 (a new repository's first module registered at its merge's Approve), 1147 (the bus's connect events for the watchman); cut C: 1134 (the view), 1137 (the alias, in the view's manifest); cut D: 1153 (the stuck keys), then 1135 (the watchman) and the alive message's deletion |
|
||||
| R3 | A group reaches the mesh as one source revision written by the gate, the operator's asks come through the teller and can be answered in the view, but for the merge's Approve, answered on the phone until its way in proves who answered (issue 953), and today's module mesh-delivery is split into its parts and ends | 15 | mesh-delivery (forge bridge, gate, teller, indexer), mesh-catalog (mesh-delivery split), mesh-sdk | opened when it is prepared |
|
||||
| R4 | The controller asks no build: a build is keyed by its fingerprint, so a merge builds nothing its check built; with milestone 6, toolchains are installed, builders fetch over SSH, and an SDK change ships with its users | 16, 2, 4 | mesh-delivery (builder, checker), mesh-controller (build dispatch deleted; build-agent leaves), mesh-catalog (build modules, ssh-client, gitea), mesh-sdk | 979, 971; the rest opened when it is prepared |
|
||||
| R5 | The assigner writes what each node should run by its six rules, compared with what the controller sends, and the view shows every difference | 17 | mesh-delivery (assigner), mesh-controller (grants keys) | opened when it is prepared |
|
||||
| R6 | Each node applies from its wants, a new version reaches the module's canary first and the rest once it is healthy there, and the plans are deleted from the code | 18, 19 | the node-engine (`mesh-host`: the node agent), mesh-controller (plans deleted), mesh-delivery (the gate's delivery states go) | opened when it is prepared |
|
||||
|
||||
The issues are linked `depends-on` in this order; 976 depends on 975, and 979 also on 971. In release 1-2, 1132 and 1136 depend on 1131, 1134 and 1135 on 1136, 1134 also on 1132 and 1128, and 1137 on 1134. Milestone 3's first live group (milestone 4's, on 2026-10-17) held one Approve but merged in two passes and went out in two delivery plans: a member's tests read the other member's repository, so the first merge made the second's verdict out of date, and a closed group never asked its composed verdict again (issues 1049, 1082). The operator put a fix of milestone 3 after milestone 4 and before milestone 5 on 2026-10-18; acceptance test 1 is proved again by it. The operator put milestone 5b after milestone 5 and before milestone 6 on 2026-10-18, as an issue rather than a research effort; where the planning goes is settled by a decision record before it is built (issue 1117), and milestone 6's build changes are read against it. Milestone 2b was
|
||||
The issues are linked `depends-on` in this order; 976 depends on 975, and 979 also on 971. In release 1-2, 1132 and 1136 depend on 1131, 1134 and 1135 on 1136, 1134 also on 1132 and 1128, and 1137 on 1134. Its prepare step on 2026-10-18 found three orders the cut had hidden, and the operator chose at 18:52 to cut it by them: an SDK change still ships before its users until release 4 (ADR 0429 §10), so the key layouts are cut A; a new repository's first module was registered only at the controller's terminal, so cut B also teaches the controller to register it at its merge's Approve (ADR 0432, proposed); and the bus had no system account, so the watchman could hear no connection open or close (ADR 0431, issue 1147). Release 2's other gaps (a bucket whose keys expire, a module raising a condition, the silent check without the alive message, a plan's wait for a report) are settled by ADR 0433, proposed, and built as cut D, its SDK part first. Milestone 3's first live group (milestone 4's, on 2026-10-17) held one Approve but merged in two passes and went out in two delivery plans: a member's tests read the other member's repository, so the first merge made the second's verdict out of date, and a closed group never asked its composed verdict again (issues 1049, 1082). The operator put a fix of milestone 3 after milestone 4 and before milestone 5 on 2026-10-18; acceptance test 1 is proved again by it. The operator put milestone 5b after milestone 5 and before milestone 6 on 2026-10-18, as an issue rather than a research effort; where the planning goes is settled by a decision record before it is built (issue 1117), and milestone 6's build changes are read against it. Milestone 2b was
|
||||
put before milestone 3 by the operator on 2026-10-17. Milestone 3 builds ADR 0418, ADR 0419 and ADR 0421
|
||||
(issues 977, 978 and 1022), and splits mesh-controller's unit tests from its integration tests (issue 895, the
|
||||
operator on 2026-10-17), so the unit level holds its bound of ADR 0391; the integration level's sixty seconds
|
||||
|
||||