Design 47 H2: H-A-505, a passed build step on an existing build reserves its version

This commit is contained in:
2026-11-22 23:24:03 +01:00
parent cb50af4b59
commit a47904606c
@@ -1314,3 +1314,11 @@ The lead's one-line answers to the questions H2's develop and review raise (impl
sequence as the runner records it, the compare-and-set and the node-engine's compare stay as written, and a want
written with an again number is superseded by any sequence. P-one-truth (the design line already settles the order);
least code.
- **H-A-505 (a passed build step on an existing build reserves its version, 23:50)** 22 Nov 23:08: in main.320.again.1
the builder answered thirteen build steps "passed (existing build)" on done keys that had reserved no version (builds
of cancelled pipelines, before the builder's reservation fix ran there), so thirteen movers passed the pipeline and
released nothing, and the assigner said no-passed-pipeline for each; the lead reserved them by hand with
builder_reserve_done. So: when a build step passes on an existing done build that holds no reservation, the builder
reserves the next version for it and queues its publish in the same answer, exactly what builder_reserve_done does by
hand (A-455), and says so in the step's why; a passed step never leaves a mover without a version. P-failure-loud; the
mesh owns the truth (a hand act that is needed every time is a missing behaviour).