Two agents could start on one issue without seeing each other, and an issue
could be resolved without anyone having said they started its fix. Adds the
status fixing, the issue's worker (by, who@node) with take-over and a stale
bound, and resolved only from fixing; settles what to-be 53 left out as
claims, under the new glossary word worker. Amends to-be 53, playbook 03 and
the hq-diagnose and hq-status skills, with pointer notes on ADR 0275 and 0281.
The import of slice 3 (ADR 0275) was checked against every folder: no report changed since the
commit it read, and the tracker holds each report's status, owner, fix, design amendment, replay
and closing day. The keys are removed from all 361 reports, cycle.py refuses them in any report,
and the playbooks, skills and READMEs that still pointed at them name the tracker instead.
Issue numbers collided while each author read main and the open pull
requests; since 2026-10-10 the tracker (ADR 0275) hands them out. The
playbook and the hq-new-issue skill now open every issue there, keep a
folder only for a design or governance issue, and say where its status
lives until slice 3. Research 042's finding that the SDK had no
compare-and-set is corrected, and to-be 53 names the module's code.
ADR 0244 sorts the mesh's concepts into ten domains (ADR 0006's contexts
carry over as domains), keeps machine and node as distinct words, and
makes the glossary the authority with every retired word on its
replacement's Not: line. To-be 49 draws the domains; the glossary is
reorganised by them, its two contradictions removed and the missing
words added. words.py now fails on a retired word in running prose and
on a word defined twice, so the rule is enforced rather than believed;
the 63 documents it failed on are reworded here, and research 034 is
kept as the record of the words it studied.
The operator approved Phase 5. Decides what the design left open: the build seat runs the
merge check, the facts live in the artifact store, the merge gate composes the mesh as it is
and with the change and judges only what the change adds, a replay lives where its incident
is, and the controller's tests run a bus of their own at the mesh's release. A core issue now
resolves only with a replay or a stated reason, checked by cycle.py.
Three issues named the branch that fixed them, and a branch is deleted
when it merges — so every `fixed-by:` was a pointer that resolved to
nothing by the time anyone followed it. They name commits and pull
requests now, and playbook 03 says to.
Two records were missing the thing a reader arrives for. 146 did not say
that one of its fixes crash-looped the control plane on a running mesh,
which is the whole reason the delivery subject carries the stream and the
raise path was the only one exercised. 151 did not say that 152 removed
the false reasons its roster moved, or that it stays open for the real
ones.
ADR 0080 enumerates what cycle.py enforces and named four things; it
enforces five. A progressive insight names the fifth — the decision
stands, the list had gone stale. The checks README and playbook 03 gained
the same rule, and 155 points at all three.
papa-hq reads 01 research -> 03 decision -> 02 design. The order is a
scar, not a choice: 02-DESIGN existed from its initial commit, and when
adr/ was finally promoted on 2026-07-13 it took the next free number
rather than its place in the sequence. By then design was too settled to
renumber.
hal-hq was three commits old, so it is not. adr/ becomes 02-DECISIONS and
02-DESIGN becomes 03-DESIGN, and following the folder numbers now walks
the process in the order it happens: research produces a decision, the
decision authorises a design.
00-GENESIS becomes 00-META, matching papa's rename from the same
restructure.
Every path reference rewritten across documents, frontmatter, playbooks
and skills. All links resolve; all 58 frontmatter blocks parse and their
path fields still point at files that exist.