Commit Graph
5 Commits
Author SHA1 Message Date
mesh-tools 6be8f6eada Feature 57 (config and provisioning): the record of its designs, playbooks and glossary words, synced with main
mesh/merge-gate head 6be8f6eada67 merged into trunk b7e22be7f55f — pass: [release feat/57-config-and-provisioning, judged by its controller cf897e89fe31] t…
mesh/repo-check head 6be8f6eada67 merged into trunk b7e22be7f55f — pass: [release feat/57-config-and-provisioning, judged by its controller cf897e89fe31] i…
mesh/delivery delivered
2026-10-16 07:22:11 +00:00
jschoubben 418261213c Remove the decision records and research efforts, which the knowledge base now holds whole (issue 426)
mesh/merge-gate pass: the change touches no module of the mesh's graph
mesh/repo-check pass: THE CHANGE ALTERS ITS OWN CHECK (merge-check.sh): main's version judged it; the change's judges the pull requests after it merges; it…
mesh/delivery superseded: a newer head of the same pull request
ADR 0290 rule 9: once the import is checked record by record, hq keeps no copy.
The records and efforts are removed; every link or path to them reads "ADR NNNN" or
"research NNN"; a design's decisions: lists "ADR NNNN". 02-DECISIONS keeps a pointer
README with the reading order's six topics, which the knowledge base reads through the
records module; 01-RESEARCH keeps a pointer README. The checks drop the rules that
judged records (the knowledge base holds each at propose; checks/README.md says where)
and refuse a record written here again. Playbooks 01 and 02 and the skills write and
read records with the knowledge base's verbs.
2026-10-11 12:56:09 +02:00
jochen 85da2fb93f Issue 354: a decided rename was never scheduled, and a record that defers work names its issue
ADR 0244 left the code renames of the node-engine and the tool runner for later with no issue, owner or
date, and two days on the operator believed them live. Open the issue with the inventory, the risk and a
staged plan; add the rule to playbooks 02 and 04, as a dated insight on ADR 0244, and as a cycle.py check
that found the same gap in ADR 0270 (issue 355).
2026-10-09 19:27:05 +02:00
jschoubben 87f4f29cc6 Novox Mesh, Nox, and HQ becomes company-scoped
ADR 0027 — the product is Novox Mesh, shortened to mesh internally. HAL was
never chosen: it arrived with the dotfiles repository this grew out of, it
is borrowed, and it is borrowed from the canonical untrustworthy machine
intelligence, which is an odd flag for infrastructure trusted with
credentials. Timing is the substance of the decision, not an aside — the
skeleton is not built, so renaming costs a search and replace now and a
migration later.

Nox is an identity of Novox, and specifically the agent of the MESH rather
than of a node. Nodes keep their own identities. Nox addresses them, and a
human mostly talks to Nox — which makes it the concrete form of the
mission's vision: state an intent, and the mesh works out which node holds
the thing. It holds no private channel. The gap this opens is recorded:
ADR 0012 binds every agent to a home node, and a mesh-scoped agent has
none, so the model needs extending.

ADR 0028 — HQ is company-scoped, novox/hq, with the mesh as its first
product. Checked rather than assumed: the company organisation already
holds live projects that the mesh builds and deploys, so they are tenants
rather than peers, and the mesh is the ground they stand on. There is also
company work outside the mesh already, which strengthens the case and means
the eventual split is closer than "some day" — so each document's scope is
fixed now, in a table, making that split mechanical instead of
archaeological. The folders are deliberately not restructured yet.

The skeleton takes the new vocabulary: mesh-host, mesh-substrate,
mesh-control, mesh-surfaces, mesh-catalog. Substrate drops to four services
now that identity is a hosted workload rather than a dependency.

Research 009 opens the migration, with the reframing that lowers its risk:
replace the control plane, do not move the workloads. Their data never
moves, so it is re-declared rather than adopted — which keeps adoption out
of scope, as the lab design requires. Self-hosting is the last phase, or a
failed cutover takes away the means to fix it.
2026-08-23 21:20:35 +02:00
jschoubben c0b35652d0 The numbering is the flow: decisions are 02, design is 03
papa-hq reads 01 research -> 03 decision -> 02 design. The order is a
scar, not a choice: 02-DESIGN existed from its initial commit, and when
adr/ was finally promoted on 2026-07-13 it took the next free number
rather than its place in the sequence. By then design was too settled to
renumber.

hal-hq was three commits old, so it is not. adr/ becomes 02-DECISIONS and
02-DESIGN becomes 03-DESIGN, and following the folder numbers now walks
the process in the order it happens: research produces a decision, the
decision authorises a design.

00-GENESIS becomes 00-META, matching papa's rename from the same
restructure.

Every path reference rewritten across documents, frontmatter, playbooks
and skills. All links resolve; all 58 frontmatter blocks parse and their
path fields still point at files that exist.
2026-08-23 18:05:11 +02:00