Commit Graph
8 Commits
Author SHA1 Message Date
jschoubben 80b647a2ed Name the acceptance tests in the milestone table and say what the review returns (review round 2)
mesh/merge-gate head 80b647a2ed66 merged into trunk f8c0676b3a1d — pass: the change touches no module of the mesh's graph
mesh/repo-check head 80b647a2ed66 merged into trunk f8c0676b3a1d — pass: its merge-check.sh passed
mesh/delivery delivered
2026-10-16 02:12:17 +02:00
jschoubben a4c5ef69bb Give the build's acceptance tests a home in the design and milestones, and answer review round 1
The research playbook named acceptance tests the milestones carry, which
playbooks 02 and 04 did not know; its pre-check also disagreed with the
knowledge base's deferral rule.
2026-10-16 02:11:27 +02:00
jschoubben 2a61c57258 Settle research decisions before proposing versions, and test on the cheapest bed (playbook 01)
Research 053's identity part took six versions and about two hours: options
that broke the mesh's own rules were offered and argued back, a version was
proposed after every answer, and reviews returned findings a pre-check
would have caught. A lab run was planned where an in-process test answered.
2026-10-16 02:09:22 +02:00
jschoubben 99243ec47e Confirm milestones before opening their issues, name issue 845 for the check, keep 01's withdrawal and history lines
mesh/merge-gate head 99243ec47efa merged into trunk 5ff97ec3aa02 — pass: the change touches no module of the mesh's graph
mesh/repo-check head 99243ec47efa merged into trunk 5ff97ec3aa02 — pass: its merge-check.sh passed
mesh/delivery delivered
2026-10-15 21:19:01 +02:00
jschoubben 0d66edb24c Make playbooks 01, 02 and 04 one cycle from idea to delivered milestones
The operator found 04 odd on 2026-10-15: it went from a settled design straight to building,
with no work breakdown, and contradicted playbook 07 on pull requests. 01 now starts from the
operator's idea with setup questions, findings and a direction the operator confirms; 02
graduates that direction into one record per reversible choice and hands the design on; 04
breaks it into milestones usable on their own, one issue per repository part, each milestone
one feature step of 07. 01 notes the knowledge base's insight-only rule for an active effort
until issue 844 is delivered.
2026-10-15 21:18:15 +02:00
jschoubben 0afc8cc5f8 Name the commit the knowledge base's records now come from, and link research with touches and decisions with rests-on (review of #312)
mesh/merge-gate pass: the change touches no module of the mesh's graph
mesh/repo-check pass: THE CHANGE ALTERS ITS OWN CHECK (merge-check.sh): main's version judged it; the change's judges the pull requests after it merges; it…
mesh/delivery delivered
2026-10-11 13:25:21 +02:00
jschoubben 418261213c Remove the decision records and research efforts, which the knowledge base now holds whole (issue 426)
mesh/merge-gate pass: the change touches no module of the mesh's graph
mesh/repo-check pass: THE CHANGE ALTERS ITS OWN CHECK (merge-check.sh): main's version judged it; the change's judges the pull requests after it merges; it…
mesh/delivery superseded: a newer head of the same pull request
ADR 0290 rule 9: once the import is checked record by record, hq keeps no copy.
The records and efforts are removed; every link or path to them reads "ADR NNNN" or
"research NNN"; a design's decisions: lists "ADR NNNN". 02-DECISIONS keeps a pointer
README with the reading order's six topics, which the knowledge base reads through the
records module; 01-RESEARCH keeps a pointer README. The checks drop the rules that
judged records (the knowledge base holds each at propose; checks/README.md says where)
and refuse a record written here again. Playbooks 01 and 02 and the skills write and
read records with the knowledge base's verbs.
2026-10-11 12:56:09 +02:00
jschoubben c0b35652d0 The numbering is the flow: decisions are 02, design is 03
papa-hq reads 01 research -> 03 decision -> 02 design. The order is a
scar, not a choice: 02-DESIGN existed from its initial commit, and when
adr/ was finally promoted on 2026-07-13 it took the next free number
rather than its place in the sequence. By then design was too settled to
renumber.

hal-hq was three commits old, so it is not. adr/ becomes 02-DECISIONS and
02-DESIGN becomes 03-DESIGN, and following the folder numbers now walks
the process in the order it happens: research produces a decision, the
decision authorises a design.

00-GENESIS becomes 00-META, matching papa's rename from the same
restructure.

Every path reference rewritten across documents, frontmatter, playbooks
and skills. All links resolve; all 58 frontmatter blocks parse and their
path fields still point at files that exist.
2026-08-23 18:05:11 +02:00