Compare commits
1
Commits
| Author | SHA1 | Date | |
|---|---|---|---|
|
|
29ac1c7e52 |
@@ -2,12 +2,8 @@
|
||||
layer: to-be
|
||||
status: in-progress
|
||||
code: [mesh-controller, mesh-catalog modules/mesh-delivery, mesh-delivery, mesh-host, mesh-sdk]
|
||||
updated: 2026-10-20
|
||||
updated: 2026-10-19
|
||||
decisions:
|
||||
- "ADR 0453"
|
||||
- "ADR 0452"
|
||||
- "ADR 0450"
|
||||
- "ADR 0449"
|
||||
- "ADR 0447"
|
||||
- "ADR 0446"
|
||||
- "ADR 0445"
|
||||
@@ -89,8 +85,8 @@ source revision is derived from the keys: every **want** equals its module's **f
|
||||
forge.
|
||||
- **The indexer** computes each module's fingerprint at the merge preview and writes the candidates of each
|
||||
group and the modules of the trunk.
|
||||
- **The builder** claims a build by creating its key, once per fingerprint, and builds it; the builder is made in R4c from
|
||||
build-agent's code, and build-agent builds the builder's own module beside it until R4g, then leaves (ADR 0453 clause 5).
|
||||
- **The builder** claims a build by creating its key, once per fingerprint, and builds it; build-agent becomes
|
||||
this part.
|
||||
- **The checker** runs the merge check on built artifacts: a change's tests, through the build module of each
|
||||
module's language and by that language's convention, running only the packages whose inputs changed and
|
||||
taking the kept verdict of the rest; it writes the change's one status (ADR 0444, ADR 0445, ADR 0447).
|
||||
@@ -103,7 +99,7 @@ source revision is derived from the keys: every **want** equals its module's **f
|
||||
It also runs the **composition check**: whether the machines a change touches still compose with it, read
|
||||
from the keys the indexer and the builder hold and from what the controller keeps of machines, settings and
|
||||
grants, with the composition it sends with (ADR 0446). Its module
|
||||
is made in R4c for that check alone; its wants come in release 5.
|
||||
is made in release 4 for that check alone; its wants come in release 5.
|
||||
- **The node agent**, the node-engine's own process, applies its wants one module at a time, backs up a data
|
||||
module first, and writes its haves.
|
||||
- **The watchman** turns the bus's connections into presence and mirrors every key whose next move a machine
|
||||
@@ -328,15 +324,15 @@ commit on the SDK's trunk or the head of an SDK pull request the forge holds, op
|
||||
|
||||
*ADR 0444, ADR 0445, ADR 0446, ADR 0447; research 058.*
|
||||
|
||||
Until the status switch of release 4 (R4f) is delivered, the subsections above are the rule, with their two statuses.
|
||||
From its delivery, a check is this:
|
||||
Until release 4 is delivered, the subsections above are the rule, with their two statuses. From its delivery, a
|
||||
check is this:
|
||||
|
||||
- **One status per change.** A pull request carries one required status, `mesh/check`, written by the checker
|
||||
on its head; it passes only when the head merged onto its trunk's head passed its tests and the composition
|
||||
check. For a member of a delivery group it is the group's one verdict, the same on every member's head: every
|
||||
member's tests, read beside the others' heads, and one composition of all members' changes. It replaces
|
||||
`mesh/merge-gate` and `mesh/repo-check`; the forge requires it and the gate reads it from R4f, the delivery in which
|
||||
the checker's line is the only one (ADR 0447 §5); the checker writes it unrequired from R4c (ADR 0453 clause 4). `mesh/delivery-group` stays the delivery's view, not a required check. Wherever
|
||||
`mesh/merge-gate` and `mesh/repo-check`; the forge requires it, the checker writes it and the gate reads it from
|
||||
the same delivery (ADR 0447). `mesh/delivery-group` stays the delivery's view, not a required check. Wherever
|
||||
this design says both checks passed, they read this one status.
|
||||
- **What the status says.** Its line says the verdict, the tests run and kept at each level, the machines
|
||||
composed, and how long each part took: waiting in the queue, cloning, the unit level, the integration level's
|
||||
@@ -348,9 +344,8 @@ From its delivery, a check is this:
|
||||
are apart by construction; in Node and TypeScript, the type-check and the package's `test` script, and its
|
||||
`test:integration` script when it has one. A repository with no tests has none, and says so. Each level is
|
||||
judged by its own bounds: the unit level by its running time (five seconds), the integration level by its
|
||||
setup (thirty seconds) and its tests' running time (sixty seconds), measured and judged apart; the integration level's bounds fail a repository from its
|
||||
first check that meets them (ADR 0453 clause 9). A
|
||||
repository's `merge-check.sh` goes in R4g (ADR 0453 clause 8); hq, which builds no module, keeps its script until issue 1296 settles how
|
||||
setup (thirty seconds) and its tests' running time (sixty seconds), measured and judged apart. A
|
||||
repository's `merge-check.sh` goes; hq, which builds no module, keeps its script until issue 1296 settles how
|
||||
it is checked (ADR 0445).
|
||||
- **Only what changed runs.** The build module names, from the toolchain, everything each package's tests read,
|
||||
and the checker keeps a package's passing verdict at each level under the digest of those inputs. A check
|
||||
@@ -517,9 +512,9 @@ delivery time.
|
||||
- **Builds and tests run directly**, as the build seat's own account on its node, in no container. The
|
||||
build module of each module's language runs its tests by that language's convention; no repository's
|
||||
script or toolchain line decides it, hq's alone excepted until issue 1296 (ADR 0445).
|
||||
- **A judge has an account of its own, until release 4 is delivered (R4f).** Until then, a judge built from a sibling's
|
||||
- **A judge has an account of its own, until release 4 is delivered.** Until then, a judge built from a sibling's
|
||||
merge (ADR 0382 §3) is built and run as a second account of the Go build module, whose home, configuration and
|
||||
cache the build seat's account cannot write, so a check's script cannot change it. From R4f no judge is
|
||||
cache the build seat's account cannot write, so a check's script cannot change it. From release 4 no judge is
|
||||
built from a change and the account is not made (ADR 0446 §5).
|
||||
- **Every dependency comes by the version its lock file names**, checked against its checksum: the mesh's own
|
||||
code from the mesh's forge, its own packages from its package registry, any other from its public source.
|
||||
@@ -689,7 +684,7 @@ development, the check's share about a minute):
|
||||
group's merges (ADR 0418 §1, §5, §6).
|
||||
- The controller's tables of builds, build requests, rollouts and their tiers, batches and merges, and
|
||||
assignments; the record mirrors, probe D17's audit and healer H6 for those kinds (ADR 0408).
|
||||
- At release 4's deliveries (R4f for the merge gate, the judge and the two statuses; R4g for the scripts): `merge-check.sh` and its `# mesh-check-toolchain` line in every repository a module is
|
||||
- At release 4's delivery: `merge-check.sh` and its `# mesh-check-toolchain` line in every repository a module is
|
||||
built from, hq's alone kept until issue 1296 (ADR 0445 §6); the controller's merge gate, composing every
|
||||
machine from clones and throwaway stores (ADR 0446 §1, §6); the judge built from a change and the Go build
|
||||
module's second account for it (ADR 0446 §5); and the two statuses `mesh/merge-gate` and `mesh/repo-check`
|
||||
@@ -714,7 +709,7 @@ release reports the controller's code lines against research 063's baseline (acc
|
||||
| 3 fix | A group approved together merges in one pass and goes out in one delivery plan, also when its members' tests read each other's repositories | 1 | mesh-catalog (mesh-delivery, gitea) | 1082, 1049, 1047, 1083, 1079 (1084 closed as its duplicate) |
|
||||
| 5 | One read of a module on a node names the commit, build and rollout that put it there | 10, 12 | mesh-controller, mesh-catalog (mesh-config, nats) | 981 |
|
||||
| 5b | Decided: building and delivering leave the controller for parts that watch and write keys in the repository `mesh-delivery`, landing in six releases (ADR 0429); the forge module makes that repository from its config, protected before any team reaches it (ADR 0428) | — (ADR 0429 names them: 13 to 20) | hq, mesh-catalog (gitea) | 1117, 1124, 1128 |
|
||||
| 6 | Folded into release 4 by ADR 0429 §10 (the fetch over SSH in R4c, the cut-over in R4e): installed toolchains, builders fetching over SSH with their own key, and an SDK change shipping with its users are built in the builder's new home, so the builder is changed once | (2: proved by R4e; 4: in part by R4e, wholly by R4g) | — | 979, 971 (moved to release 4) |
|
||||
| 6 | Folded into release 4 by ADR 0429 §10: installed toolchains, builders fetching over SSH with their own key, and an SDK change shipping with its users are built in the builder's new home, so the builder is changed once | (2, 4: proved by release 4) | — | 979, 971 (moved to release 4) |
|
||||
| R1a | The node-engine, the controller and the parts can read one layout of the have, presence, pulse and stuck keys: mesh-sdk ships it before its users | — (13, 14 need it) | mesh-sdk | 1131 (key layouts) |
|
||||
| R1b | Every node writes what it runs of each module, on its own keys and nobody else's, and the bus says to one part when a connection opens and closes | 13 in part | the node-engine (`mesh-host`), mesh-controller | 1132 (have keys), 1142 (the node-engine's check, its tests half), 1136 (the have bucket and its grants), 1145 (a module and a build per resource), 1146 (a new repository's first module registered at its merge's Approve), 1147 (the bus's connect events for the watchman), 1160 (a plan passes a machine silent at a middle tier), 1162 (the have bucket takes a node's facts) |
|
||||
| R1c | The operator sees every module on every node, with its build, phase and health, in `mesh-delivery-cli` (aliased `nox-delivery`) and its web view | 13 | mesh-delivery (view) | 1134 (the view), 1137 (the alias, in the view's manifest) |
|
||||
@@ -725,28 +720,18 @@ release reports the controller's code lines against research 063's baseline (acc
|
||||
| R3a | The gate, the bridge, the indexer and the teller can read one layout of the source revision, candidates, modules, merges, asks, answers, owed acts, forge messages and conditions, and one function computes the source fingerprint: mesh-sdk ships them before their users (ADR 0437) | — (15 needs it) | mesh-sdk | 1200 (source revision, candidates, modules, forge messages), 1201 (merges, asks, owed acts, answers), 1202 (a condition on its one subject), 1203 (the source fingerprint, proven against three fingerprints the live builder recorded); ahead of it in mesh-controller, so those could be read: 1204 and 1208 (`builds` says each build's source fingerprint) |
|
||||
| R3b | The controller finds the delivery seat's holder by its claim and records each build's fingerprint inputs; the router takes conditions on their one subject; the operator sees no change (ADR 0437) | — | mesh-controller, mesh-catalog (messenger) | 1210 (the controller's own path and the merge gate's rule by the seat's claim), 1211 (a merge's announcement heard from the seat's holder), 1212 (the pull requests' keys read from the holder's bucket), 1213 (a merge's warrant read under the asker the announcement names: the teller, or mesh-delivery until R3d), 1214 (the builder computes the source fingerprint with mesh-sdk's function), 1215 (a build record carries its fingerprint's inputs), 1216 (a module may say a condition only under its own name, proven on the controller's grant); in the messenger: 1217 (the router takes a condition on its one subject), 1218 (the same over the bus); one delivery group. Its prepare step found that the controller hears no `transition` or `group` event, and that the router cannot refuse a condition under another module's name, the grant does: both go into R3c's insight on ADR 0437 with 1209 |
|
||||
| R3c | The forge bridge, the indexer and the teller run beside today's mesh-delivery and write their keys; the view shows modules against the controller's source fingerprints; nothing is merged by them yet (ADR 0437) | 15 in part | mesh-delivery (forge bridge, indexer, teller, view), mesh-catalog (the forge module) | 1235 (the forge bridge writes pull messages on FORGE), 1236 (its merged message, with the trees of the merge commit), 1237 (its messages for the pull requests open at its start and each reconnect), 1238 (the indexer writes the candidate groups), 1239 (the indexer writes the modules' fingerprints at a trunk merge, and 1209: none for an image that compiles a Go program from a context), 1240 (the teller runs and carries nothing yet), 1241 (the view shows the candidate groups and each module's fingerprint against the controller's); in the forge module: 1234 (a merge commit's trees in one call, and the head branch in the open pull requests); one delivery group, mesh-catalog first. Its prepare step found three orders: the forge had no tool for a commit's trees, so the forge module joins the milestone as a member of its group; and mesh-sdk shipped two layouts before it, the controller's build record (1223) and a build's directory and a pull request's module directories (1233). It also found that the bridge's FORGE is a stream the others hear by `consumes`, not a bucket they `read`; that the broker test of the three credentials goes into R3d with the gate's (1243); and that the parts hand-write their bus connection until mesh-sdk gives one (1242): facts for ADR 0437's next insight, with R3d's |
|
||||
| R3d | The gate's keys can carry what the forge needs and the controller answers a what-if as data, so the gate has what it reads before it runs; a failed delivery plan asks the operator Retry on the phone, and a seat whose holder is assigned nowhere passes to its only claimant; the operator sees only the Retry notice (ADR 0450, ADR 0449) | — | mesh-sdk, mesh-controller | in mesh-sdk: 1321 (a merge key carries the Approve's heads), 1322 (an owed act carries a status's target, a commit without a pull request, two comments), 1323 (a name a key cannot hold is escaped); in mesh-controller: 1324 (what-if as data), 1325 (the build seat reads the gate's pull keys), 1326 (the gate's buckets writable by its runner only), 1243 (the three parts' credentials); and, delivered first as feature no-terminal (ADR 0449): 1317 (the seat passes to its only claimant), 1314 (a failed delivery plan raises a condition), 1315 (Retry offered and performed), 1316 (a refused answer is told). Its prepare step found four things the gate reads that ship before it, which cut the former R3d in two (ADR 0450), and two steps on the path that needed the operator's terminal (ADR 0449) |
|
||||
| R3e | A group reaches the mesh as one source revision written by the gate; the merge's Approve is asked by the teller and answered on the phone until issue 953; the view shows the open asks; today's module mesh-delivery is carried over into the gate when it first holds the seat and ends; no step needs the operator's terminal (ADR 0437, ADR 0450) | 15 | mesh-delivery (gate's parts: forge bridge, teller, indexer, view), mesh-catalog (the gate, mesh-delivery removed, mesh-issues), mesh-tools (the tool runner's waits) | opened when it is prepared, from R3d's survey; the controller's deletions it makes possible go to release 4 (1318) |
|
||||
| R4a | The shared layouts of release 4 are on mesh-sdk's main before their users pin them: the catalogue, the validator and the composition over a plain input, the fingerprint's new form, and the key layouts of the builder, the checker, the kept verdicts, the manifests and the candidates; the node-engine reports the user namespaces capability (ADR 0453 clauses 1, 2, 3) | — (2 needs it) | mesh-sdk, the node-engine (`mesh-host`) | in mesh-sdk: 1353 to 1364, 1298 (the composition over a plain input); in the node-engine: 1308 (the user namespaces capability) |
|
||||
| R4b | mesh-controller and the node-engine use the catalogue, the validator and the composition from mesh-sdk and delete their copies; the controller composes every node both ways on the live facts and the two agree before this is delivered; it writes the grants and credential bindings the assigner reads; its unit level meets its bound (ADR 0453 clauses 1, 3) | — | mesh-controller, the node-engine (`mesh-host`) | 1375 (to be split when it is prepared), 1337 (the unit level's bound) |
|
||||
| R4c | The new parts run dark beside today's: the indexer writes the manifests by digest and the fingerprints in the new form beside today's (its own, first delivery), then the build modules (the Go build module, the Node and TypeScript build module: toolchain, sandbox, fetch, digest, test, build), the builder, the checker writing `mesh/check` as a status the forge does not require, and the assigner's composition check writing into the checker's report; the build seat's accounts are decided by a record before the fetch step merges (ADR 0453 clauses 4, 6, 7, 8, 11, 12, 16) | 22, 23 (measured on the dark run, proved in R4f) | mesh-delivery (indexer, builder, checker, assigner's composition check), mesh-catalog (build modules, ssh-client, gitea), mesh-controller (the build agent's whole-check tests, the script's steps as tests), mesh-sdk | 971 (its record first), 1297 (the assigner's composition check), 1309 (the fetch and run steps), 1287, 1288, 1289, 1290, 1291, 1292 (the checker; the build modules run the tests), 1251; the steps of 1293 and 1294 that are no test become tests in R4c to R4e; the rest opened when it is prepared |
|
||||
| R4d | Four modules stop being built from a Dockerfile: route-proxy, nats, n8n and mail's autoconfiguration module (automx, replaced by a Go program), each rework its own release step, nats in a delivery of its own; free between R4a and R4e and never in the same delivery as another release (ADR 0452, ADR 0453 clauses 13, 14, 16) | — | mesh-catalog, mesh-controller (route-proxy), the node-engine (`mesh-host`: n8n's supplementary group) | the four image reworks, opened when it is prepared |
|
||||
| R4e | The controller asks no build: a build is keyed by its fingerprint, the new form becomes the only one as one group, and a merge builds nothing its check built; builders fetch over SSH, so an SDK change ships with its users; the vendored copies leave mesh-controller and mesh-sdk; delivered only once the builder's artifact digests equal build-agent's (ADR 0453 clauses 2, 4, 5, 6) | 16, 2, 4 in part | mesh-controller (builds are no longer asked), mesh-delivery (builder), mesh-sdk | 979 (the installed toolchains; closed with the toolchain images in R4g), 1304, 1305, the controller asking no build (opened when it is prepared) |
|
||||
| R4f | A pull request carries one required status that says what it proved and how long each part took; the controller's merge gate and its replays are deleted with the two old statuses; the controller's deletions R3e makes possible go; each level's times are measured, and a bound fails a repository from the first check that meets it (ADR 0447, ADR 0450 §8, ADR 0453 clauses 4, 9, 10) | 21, 22, 23, 24 (the status; the scripts' absence is proved in R4g) | mesh-delivery (checker, assigner), mesh-controller (merge gate, replays, `delivery-plan`, `forget-checks`, the asker `mesh-delivery` deleted), mesh-catalog (gitea) | 1299 (the merge gate deleted; closes issue 709, the replays' socket), 1300, 1301, 1302 (one status), 1318 |
|
||||
| R4g | The clean-up: the scripts of the repositories a module is built from, build-agent with its socket and Dockerfile code, the toolchain images and the word merge gate go; the builder's own module is delivered from the builder's keys (ADR 0453 clauses 5, 8, 10) | 4 (no container image builds remain), 24 (no `merge-check.sh` in a repository a module is built from) | mesh-controller (build-agent removed), mesh-catalog, mesh-delivery, mesh-tools (scripts deleted), hq | 1295 (`merge-check.sh` goes; the tests of 1293 and 1294 are R4c to R4e's), 979 (closed with the toolchain images), 1303 (the word merge gate struck); 1296 (how hq is checked) is the operator's and undated by this release |
|
||||
| R3d | A group reaches the mesh as one source revision written by the gate; the merge's Approve is asked by the teller and answered on the phone until issue 953; the view shows the open asks; today's module mesh-delivery is carried over into the gate and ends (ADR 0437) | 15 | mesh-delivery (gate, forge bridge, teller), mesh-catalog (mesh-delivery removed, mesh-issues) | opened when it is prepared |
|
||||
| R4 | The controller asks no build: a build is keyed by its fingerprint, so a merge builds nothing its check built; with milestone 6, toolchains are installed, builders fetch over SSH, and an SDK change ships with its users; a check runs only what changed, its tests by the language's build module, its composition by the assigner, and says in one status what it proved and how long each part took (ADR 0444 to ADR 0447) | 16, 2, 4, 21 to 24 | mesh-delivery (builder, checker, assigner's composition check), mesh-controller (build dispatch and merge gate deleted; build-agent leaves), mesh-catalog (build modules, ssh-client, gitea), mesh-sdk (the composition), the node-engine (`mesh-host`) and mesh-tools (scripts deleted), hq | 979, 971; the check: 1287, 1288, 1289 (kept verdicts, the change's own tests first), 1290, 1291, 1292 (the build modules run the tests), 1293, 1294, 1295 (`merge-check.sh` goes), 1296 (how hq is checked: the operator's), 1297, 1298 (the assigner's composition check), 1299 (the controller's merge gate deleted), 1300, 1301, 1302 (one status), 1303 (the word merge gate struck); the rest opened when it is prepared |
|
||||
| R5 | The assigner writes what each node should run by its six rules, compared with what the controller sends, and the view shows every difference; the operator answers the asks that need no proof of who answered in the view (ADR 0437 §10) | 17 | mesh-delivery (assigner), mesh-controller (grants keys) | opened when it is prepared |
|
||||
| R6 | Each node applies from its wants, a new version reaches the module's canary first and the rest once it is healthy there, and the plans are deleted from the code | 18, 19 | the node-engine (`mesh-host`: the node agent), mesh-controller (plans deleted), mesh-delivery (the gate's delivery states go) | opened when it is prepared |
|
||||
|
||||
The issues are linked `depends-on` in this order; 976 depends on 975, and 979 also on 971. R3's prepare step on 2026-10-19 found ADR 0429 §20 contradicting itself and four release orders; ADR 0437 (accepted, the operator's Approve) cuts release 3 into R3a to R3d, each one release, and moves answering asks in the view to R5. R2c's prepare step on 2026-10-19 found one more order: the alive message is the only source of when the controller last heard a machine, which `nodes`, `node` and `status` read, so the controller takes that from presence (1183, R2c) and is delivered before the node-engine stops sending (1158, R2d); 1158 depends on 1183. In release 1-2, 1132 and 1136 depend on 1131, 1134 and 1135 on 1136, 1134 also on 1132 and 1128, and 1137 on 1134. Release 1-2 was confirmed as one milestone; its prepare step on 2026-10-18 found the release orders hidden in it, and the operator chose at 18:52 to cut it by them, so it is the milestones R1a to R2d above, each one release (the operator, 2026-10-19: a milestone is one release): an SDK change still ships before its users until R4e (ADR 0429 §10, ADR 0453 clause 2); a new key on the wire goes only to a node that says it reads it; a new repository's first module registers at its merge's Approve (ADR 0432, issue 1146); the bus gives the watchman connect events only through a system account (ADR 0431); and release 2's other gaps are settled by ADR 0433 and ADR 0434. A node that is down has no effect on a delivery and plays what it missed when it returns (ADR 0435, the operator, 2026-10-18; issues 1160, 1161). Milestone 3's first live group (milestone 4's, on 2026-10-17) held one Approve but merged in two passes and went out in two delivery plans: a member's tests read the other member's repository, so the first merge made the second's verdict out of date, and a closed group never asked its composed verdict again (issues 1049, 1082). The operator put a fix of milestone 3 after milestone 4 and before milestone 5 on 2026-10-18; acceptance test 1 is proved again by it. The operator put milestone 5b after milestone 5 and before milestone 6 on 2026-10-18, as an issue rather than a research effort; where the planning goes is settled by a decision record before it is built (issue 1117), and milestone 6's build changes are read against it. Milestone 2b was
|
||||
The issues are linked `depends-on` in this order; 976 depends on 975, and 979 also on 971. R3's prepare step on 2026-10-19 found ADR 0429 §20 contradicting itself and four release orders; ADR 0437 (accepted, the operator's Approve) cuts release 3 into R3a to R3d, each one release, and moves answering asks in the view to R5. R2c's prepare step on 2026-10-19 found one more order: the alive message is the only source of when the controller last heard a machine, which `nodes`, `node` and `status` read, so the controller takes that from presence (1183, R2c) and is delivered before the node-engine stops sending (1158, R2d); 1158 depends on 1183. In release 1-2, 1132 and 1136 depend on 1131, 1134 and 1135 on 1136, 1134 also on 1132 and 1128, and 1137 on 1134. Release 1-2 was confirmed as one milestone; its prepare step on 2026-10-18 found the release orders hidden in it, and the operator chose at 18:52 to cut it by them, so it is the milestones R1a to R2d above, each one release (the operator, 2026-10-19: a milestone is one release): an SDK change still ships before its users until release 4 (ADR 0429 §10); a new key on the wire goes only to a node that says it reads it; a new repository's first module registers at its merge's Approve (ADR 0432, issue 1146); the bus gives the watchman connect events only through a system account (ADR 0431); and release 2's other gaps are settled by ADR 0433 and ADR 0434. A node that is down has no effect on a delivery and plays what it missed when it returns (ADR 0435, the operator, 2026-10-18; issues 1160, 1161). Milestone 3's first live group (milestone 4's, on 2026-10-17) held one Approve but merged in two passes and went out in two delivery plans: a member's tests read the other member's repository, so the first merge made the second's verdict out of date, and a closed group never asked its composed verdict again (issues 1049, 1082). The operator put a fix of milestone 3 after milestone 4 and before milestone 5 on 2026-10-18; acceptance test 1 is proved again by it. The operator put milestone 5b after milestone 5 and before milestone 6 on 2026-10-18, as an issue rather than a research effort; where the planning goes is settled by a decision record before it is built (issue 1117), and milestone 6's build changes are read against it. Milestone 2b was
|
||||
put before milestone 3 by the operator on 2026-10-17. Milestone 3 builds ADR 0418, ADR 0419 and ADR 0421
|
||||
(issues 977, 978 and 1022), and splits mesh-controller's unit tests from its integration tests (issue 895, the
|
||||
operator on 2026-10-17), so the unit level holds its bound of ADR 0391; the integration level's sixty seconds
|
||||
is issue 1055. Acceptance test 6 spoke of a ready mark when milestone 2 was delivered; restated for
|
||||
the Approve, it is proved again by milestone 3.
|
||||
|
||||
R4's prepare step on 2026-10-20 cut release 4 by its orders into R4a to R4g, each one release (ADR 0453, the operator's Approve): the SDK ships before its users, the new parts run dark before anything relies on them, the status switch follows a measured run, and the scripts and build-agent go last;
|
||||
R4d, the four image reworks, has no order of its own and may be delivered at any point between R4a and R4e. Where a record dates a rule by release 4, it reads the R4 release that builds the rule (ADR 0453 clause 15).
|
||||
|
||||
## What is not decided here
|
||||
|
||||
- A web view of deliveries beyond the pull request's comment.
|
||||
|
||||
Reference in New Issue