@@ -269,6 +269,12 @@ issue whether it is being fixed in between, after the delivery, or waits, and on
|
||||
One with no answer is a change asked. On 2026-10-23 the forge module's loop rewrote every repository's
|
||||
branch protection every ten minutes from rules in its code and undid the operator's changes at the forge
|
||||
(issue 1903).
|
||||
9. **At the second instance of a fault kind in a review, the developer searches for every instance and names each in the
|
||||
report.** On 2026-10-25 a "busy, return at once" guard that dropped a newer request was found in three places,
|
||||
one review after another. The developer writes the kind in one line, searches the repository (`git grep`) for
|
||||
its shape, fixes every hit in one change and lists each file and line in the report. How it is checked: a
|
||||
report to the second round naming a kind and one place only, followed by a third round on the same kind, is
|
||||
this rule skipped.
|
||||
|
||||
## Step 3 — Check (no review)
|
||||
|
||||
@@ -349,6 +355,16 @@ issue whether it is being fixed in between, after the delivery, or waits, and on
|
||||
the Approve and the merge, and wakes the lead. Beyond that
|
||||
Approve, the operator's word is waited for only when the milestone changes what the operator sees, removes
|
||||
data, or needs a step only the operator's terminal can take; the lead says which before the milestone starts.
|
||||
**A pull request that depends on an earlier one outside its delivery group is opened only once the earlier one is delivered**, its build
|
||||
running on every machine it should reach, not merely merged. A note in the description is no safeguard: the
|
||||
operator's Approve merges whatever is asked. On 2026-10-25 a second change merged before the first was delivered
|
||||
and machines lost modules. How it is checked: `mesh-delivery.deliveries` shows the earlier change's source
|
||||
revision `delivered` before the later pull request exists (`gitea.gitea_get_pull_request`, its creation time);
|
||||
a later one older than that is this rule skipped. Members of one delivery group are the exception: they open together, with one check, one Approve and one merge in one pass (item 1).
|
||||
**A reviewed follow-up to a change the operator has not yet approved is folded into that pull request** (its head
|
||||
moved to include it): one Approve, one delivery. The old Approve ask closes itself on the new head and the new
|
||||
head is asked once its checks pass. How it is checked: a follow-up that sits in a second pull request while the
|
||||
first still waits shows in `gitea.gitea_list_pull_requests` as two open pull requests of one lead.
|
||||
|
||||
**One exception: a catalogue change that uses a new manifest word.** The catalogue's merge check reads
|
||||
manifests with the controller the mesh runs, so the controller's pull request is merged and delivered first;
|
||||
|
||||
@@ -76,6 +76,13 @@ one delivery**. Everything before the try is local and fast.
|
||||
integration test starting the module whole against the real bus and store, run by `mesh-controller.try` and the checker's merge check
|
||||
(ADR 0391 §1, §6); unit tests alone are not that proof, and the lab is not used. The operator's word is waited for only when the fix changes what the operator sees, removes data,
|
||||
or needs the operator's terminal.
|
||||
**A fix that depends on another pull request outside its delivery group opens only once that one is delivered**, not merely merged (members of one group open together, as playbook 07 step 3 item 1 says) (a note
|
||||
in the description does not hold it back: the Approve merges whatever is asked; 2026-10-25, machines lost modules
|
||||
when a second change merged first). **A reviewed follow-up to a fix still waiting for the Approve is folded into
|
||||
that pull request** (head moved): one Approve, one delivery. Both are checked as playbook
|
||||
[07](07-feature-branches.md) step 3 says.
|
||||
**At the second instance of a fault kind found in a review, the developer searches for every instance** and names
|
||||
each in the report (playbook [07](07-feature-branches.md) step 2, item 9).
|
||||
7. **Follow its delivery to done**: a watcher waits on the status view's events (`mesh-delivery-view.moving`,
|
||||
`.settled`, `.stuck` and `.delivered`) and reads the view's `assigner_wants` and `node_haves` after each wake, as
|
||||
playbook [07](07-feature-branches.md) step 4 says; the delivery is done when the view says `delivered` for its
|
||||
|
||||