Design 47 H: section 10, rows 97 and 99
This commit is contained in:
@@ -613,5 +613,6 @@ Added by the lead at 21:30 CET, from the run of 19:50 to 21:30; a row met again
|
||||
| The indexer (`mesh-delivery-indexer`) refused its own take-in-again tool's ask ("a takeins value naming no hand act the indexer serves"): the decoder of a take-in ask kept a hand-written list of hand-act fields that the new field was not added to, and no test sent a tool's value through the decoder; the indexer. Settled in H1 by deriving the check from the ask's fields, and by a table test that decodes every tool's value. Owed: the same table test for every module whose tools write asks its daemon decodes. | H1 (the fix); H2 (the kind across modules) |
|
||||
| The seat mesh-catalog's revision verb answered from the tools bundle's view of the trunk in memory, which ran one or more revisions behind the kept revisions once releases kept several in a row, so the pipeline runner waited minutes for a revision the indexer had kept (four minutes for revision 52) and the builder's picture failed a pipeline's first builds past its bound (rows 68 and 84); the indexer (`mesh-delivery-indexer`) and the builder. Settled by H-A-222 (the verb answers the newest kept revision read from the store at the ask; the builder's picture holds an ask that names a kept revision number, read by number), in build. | settled in H1 once delivered |
|
||||
| A release re-pinned a mover of a running pipeline of 120 movers (the tool runner, pinned to the SDK's new version) while that pipeline still built it at the old fingerprint; the build failed and, as a pipeline passes or fails whole, took every other mover with it, because the runner moved only movers of waiting pipelines; the pipeline runner (`mesh-delivery-pipeline`). Settled by H-A-223 (a moved mover leaves a running pipeline too: its steps end superseded, its asks are cancelled, the end judgement counts it as left; a pipeline whose every mover left ends superseded), in build in the runner. Also seen in the same pipeline: two builds done "but no version is reserved", because the builder's picture lagged the revision that named their fingerprints (row 95's cause). | settled in H1 once delivered |
|
||||
| On the build node the SDK's own integration test of the views reader ("the views reader and two handlers share the module's one durable") failed under the new guard against a second pull loop on one durable (H-A-196), while the same test passed locally at review; cause under study (a second bind the reader makes, or the test's own); the fix keeps one pull loop per durable per process, with the handlers fanning out from it, in build; mesh-sdk. Also seen: four release-revision pipelines waited with no steps for over ten minutes behind one running pipeline that could no longer pass, because the pipeline runner (`mesh-delivery-pipeline`) runs one pipeline at a time and ends a pipeline only when its last step ends. Owed: a pipeline that cannot pass ends at once (H-A-163 as written), and the queue's setting is raised once the build nodes allow. | H1 (the SDK's fix); H2 (the queue) |
|
||||
| On the build node the SDK's own integration test of the views reader ("the views reader and two handlers share the module's one durable") failed under the new guard against a second pull loop on one durable (H-A-196), while the same test passed locally at review. The cause, not the guard: the test read the durable's pending-ack count the moment the handlers had spoken, while the reader acknowledges afterwards and the bus takes acknowledgements on its own, so one was still pending on the loaded build node; the test now publishes a mark event and waits for the consumer's acknowledged floor to reach it, fixed in mesh-sdk, in review. The kind: a test reading the bus's acknowledgement count right after a handler speaks; mesh-sdk. Also seen: four release-revision pipelines waited with no steps for over ten minutes behind one running pipeline that could no longer pass, because the pipeline runner (`mesh-delivery-pipeline`) runs one pipeline at a time and ends a pipeline only when its last step ends. Owed: a pipeline that cannot pass ends at once (H-A-163 as written), and the queue's setting is raised once the build nodes allow. | H1 (the SDK's fix); H2 (the queue) |
|
||||
| With the SDK's new guard against a second pull loop (H-A-196), which reads a consumer's cached information at bind, a test fake of a consumer in the indexer (`mesh-delivery-indexer`) that answered no such information panicked, so the indexer's unit step would fail against the new SDK although no indexer code changed; mesh-sdk and the delivery repository's modules. Fixed in H1 by completing the fakes across the delivery repository's modules. Owed: a change of the SDK that adds a call on an interface every module fakes is tried against the modules' suites before its merge (the group's check builds every importer, but runs no importer's suite). | H1 (the fakes); H2 (the check) |
|
||||
| The builder was restarted by hand while Go asks ran in the Go build module's runtime (`mesh-build-go`), whose step list showed none because it does not list the builder's own delivery asks (row 86); the asks survived the restart because the build module runs them, but the "no running step" check before a hand restart is blind to them; the build modules and the runbook. Owed: one tool across the build seats that lists every running ask, whoever asked it. | H2 |
|
||||
|
||||