Commit Graph
13 Commits
Author SHA1 Message Date
jschoubben b68103d198 A module is adopted with the credentials it already has
Nothing is rotated during the conversion. A service keeps the password
it is already using, because minting a new one is how a running service
stops being able to reach its own database mid-migration.

The mesh has both paths already: generate-and-seal for a new module,
accept-and-seal for an adopted one. Adoption needs the second, and it is
built.

Rotation becomes a separate act afterwards, once everything works — the
machinery is proven, and it is a thing to do deliberately rather than as
a side effect of moving a service between systems.

Records the step that has to come first and is easy to miss: read the
current environment out of the old system while it can still be read.
Once accepted, the mesh cannot show a secret back, and once the old
system is gone neither can that. A password nobody wrote down is a
service nobody can adopt.
2026-08-31 21:31:26 +02:00
jschoubben c570c687f6 The handover: switch off the old brain, leave the services running
The conversion method, recorded because it decides everything else and
was not written down.

The old control plane is stopped — provisioning, coordinator, syncs, the
pipeline, anything that decides or writes. The workloads it was managing
keep running, because nothing is managing them. The new mesh then takes
ownership one module at a time.

Nothing is ever unassigned in the old system. Unassigning is how it
removes things and removing is how data is lost; it is asked to stop
having opinions, never to take anything away.

Disabled rather than merely stopped, which is the part easy to get
wrong: those units are enabled, so a stop lasts until the next reboot. A
reboot mid-conversion would bring the old control plane back to
regenerate managed files underneath the new one — the one situation
where two systems really would fight over a machine.

A service left running with nothing managing it is the safe state: it
has its data, its configuration is on disk, and nothing will change
either. The risk in a conversion is in the managing, not the running.

Also records why taking ownership piecemeal is safe: the new host's
orphan removal is per-origin, so it only removes what it recorded
itself. Services it was never told about are not orphans to it.
2026-08-31 19:55:35 +02:00
jschoubben d1ab2dc0b4 Data outlives the mesh that declared it, and the conversion starts where it lives
0030, found by asking what the conversion actually needs rather than by
reviewing anything. The host deleted a directory and everything under it
when it stopped being declared — which happens when a module is
unassigned, or when a manifest is edited to move a data folder, which is
the exact operation this plan needs. A database's files, a mail spool.
The report said "removed".

A directory still holding something is now kept and said so. No flag and
nothing to remember: emptiness is the test, and it works because the
removal order was already right — the mesh's own contents are gone by
the time the directory is reached, so what remains is by definition
something nobody declared.

The plan now says data outranks its own ordering: copy, read back
through the service that owns it, and only then point anything at the
new location. Never move and then check.

And it records where this starts — the node holding all the production
data — with what that costs stated rather than argued with. Everything
proven so far was proven on machines that could be destroyed and raised
again. A scenario proves the mechanism, not the state on that machine.
2026-08-31 19:54:41 +02:00
jschoubben 9ad0ec35e0 The conversion is done by hand, and that removes work from this plan
Recorded because it is load-bearing and was not written down: moving
from the current system to this one is a person at a command line, not a
migration program.

What that removes is larger than what it adds. Nothing in this plan
needs an importer, a translation layer, a compatibility shim, or a way
of keeping two systems agreeing while both are live — each of which
somebody would otherwise reasonably build, use once, and maintain for a
year.

It also settles what "safe" means for the system being retired: a fix to
it must be safe on its own, because there is no careful rollout to
sequence it into. A change needing three steps in the right order is a
change that will be half-applied. That reversed a certificate default I
had chosen this morning.
2026-08-31 19:46:21 +02:00
jschoubben e4327a3a5e Phase 1.3 done: ordering was already there, the network was not
Ordering needed no change for the third time running — resources apply
in the order declared and nothing sorts them — and is now asserted,
because sorting them for any sensible reason would have passed every
other test.

Separates ordering from readiness, which the task had run together: a
container started is not a container ready. Nothing waits, and what
needs something usable retries. That is deliberate and more robust than
start ordering, since a dependency can restart long after apply.

The network was the first thing in Phase 1 that genuinely needed
building, and the first that needed a decision: 0029 records why a shape
rather than an action, and the vocabulary is nine.
2026-08-31 18:55:22 +02:00
jschoubben ce486fd5d2 Phase 1.2 done, and it is the same surprise as 1.1
A session as a licence consumer needed no change either: the two
sessions are two modules, so the existing (node, module) binding already
names them apart. 14-model-access.md's "a step toward it and not it" is
true of a worker and not of a session, and the difference is that there
is one session per node rather than many per machine.

Records what stays open: the worker half of that gap is real and
unaffected, and belongs with 0003, which is unbuilt.

Two tasks in a row that were already possible. Both were written from
the design rather than from the code — the review's own finding arriving
in the plan it produced. The remaining Phase 1 items should be checked
against the code before being started rather than after.
2026-08-31 18:41:19 +02:00
jschoubben fdd909ec40 Phase 1.1 done, and it was not the task that was written down
An object-store provision, proven against a real store with seven
assertions.

The finding is worth more than the task: the control plane
special-cases nothing. provides, requires, contributes and grants are
name-agnostic, so asking for a bucket needed no change to the mesh at
all. What was missing was a provider and the last step on the machine —
"add an object-store provision" was never mesh work, and the breakdown
now says so rather than leaving the next person to rediscover it.

Named s3-bucket by 0027: the coupling is to the API, not the product,
because swapping one store for another does not break a consumer. A
database is the other case and names its engine.

Records the assertion a database does not need, because it is the one
that will be forgotten when somebody writes the next provider: one store
holds every bucket behind one endpoint, so isolation is a policy rather
than a property, and a policy granting everything passes every test that
only checks a consumer can reach its own bucket.
2026-08-31 17:53:02 +02:00
jschoubben cb1954e7b5 Accept 0024, and rewrite the work breakdown around what is actually being done
**0024 accepted.** Model access was decided, built, and proven in the
lab, and two design documents rest on it; only the status had never
moved. The gate is green again.

**The work breakdown rewritten.** It planned a decomposition of the
existing system in place — extract contexts, declared features, shrink
the shared library. That is not the work. A replacement is being built
beside it, and only the old Phase 0 survived contact with reality, so
the one document meant to say what happens next was describing a system
being retired.

Now ordered by what "modules move across one at a time until the old
registry is off" actually requires:

- Phase 0 is marked done against the twenty-two lab assertions, **and
  carries its own limitation**: every module exercised was written to
  test the mechanism, so the vocabulary was shaped by its own fixtures.
- Phase 1 is the vocabulary gaps found by asking what real modules
  need — an object-store provision, a session as a licence consumer, a
  network shape with ordering, public certificate issuance.
- Phase 2 is one module, then a week of running it, because the point of
  going first is to find what Phase 1 missed.
- Phase 3 picks modules that each prove something the first did not; the
  mail system is last because it is the one that may send work back into
  the declaration language.
- Phase 4 is switching the registry off, named as a phase so it is not
  mistaken for the goal.

Keeps the rules of engagement unchanged — they were about how work is
done, not what it is — with one addition: stop and ask before anything
that touches a machine outside the lab.

Adds a section on keeping the list true, since the document it replaces
was wrong for weeks and nothing said so. A claim here is counted, not
reasoned, and a phase is done when the lab says so.
2026-08-31 17:25:27 +02:00
jschoubben 573a94e102 Correct the record: a limitation that no longer exists, and one that was never written
The connectivity design still said a hub cannot be filtered — a gap recorded in
the morning and closed in the afternoon, left standing as though it were
current. Worse than a stale date: it would send somebody away from something
that works.

`restart-on` was described nowhere, including the part added today that lets a
service reflect a file another module put on the machine. A rule the host
enforces and no document mentions is a rule nobody can rely on.

And nine of fifteen design documents claimed an `updated:` older than their last
change, some by a week. That field is what cross-cutting views are generated
from, so it is not decoration.
2026-08-31 12:33:35 +02:00
jschoubben f140303257 A module claims; it does not list its rivals. And flavor is retired.
Three decisions, all Jochen's, and the first is the one that unlocked it.

Exclusivity is not a property of a module. It is a property of a singular
resource the module takes over. Two shells compete for nothing and any number
may be installed; two display servers both want the seat. So a module declares
what it CLAIMS, and two modules claiming the same thing cannot both be assigned
within that claim's scope.

Not "xorg conflicts with wayland". Pairwise exclusion has a property that only
shows up later: adding a third display server means editing xorg and wayland to
know about it. Every new module requires changing modules nobody who wrote it
owns, and the edits grow as the square of the count. With a claim the third one
says what it claims and nothing else changes anywhere.

Claims have a scope -- node, site, mesh -- which is not new. The mesh already
enforces exactly one hub with a unique index. Scope is that idea said once
rather than hard-coded per case.

And some conflicts need no claim at all: two modules declaring the same file or
binding the same port are visible from what they declare. A claim is only
written for the abstract ones.

A requirement with several answers is refused, never guessed. One candidate is
assigned silently because there was no choice to make; none is refused naming
what is missing; several is refused naming them. That is what makes a solver
unnecessary -- counting candidates has no surprising behaviour, and a solver
can be added later without changing a single manifest.

Flavor is retired. It was carrying three unrelated meanings: variants of a
thing, a subset of a module a node installs, and whatever the current system
does, which earned two knowledge-base entries about going wrong. A word with
three meanings cannot be reasoned about. What it reached for is two ordinary
things -- different modules providing the same thing, and one module with a
setting.
2026-08-29 21:00:13 +02:00
jschoubben 333356cff3 Order the records the way the system is learned
Jochen asked whether the order made sense. It did not -- it followed when
things happened to be decided, which after consolidation is fictional anyway
since record 5 alone folds decisions taken across a week.

Concretely wrong before: the domain statement sat at 8, after five engineering
rules; the constitution was scattered across 5, 12 and 17; the tiers landed at
15, 16, 21 and 22 with process records in between.

Now it walks: what the mesh is (1-3), its tiers from the bottom up (4-8), what
runs on them and how it gets there (9-10), how it is built (11-16), how it is
checked (17-18), how we work (19-23).

Two things made this safe rather than free. It is a permutation, not a
compaction, so the renames go through temporary names -- otherwise two files
want one slot and one is lost. And the reference rewrite is a single
simultaneous pass, because almost every number moved into a slot another number
was vacating; replacing one at a time would have cascaded and pointed things at
the wrong record while still resolving.

Verified: 284 [ADR NNNN](path) links across the repository, all with matching
text and target.

The ordering principle is now stated in 19 rather than left implicit -- the
repository already said "the numbering is the flow" about its folders, and
there was no reason for the records to be the exception.
2026-08-28 23:30:42 +02:00
jschoubben e1febe8e0f Renumber the records 1 to 23
The consolidation left a sparse sequence -- 1, 4, 6, 7, 9, 10, 12, 15, 16, 18,
19, 25, 34, 35, 36, 37, 40, 42, 44, 45, 48, 49, 58 -- where the gaps were only
the archaeology of what used to be there.

Renumbered contiguously. Renames run in ascending order, so every target number
is already free and no two files ever collide.

The reference rewrite is one simultaneous pass rather than a sequence of
replacements. Numbers moved into slots other numbers were vacating -- the node
host went 37 to 16 while the lab went 16 to 9 -- so replacing one at a time
would have cascaded and silently pointed things at the wrong record.

Seven plain-text references survived the merges as prose rather than links,
naming records that no longer existed: the enrolment token, the link boundary,
what a declaration is, reachability, the repository structure. Each mapped to
the consolidated record that now holds it.

Verified rather than assumed: every [ADR NNNN](path) link now has matching text
and target, checked across the whole repository, and the checker passes.

Frontmatter `consolidates:` lists dropped -- they named records that are gone,
and each consolidated record already says in prose what it absorbed.
2026-08-28 23:28:34 +02:00
jschoubben c0b35652d0 The numbering is the flow: decisions are 02, design is 03
papa-hq reads 01 research -> 03 decision -> 02 design. The order is a
scar, not a choice: 02-DESIGN existed from its initial commit, and when
adr/ was finally promoted on 2026-07-13 it took the next free number
rather than its place in the sequence. By then design was too settled to
renumber.

hal-hq was three commits old, so it is not. adr/ becomes 02-DECISIONS and
02-DESIGN becomes 03-DESIGN, and following the folder numbers now walks
the process in the order it happens: research produces a decision, the
decision authorises a design.

00-GENESIS becomes 00-META, matching papa's rename from the same
restructure.

Every path reference rewritten across documents, frontmatter, playbooks
and skills. All links resolve; all 58 frontmatter blocks parse and their
path fields still point at files that exist.
2026-08-23 18:05:11 +02:00