@@ -125,18 +125,20 @@ never into the running one, unless it blocks the running one.
|
|
|
|
|
after; `gofmt`, `go vet` and the whole unit suite stay green. **The tests are written from the issue's
|
|
|
|
|
acceptance criteria**: one test or more per criterion at the level it names, each test's comment citing
|
|
|
|
|
the criterion it proves by its label (`// 1118/AC2`), and no criterion left without its test; an integration criterion is a test
|
|
|
|
|
that compiles and waits for the check step. The integration tests (`merge-check.sh` with the store and the
|
|
|
|
|
bus) wait for the check step.
|
|
|
|
|
that compiles while you work and runs in the one merge check before the push.
|
|
|
|
|
- **Nothing is pushed** and no pull request is opened in this step. Never land on a red check: run the
|
|
|
|
|
checks, read the result, then land in a separate step.
|
|
|
|
|
- **The fixing agent's brief** (the lead gives it with the context file): name your issue in every step and
|
|
|
|
|
message ("issue 805: landing in mesh-catalog"); reach the mesh only through the mesh MCP server, never ssh;
|
|
|
|
|
never push, open, merge or close a pull request; never write to a store's database by hand, a schema change
|
|
|
|
|
is a numbered migration and the consolidated schema; Go only unless the context file says otherwise; never
|
|
|
|
|
move another issue; **never run an integration test locally** (no `go test -tags integration`, no `merge-check.sh`,
|
|
|
|
|
no bus or store test run): compile them with `go vet -tags integration ./...` and leave the running to the
|
|
|
|
|
forge's merge check. On 2026-10-17 three fixing agents ran them anyway, one for minutes on end, because the
|
|
|
|
|
brief only said they wait for the check (the operator). Report back in under 150 words: commits, tests added and that they failed first, the
|
|
|
|
|
move another issue; **run the integration tests once before every push, not while developing** (the
|
|
|
|
|
operator, 2026-10-18): compile them with `go vet -tags integration ./...` while you work, and before the push
|
|
|
|
|
run the repository's whole merge check with `mesh-controller.try` on the pushed branch (the store and bus a
|
|
|
|
|
pull request's check gets) or `merge-check.sh` against a throwaway store, and push only on its pass. On
|
|
|
|
|
2026-10-18 three pushes in a row failed their first merge check on faults an integration run finds in a
|
|
|
|
|
minute (mesh-catalog #361, mesh-controller #380's stale keys, #381's 400 tests without the layout marker),
|
|
|
|
|
each costing a check, a fix and another check. Report back in under 150 words: commits, tests added and that they failed first, the
|
|
|
|
|
check results, anything you stopped on.
|
|
|
|
|
- **An agent that finds the code differs from its context file stops and reports** (file:line); the lead
|
|
|
|
|
settles it, updates the context file, and continues the agent.
|
|
|
|
@@ -175,8 +177,7 @@ never into the running one, unless it blocks the running one.
|
|
|
|
|
## Step 3 — Check (no review)
|
|
|
|
|
|
|
|
|
|
1. **Push every feature branch and open one pull request per repository, together.**
|
|
|
|
|
The integration tests
|
|
|
|
|
run only in the merge check (the operator, 2026-10-16), never before. Pull requests in two or
|
|
|
|
|
The integration tests ran once before the push (step 1); the merge check runs them again as the gate. Pull requests in two or
|
|
|
|
|
more repositories that share the branch name are one delivery group (ADR 0239 §2).
|
|
|
|
|
Where a session pushes through the forge tool `gitea_commit` (one commit on the forge's current base), the
|
|
|
|
|
reviewer first confirms that commit's tree equals the reviewed one. **Each pull request's description carries
|
|
|
|
@@ -268,7 +269,10 @@ It loops `mesh_wait` on the event families of what it watches (`mesh-delivery.tr
|
|
|
|
|
`mesh-delivery.group` for a delivery, for example) with a timeout under 60 seconds, since the call itself ends near
|
|
|
|
|
a minute. After every answer or timeout it reads the state from the verb that owns it (`mesh-delivery.show`,
|
|
|
|
|
`mesh-controller.plans`, `knowledge-base.get`), because an event only wakes it (ADR 0367). It finishes, and so wakes
|
|
|
|
|
the lead, when the state changes or the wait passes its bound. The lead never sleeps or polls by hand to wait.
|
|
|
|
|
the lead, when the state changes, when the wait passes its bound, **or when nothing changed for two minutes**
|
|
|
|
|
(the operator, 2026-10-18): a wait that stopped moving is a stall, never a wait. On 2026-10-18 a delivery plan stopped
|
|
|
|
|
at 12:46 because the bus refused the new controller's writes, its watcher waited for "done or failed", and the stall
|
|
|
|
|
was found ten minutes later only because the operator asked what was happening (issue 1121). The lead never sleeps or polls by hand to wait.
|
|
|
|
|
|
|
|
|
|
**Every ten minutes (the operator, 2026-10-17), every two minutes while a delivery plan runs, and at once when something lands, stops or
|
|
|
|
|
needs the operator,** the lead reports, in one of the two layouts below (the operator, 2026-10-16: an overview
|
|
|
|
|