Playbooks 04 and 07 after research 055: a milestone's shape from what-if; the Approve on every merge into main; when the two-step exception ends (issue 922)
mesh/merge-gate head 75d3ac0f8258 merged into trunk 73b9cc3257a1 — pass: the change touches no module of the mesh's graph
mesh/repo-check head 75d3ac0f8258 merged into trunk 73b9cc3257a1 — pass: its merge-check.sh passed
mesh/delivery superseded: a newer head of the same pull request
mesh/merge-gate head 75d3ac0f8258 merged into trunk 73b9cc3257a1 — pass: the change touches no module of the mesh's graph
mesh/repo-check head 75d3ac0f8258 merged into trunk 73b9cc3257a1 — pass: its merge-check.sh passed
mesh/delivery superseded: a newer head of the same pull request
This commit is contained in:
@@ -30,7 +30,8 @@ A design becomes **milestones**, and each milestone becomes **issues**:
|
||||
4. **Break it into milestones.** Write them into the design, in a section *Milestones*: for each, its number,
|
||||
its one-sentence outcome, the acceptance tests of the design it proves, the repositories it touches, and
|
||||
what it depends on. Order them so each is usable as soon as it is delivered, the smallest useful one
|
||||
first.
|
||||
first. A milestone is named by what it lets someone do; how it ships is shaped by the plan its changes would
|
||||
have, asked through `mesh-delivery.what-if`: the modules it moves and their fan-out (ADR 0401 §6).
|
||||
5. **Ask the operator to confirm the milestones**, in a short table: number, outcome, the acceptance tests it
|
||||
proves, repositories, the parts each repository builds. Change what they change.
|
||||
6. **Open the issues.** For each confirmed milestone, `issue-tracker.open` one issue per repository part, its
|
||||
|
||||
@@ -140,12 +140,15 @@ never into the running one, unless it blocks the running one.
|
||||
5. **The reviewer marks each pull request ready as soon as the acceptance is shown** with
|
||||
`mesh-delivery.mark-ready` (the delivery of the head it approved, who reviewed it and why), which writes the
|
||||
label `mesh/ready` and then `ready at <full sha>`, the order the forge counts (issue 913); mesh-delivery merges it when its checks pass
|
||||
(ADR 0364). The operator's word is waited for only when the step changes what the operator sees, removes
|
||||
and the operator approved the merge into main on Telegram or at the terminal (ADR 0364, ADR 0398 §3). Beyond that
|
||||
Approve, the operator's word is waited for only when the step changes what the operator sees, removes
|
||||
data, or needs a step only the operator's terminal can take; the lead says which before the step starts.
|
||||
|
||||
**One exception: a catalogue change that uses a new manifest word.** The catalogue's merge check reads
|
||||
manifests with the controller the mesh runs, so the controller's pull request is merged and delivered first;
|
||||
then `mesh-delivery.recheck` the catalogue's and merge it on the new verdict. Plan such a feature as two steps.
|
||||
The exception ends when milestone 3 of design 47 is delivered (issue 977, ADR 0402, ADR 0403): the group's composed
|
||||
check, judged by the group's controller, is then each member's gate, and the feature is one group.
|
||||
|
||||
## Phase 4 — Deliver
|
||||
|
||||
|
||||