Design 47 H2: H-A-505, a passed build step on an existing build reserves its version
This commit is contained in:
@@ -1314,3 +1314,11 @@ The lead's one-line answers to the questions H2's develop and review raise (impl
|
||||
sequence as the runner records it, the compare-and-set and the node-engine's compare stay as written, and a want
|
||||
written with an again number is superseded by any sequence. P-one-truth (the design line already settles the order);
|
||||
least code.
|
||||
- **H-A-505 (a passed build step on an existing build reserves its version, 23:50)** 22 Nov 23:08: in main.320.again.1
|
||||
the builder answered thirteen build steps "passed (existing build)" on done keys that had reserved no version (builds
|
||||
of cancelled pipelines, before the builder's reservation fix ran there), so thirteen movers passed the pipeline and
|
||||
released nothing, and the assigner said no-passed-pipeline for each; the lead reserved them by hand with
|
||||
builder_reserve_done. So: when a build step passes on an existing done build that holds no reservation, the builder
|
||||
reserves the next version for it and queues its publish in the same answer, exactly what builder_reserve_done does by
|
||||
hand (A-455), and says so in the step's why; a passed step never leaves a mover without a version. P-failure-loud; the
|
||||
mesh owns the truth (a hand act that is needed every time is a missing behaviour).
|
||||
|
||||
Reference in New Issue
Block a user