+15
View File
@@ -403,6 +403,21 @@ issue whether it is being fixed in between, after the delivery, or waits, and on
moved to include it): one Approve, one delivery. The old Approve ask closes itself on the new head and the new
head is asked once its checks pass. How it is checked: a follow-up that sits in a second pull request while the
first still waits shows in `gitea.gitea_list_pull_requests` as two open pull requests of one lead.
6. **A member pins mesh-sdk only at a commit that is a pull request's head**, merged or open (2026-10-28: the check
refused a pin to a merge commit on main as "on no pull request", though its tree equalled the head's). How it is
checked: the check's pin step; a refusal "on no pull request" is this rule skipped.
7. **Two groups that pin the same module's mesh-sdk conflict in `go.mod` and `go.sum`.** The group that merges
second merges main in and re-pins once, to a pull request head that holds both changes, after the first group
is merged and not before (a re-pin before makes the first group conflict). How it is checked: the check's merge
step; a group that conflicts after the first one merged is this rule skipped.
8. **A group that adds a seat, a verb or a manifest field in mesh-sdk and uses it in a module's manifest in the
same group cannot pass its check** until the running assigner pins a mesh-sdk that defines it, because the
check composes with the running assigner's mesh-sdk (issue 1585). The assigner's pin ships first, as its own
release. How it is checked: the check's composition step; a composition refusing the new word in such a group
is this rule skipped.
9. **A new head on an open pull request needs its `Reviewed-by` line at that head before the Approve is asked,
even for a pin-only commit.** How it is checked: the Approve's ask names the review record;
an ask whose line names another commit is this rule skipped.
**One exception: a catalog change that uses a new manifest word.** The catalog's merge check reads
manifests with the controller the mesh runs, so the controller's pull request is merged and delivered first;