Design 47 H2: H-A-705, the operator's scope answer for H2's corrections

This commit is contained in:
2026-11-25 14:41:46 +01:00
parent 21d73c8e02
commit c25504778f
@@ -472,3 +472,9 @@ bb11615, the node-engine d27af83, mesh-contracts 52e5224) and of mesh-tools 3934
`merge-pull` description says so. Built with G1 (gitea's own account), so the gitea module is delivered once. How it
is checked: a row of the merge call's tests (a watched repository's pull request into a branch it does not watch is
merged plainly with the note); live, hq's next pull request merges through `git.merge-pull`. ADR 0684 §4; principle 7.
- **H-A-705 (the operator's scope answer for H2's corrections, 14:41)** 25 Nov; the operator in chat, about 14:1x CET, "scope
accepted", to the lead's five recommendations: DQ-5 in (H-A-543 and H-A-545 (3) as amended, as G1: 783d5c82 and
b7e379f5 rebased onto mesh-catalog main, e76cc064 left out); DQ-10 in (H-A-566 as amended by H-A-572, H-A-595 and
H-A-608, as I7, af09bb9a read as new code; H-A-565 (2) and (3) not taken); DQ-12 and DMC-6 to H3 (the dissolution of
mesh-delivery-sdk; H-A-624 (1), (3) and H-A-626 wait there; H-A-589 (4), H-A-570 (3), H-A-603 and the kits are built
where they stand); DQ-23 to H4 §759; DQ-30 after design 47, its decision first (issue 946).