@@ -21,6 +21,16 @@ A small fix (one repository, one issue, about an hour of work) follows
|
|
|
|
|
undelivered for a day: an issue done at 21:09 was still not on the machines at 15:00 the next day.
|
|
|
|
|
- **Work that waits and nobody notices.** Most lost time was not work at all, but a check, a delivery plan
|
|
|
|
|
or an agent waiting on something that had stopped, unseen.
|
|
|
|
|
- **Review that keeps hardening.** One fix went through seven review rounds in five and a half hours, each
|
|
|
|
|
asking for more hardening than its issue asked (issue 704, 2026-10-14). A round is for what makes the
|
|
|
|
|
change wrong; everything else is an issue of its own.
|
|
|
|
|
- **The first check after the whole branch is written.** A feature's catalogue branch, pushed once after
|
|
|
|
|
hours of local work, met its first check on 2026-10-16 and failed on 29 problems, TypeScript errors among
|
|
|
|
|
them, that a unit suite run continuously while working finds at once.
|
|
|
|
|
- **A green pull request nobody marks.** An approved, green pull request that was not marked ready waited
|
|
|
|
|
12 h 17 min for someone to merge it (mesh-catalog #300, 2026-10-14).
|
|
|
|
|
- **A module proven only after it reached the machines.** The mail modules were delivered with unit tests
|
|
|
|
|
only, then failed live three times (issues 859, 865, 868) and took five more hours of fixes.
|
|
|
|
|
|
|
|
|
|
## The shape
|
|
|
|
|
|
|
|
|
@@ -104,13 +114,40 @@ never into the running one, unless it blocks the running one.
|
|
|
|
|
It says which round it is in ("round 1 of at most 3").
|
|
|
|
|
3. **The report goes to the same fixing agents** that wrote the code, continued by their ids, so they fix
|
|
|
|
|
with the context they already hold. Each answers the reviewer: what it changed, per finding, or why not.
|
|
|
|
|
4. **The reviewer reads the answers and the new commits**, and approves or reports again. From round 2 it
|
|
|
|
|
asks changes only for a finding that makes the feature wrong; smaller points become issues of their own.
|
|
|
|
|
After round 3 the lead stops and brings the operator what is left, with a recommendation.
|
|
|
|
|
4. **The reviewer reads the answers and the new commits**, and approves or reports again (step 5 says what a round
|
|
|
|
|
may ask). After round 3 the lead stops and brings the operator what is left, with a recommendation.
|
|
|
|
|
5. **A finding outside the issues' done-when is never a change asked, in any round.** More hardening, a
|
|
|
|
|
further case, a nicer form: the reviewer opens it with `issue-tracker.open` and names the number in its
|
|
|
|
|
report, and the round does not wait for it. What a round asks is only what makes the change wrong against
|
|
|
|
|
its issues and its decisions.
|
|
|
|
|
|
|
|
|
|
## Is the coast clear?
|
|
|
|
|
|
|
|
|
|
Before the push of phase 3 (and of a small fix, playbook [08](08-small-fixes.md) step 5), the lead checks, for every
|
|
|
|
|
repository the change touches, whether a **release branch** is in flight there: a branch other than `main` that
|
|
|
|
|
collects a feature's merged work to bring it into `main` as one delivery.
|
|
|
|
|
|
|
|
|
|
1. **Look for one.** A pull request into `main` whose head is a release branch (`gitea.gitea_open_pulls`), a
|
|
|
|
|
release branch holding merged work that `main` does not have yet (`git log origin/main..origin/<branch>`), or
|
|
|
|
|
a delivery plan of that release branch still running (`mesh-controller.plans`).
|
|
|
|
|
2. **Compare the files.** `git diff --name-only origin/main...origin/<release branch>` against the files the
|
|
|
|
|
change touches.
|
|
|
|
|
3. **Overlap: hold.** If the release branch touches a file the change touches, nothing is pushed into that repository
|
|
|
|
|
until the release branch's delivery plan is done. Then the feature branch is brought up to the new `main`, the unit
|
|
|
|
|
tests run again, and the push follows. The hold is on the wait list (its bound: the release branch's delivery plan),
|
|
|
|
|
and is said to the operator with what the change waits for.
|
|
|
|
|
4. **No overlap: go on.** A release branch in another repository, or one that shares no file with the change, does not
|
|
|
|
|
hold it; its merge joins the merge window as any other (ADR 0276).
|
|
|
|
|
|
|
|
|
|
Merging beside a release branch still in flight would make its lead resolve someone else's conflicts in the
|
|
|
|
|
middle of it, and could send part of the change with its delivery (2026-10-16: the file module's
|
|
|
|
|
controller part touched four files feature 57's release branch also changed).
|
|
|
|
|
|
|
|
|
|
## Phase 3 — Check (no review)
|
|
|
|
|
|
|
|
|
|
1. **Push every feature branch and open one pull request per repository, together.** Pull requests in two or
|
|
|
|
|
1. **Push every feature branch and open one pull request per repository, together, once the coast is clear**
|
|
|
|
|
(above). The integration tests
|
|
|
|
|
run only in the merge check (the operator, 2026-10-16), never before. Pull requests in two or
|
|
|
|
|
more repositories that share the branch name are one delivery group (ADR 0239 §2).
|
|
|
|
|
Where a session pushes through the forge tool `gitea_commit` (one commit on the forge's current base), the
|
|
|
|
|
reviewer first confirms that commit's tree equals the reviewed one.
|
|
|
|
@@ -118,8 +155,14 @@ never into the running one, unless it blocks the running one.
|
|
|
|
|
second review: phase 2 reviewed this tree.
|
|
|
|
|
3. **A check that fails** goes back to the reviewer with the failure, for **one more cycle** of phase 2 with
|
|
|
|
|
the same fixing agents; then push once again.
|
|
|
|
|
4. **Mark each pull request ready** (`mesh/ready` and a comment `ready at <full sha>`) once the operator's word
|
|
|
|
|
for the feature is given; mesh-delivery merges it when its checks pass (ADR 0364).
|
|
|
|
|
4. **The step's acceptance is proven before it is marked ready.** A step that adds or changes a module
|
|
|
|
|
carries an integration test that starts the module whole, its process against the real bus and store, and
|
|
|
|
|
shows the step's acceptance sentence; the forge's checks run it (ADR 0391 §1, §6). Unit tests alone are not
|
|
|
|
|
that proof; the mesh has no end-to-end tests yet, and the lab is not used (the operator, 2026-10-16).
|
|
|
|
|
5. **The reviewer marks each pull request ready as soon as the acceptance is shown** (`mesh/ready` and a
|
|
|
|
|
comment `ready at <full sha>`, the head it approved); mesh-delivery merges it when its checks pass
|
|
|
|
|
(ADR 0364). The operator's word is waited for only when the step changes what the operator sees, removes
|
|
|
|
|
data, or needs a step only the operator's terminal can take; the lead says which before the step starts.
|
|
|
|
|
|
|
|
|
|
**One exception: a catalogue change that uses a new manifest word.** The catalogue's merge check reads
|
|
|
|
|
manifests with the controller the mesh runs, so the controller's pull request is merged and delivered first;
|
|
|
|
@@ -127,7 +170,8 @@ then `mesh-delivery.recheck` the catalogue's and merge it on the new verdict. Pl
|
|
|
|
|
|
|
|
|
|
## Phase 4 — Deliver
|
|
|
|
|
|
|
|
|
|
The merge starts the delivery plan: build, publish, send. The lead follows it to done
|
|
|
|
|
The merge starts the delivery plan: build, publish, send. A merge into a branch other than `main` is not a
|
|
|
|
|
delivery: no machine receives it (issue 889 while it still starts one). The lead follows it to done
|
|
|
|
|
(`mesh-controller.plans` with `wait` and `until: done`), then resolves the feature's issues with `fixed-by`
|
|
|
|
|
naming its pull requests, and removes what is left: no `feat/<slug>` branch and no `.work/<slug>` worktree
|
|
|
|
|
survive.
|
|
|
|
@@ -156,6 +200,8 @@ on, with when it started and its bound.
|
|
|
|
|
| a fixing agent's issue | 30 minutes | ask it where it stands; split or take over |
|
|
|
|
|
| the review | 15 minutes a round | ask the reviewer; stop at round 3 |
|
|
|
|
|
| a merge check | 15 minutes | read the build queue (`mesh-controller.queue`) and the check's log |
|
|
|
|
|
| the ready mark | 15 minutes after the acceptance is shown | the reviewer marks it, or the lead does |
|
|
|
|
|
| a release branch in flight that shares files | its delivery plan done | report it every ten minutes; bring the branch up to `main` after |
|
|
|
|
|
| a merge after ready | 5 minutes after the checks pass | read `mesh-delivery.show` for the delivery |
|
|
|
|
|
| a delivery plan | its class's budget (`mesh-delivery.times`), at most 30 minutes | read `mesh-controller.plans`, then `mesh-delivery.stalled` |
|
|
|
|
|
|
|
|
|
@@ -200,6 +246,13 @@ lead prepares a `/clear` as the mesh's instruction "prepare before clear" says:
|
|
|
|
|
feature's phase, its branches and heads, the context files' paths, the agents' ids, the wait list and the
|
|
|
|
|
next action; then the prompt the operator pastes. The context files make the feature resumable after a clear.
|
|
|
|
|
|
|
|
|
|
## Issues that stop
|
|
|
|
|
|
|
|
|
|
An issue stays in `fixing` only while an agent works on it. A step that stops, for a wait past its bound, a
|
|
|
|
|
hand-over, or the session's end, moves each of its issues not delivered back to `open` with
|
|
|
|
|
`issue-tracker.move` and a note saying how far it got (its branch, its last commit, what is left). A list of
|
|
|
|
|
issues in `fixing` that nobody works on reads to the operator as stuck work.
|
|
|
|
|
|
|
|
|
|
## How it is checked
|
|
|
|
|
|
|
|
|
|
- A feature's issues show their commits on the feature branch (`git log --grep 'issue <n>'`), and no pull
|
|
|
|
@@ -209,6 +262,14 @@ next action; then the prompt the operator pastes. The context files make the fea
|
|
|
|
|
- After a feature's delivery, `git branch -r | grep feat/<slug>` and `git worktree list` return nothing for it.
|
|
|
|
|
- More than one open pull request in a repository that share no feature name, or a feature step whose issues
|
|
|
|
|
stay in `fixing` for more than a working day, is the smell: stop and bring it to the operator.
|
|
|
|
|
- A review report that asks a change outside the issues' done-when, or a fourth round, is the failure of the
|
|
|
|
|
review rules; `issue-tracker.list` with `flag: abandoned` lists issues left in `fixing` with nobody on them.
|
|
|
|
|
- A pull request reviewed and green but not marked ready for more than 15 minutes is a lead that did not
|
|
|
|
|
mark it.
|
|
|
|
|
- A pull request opened into a repository whose release branch was in flight and shared a file with it is the failure of
|
|
|
|
|
*Is the coast clear?*; the lead's report names the check it made before the push.
|
|
|
|
|
- A step that adds or changes a module marked ready with no integration test that starts the module whole is
|
|
|
|
|
the failure of phase 3's fourth step.
|
|
|
|
|
- A bed run from `.work/<slug>/mesh-lab` that fails naming a `.work/<slug>/<repo>/…` path it cannot find is a
|
|
|
|
|
missing sibling worktree, not a mesh fault.
|
|
|
|
|
|
|
|
|
|