Design 47 H: section 10, findings 172 and 173; the freeze is lifted
This commit is contained in:
@@ -414,7 +414,7 @@ next:
|
||||
to main through a merge call (`merge-pull`, design 47 H §734), followed from `take-in.taken` through `pipeline-ended` to the node-engine's `running` and the gate's
|
||||
ended record, with no hand act; then one two-module change along a dependency edge (mesh-sdk and a module that
|
||||
requires it published), merged in one merge call, the same way. Each proof read with the tools and quoted with its times.
|
||||
8. **Lift the freeze.** From here every merge is delivered by its pipeline; a hand pack is a breach the lead names.
|
||||
8. **Lift the freeze.** From here every merge is delivered by its pipeline; a hand pack is a breach the lead names. Done at 19:31 on 2026-11-21 (section 10, row 173).
|
||||
|
||||
## 6. The milestones after the clean state
|
||||
|
||||
@@ -550,7 +550,7 @@ desktop, with hand restarts), and these were met on the way. A row a lead answer
|
||||
| A bundle reload of the tool runner still unloads before it serves, so calls in the gap meet no responders (said, not silent), and the mesh MCP server's package takes 28 s to load; the tool runner. | H2 |
|
||||
| The seat node-files has no verb that reads a file's sha256, and its `copy` refuses another node (issue 903), so hand packs were copied by the lead's shell; node-files. | H2 |
|
||||
| The builder's unit written by hand on the desktop carries none of the manifest's setting variables, so its settings are the defaults; the builder's hand pack. | H1, the runbook |
|
||||
| The clean proofs of the runbook's step 7 are still owed: the first proof failed on the version race (settled by H-A-155), the second ran for the publish of the SDK packages; the freeze is not lifted (step 8). | H1 |
|
||||
| The clean proofs of the runbook's step 7 are still owed: the first proof failed on the version race (settled by H-A-155), the second ran for the publish of the SDK packages; the freeze is not lifted (step 8) (lifted at 19:31 on 2026-11-21, row 173). | H1 |
|
||||
|
||||
Added by the lead at 19:50 CET, from the run of 18:40 to 19:50; a row met again names the row of 18:40 it adds to.
|
||||
|
||||
@@ -571,7 +571,7 @@ Added by the lead at 19:50 CET, from the run of 18:40 to 19:50; a row met again
|
||||
| Met again: the SDK's finding write for an unhandled event waits up to 3 s on the bus inside the event loop, seen as a 90 s test (the row of 18:40); mesh-sdk. | H2 |
|
||||
| Met again: the build node counts untagged tests into a module's integration count (the row of 18:40); the Go build module (`mesh-build-go`). | H2 |
|
||||
| Met again: the step outputs store keeps 0 bytes, so a failed test's words are lost (the row of 18:40); the pipeline runner. | H2 |
|
||||
| The proof of the runbook's step 7 is still owed: proof 1 failed on the version race, proof 2 twice, on stale pins and on the composition step of a module no machine holds (settled by H-A-179), both settled; the freeze is not lifted (step 8). | H1 |
|
||||
| The proof of the runbook's step 7 is still owed: proof 1 failed on the version race, proof 2 twice, on stale pins and on the composition step of a module no machine holds (settled by H-A-179), both settled; the freeze is not lifted (step 8) (lifted at 19:31 on 2026-11-21, row 173). | H1 |
|
||||
| Four hand placements more (the distribution tools bundle, the assigner, the builder's program, the node-engine twice) and five hand restarts were needed to break circles, each said to the operator; the runbook. | H1, the runbook |
|
||||
|
||||
Added by the lead at 21:30 CET, from the run of 19:50 to 21:30; a row met again names the row it adds to.
|
||||
@@ -688,3 +688,5 @@ Added by the lead at 21:30 CET, from the run of 19:50 to 21:30; a row met again
|
||||
| The tool runner's own pipeline (row 167) waited its turn behind the running ones and was placed at 19:20 with eight steps; the fixed builder (row 166) had built and published the tool runner's release 0.1.56 at 19:15, before the pipeline's turn came, the publish sent by the publish-again path within a minute of the build's end. The first test fix (row 168) went to a second review round: it cited an issue instead of its design line (A-474, a module's tests read nothing outside their module), and its drift guard compared the copies against the sibling module's tree, which that line forbids; the guard now holds only the module's own manifest, and the contracts module's facts are proven against copies without a guard (rows 166, 167 and 168); the pipeline runner (`mesh-delivery-pipeline`), the builder and the private network module. Owed: the facts' home is a test in the contracts module. | H1 |
|
||||
| The tool runner's own pipeline (row 169) ended failed at 19:21 in its composition step: the compose ask met no responders on the node-engines of three nodes at once, while every node-engine answered discovery three minutes later; the lead ran the step again at 19:25 with the pipeline runner's rerun tool, and H-A-296 settles the kind (a seat ask that meets no responders is asked again with a back-off until its bound, never a verdict at once). The remaining three test fixes are built: the teller's test bed now answers the seat-holder ask the live mesh answers (the fault was the bed's, five of seven pipeline failures today), and on the way a live fault of the teller was fixed (two takers of one event since the SDK's views reader took its bare subject; H-A-295 keeps the ask-again for want of room until A-424 is built); the zfs module's test race is fixed, with a real fault of its client beside it (a peer not root whose write was cut was never told "only root"); and the forge's whole-seat test ends NOT RUN when its npm tooling is missing (H-A-294) (rows 165, 168 and 169); the holder of the seat mesh-wants (`mesh-delivery-assigner`), the pipeline runner (`mesh-delivery-pipeline`), the teller, the zfs module, the forge module and the Go build module. Owed: the no-responders wait in the assigner's composition run and in the runner's asks, and the step's own NOT RUN summary in the Go build module. | H1 (the fixes); H2 (the no-responders wait, the step summary) |
|
||||
| The tool runner's own pipeline (rows 169 and 170) passed after the composition's rerun, and at 19:28:13 the holder of the seat mesh-wants wrote the tool runner's want on every node (the operator's desktop, the laptop, the home server and the control-node) at the new fingerprint and release 0.1.56, step passed-pipeline (read by the lead at 19:30 through the assigner's reasons tool); the mesh MCP server dropped for a minute at 19:29, as the tool runner on the operator's desktop restarted with the new release; the node-engines' start of the new release on each node is being read, and is row 172's. From the probe merge at 19:13 to the wants: fifteen minutes, the rerun's three minutes inside them. This is the delivery part of proof 2 (row 167); the one-call merge of the SDK and the tool runner was row 136's (rows 136, 167 and 170); the holder of the seat mesh-wants (`mesh-delivery-assigner`) and the tool runner (`node-tools`). | H1 |
|
||||
| The node-engines applied the tool runner's new composition on every node within thirty-five seconds of the wants: the laptop at 19:28:36, the control-node at 19:28:42, the operator's desktop at 19:28:46 and the home server at 19:28:47, each restarting the tool runner because its bundle and its fingerprint changed, and reporting the new build healthy within twenty seconds (the build digest the node-engines report, 0a11dca2…, is the one the builder published as release 0.1.56 at 19:15); the control-node's node-engine had waited a minute for the composition ("the composer has made none yet", 19:27:43), the no-responders episode of row 170. Proof 2 is shown: the SDK and the tool runner merged in one call (row 136, 12:26), the tool runner running everywhere at the new SDK release by its pipeline (rows 167 to 172), no hand act on its path, and the day's hand packs all on the delivery system's own parts (rows 136, 167 and 171); the node-engine and the tool runner (`node-tools`). | H1 |
|
||||
| The lead's statement (lead-47, on the operator's desktop, 19:31): the freeze on hand placing of the delivery system's parts is lifted (step 8). Both proofs of the runbook's step 7 are shown; every part of the delivery system now runs a build its own pipeline delivered or, where a hand pack of today still runs (the pipeline runner, the builder, the indexer, the assigner, the tool runner, the private network module and the store module, named in rows 134, 148, 160 and 166), a build whose source is merged on main and whose pipeline has passed or runs. From now a change to any part is delivered by its pipeline only, and a fault met is fixed in its repository and delivered the same way; the operator's rule of 2026-11-16 on probe merges ends with this statement. The merge of the change of the assigner and the runner (row 146) waits on the operator's word only because the permission check of the lead's session refused the dispatch, not as a decision. What H1 leaves to H2 is the owed list across rows 150 to 170; the runbook. | H1 (done) |
|
||||
|
||||
Reference in New Issue
Block a user